Files
ATOCore/tests/test_prompts/gigabit_prompts.yaml

41 lines
1.3 KiB
YAML
Raw Normal View History

prompts:
- id: g1
prompt: "What is the GigaBIT M1 project about?"
project: gigabit
expected: "Should mention 1.2m primary mirror, StarSpec, telescope"
- id: g2
prompt: "What are the main requirements for the M1 mirror?"
project: gigabit
expected: "Should mention optical/mechanical requirements, SOW, diameter, Zerodur"
- id: g3
prompt: "What vendors are involved in the project?"
project: gigabit
expected: "Should mention Optiques Fullum, StarSpec, Atomaste, or subcontractors"
- id: g4
prompt: "What is the status of the CDR?"
project: gigabit
expected: "Should mention Critical Design Review status, CBUSH, design completion"
- id: g5
prompt: "What are the key design decisions made so far?"
project: gigabit
expected: "Should mention design phases, PDR, assumptions, blank order"
- id: g6
prompt: "What FEA optimization work has been done?"
project: gigabit
expected: "Should mention FEA analysis, optimization approach, WFE, displacement data"
- id: g7
prompt: "What is the cost reduction strategy?"
project: gigabit
expected: "Should mention cost reduction campaign, trade-off, topology selection"
- id: g8
prompt: "What are the mirror blank specifications?"
project: gigabit
expected: "Should mention 1200mm diameter, Zerodur, optical specifications"