"prompt":"what mirror architecture was selected for GigaBIT M1 and why",
"expect_present":[
"--- Trusted Project State ---",
"Option B",
"conical",
"--- Project Memories ---"
],
"expect_absent":[
"p06-polisher",
"folded-beam"
],
"notes":"Canonical p04 decision — should surface both Trusted Project State (selected_mirror_architecture) and the project-memory band with the Option B memory"
},
{
"name":"p04-constraints",
"project":"p04-gigabit",
"prompt":"what are the key GigaBIT M1 program constraints",
"expect_present":[
"--- Trusted Project State ---",
"Zerodur",
"1.2"
],
"expect_absent":[
"polisher suite"
],
"notes":"Key constraints are in Trusted Project State (key_constraints) and in the mission-framing memory"
},
{
"name":"p05-configuration",
"project":"p05-interferometer",
"prompt":"what is the selected interferometer configuration",
"notes":"P05 architecture memory covers folded-beam + CGH. GigaBIT M1 is the mirror under test and legitimately appears in p05 source docs (the interferometer measures it), so we only flag genuinely p04-only decisions like the mirror architecture choice."