docs: reflect V1-0 landed + V1 completion track active + resume map
- current-state.md: header bumped to 2026-04-22, live_sha 2712c5d,
547 tests. New "V1-0 landed" section covers what merged, what the
prod backfill did, and where the next phase stands.
- master-plan-status.md: new "Active - Engineering V1 Completion
Track (started 2026-04-22)" section between Now and Next.
Contains the 7-phase table with V1-0 marked done, V1-A gated,
V1-B..V1-F pending. V1 removed from the "Next" section since it
is now Active.
- DEV-LEDGER.md Orientation: two new pointers — active_track points
to the completion plan + resume map; open_branches points to the
R14 branch still awaiting Codex review.
- docs/plans/v1-resume-state.md (new): single-page "you are here"
for any future session. Covers state of play, start-gates for
V1-A, pre-flight checklist, phase map, parallel-safe work, do-nots,
open findings, agreement protocol history, reference index.
Designed to be cold-readable — no prior session context required.
No code changes.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -168,16 +168,40 @@ These are the current practical priorities.
|
||||
"Zerodur" for p04 constraint queries. Investigate if it's a missing
|
||||
memory or retrieval ranking issue.
|
||||
|
||||
## Active — Engineering V1 Completion Track (started 2026-04-22)
|
||||
|
||||
The Engineering V1 sprint moved from **Next** to **Active** on 2026-04-22.
|
||||
The discovery from the gbrain review was that V1 entity infrastructure
|
||||
had been built incrementally already; the sprint is a **completion** plan
|
||||
against `engineering-v1-acceptance.md`, not a greenfield build. Full plan:
|
||||
`docs/plans/engineering-v1-completion-plan.md`. "You are here" single-page
|
||||
map: `docs/plans/v1-resume-state.md`.
|
||||
|
||||
Seven phases, ~17.5–19.5 focused days, runs in parallel with the Now list
|
||||
where surfaces are disjoint, pauses when they collide.
|
||||
|
||||
| Phase | Scope | Status |
|
||||
|---|---|---|
|
||||
| V1-0 | Write-time invariants: F-1 header fields + F-8 provenance enforcement + F-5 hook on every active-entity write + Q-3 flag-never-block | ✅ done 2026-04-22 (`2712c5d`) |
|
||||
| V1-A | Minimum query slice: Q-001 subsystem-scoped variant + Q-6 killer-correctness integration test on p05-interferometer | 🟡 gated — starts when soak (~2026-04-26) + density (100+ active memories) gates clear |
|
||||
| V1-B | KB-CAD + KB-FEM ingest (`POST /ingest/kb-cad/export`, `POST /ingest/kb-fem/export`) + D-2 schema docs | pending V1-A |
|
||||
| V1-C | Close the remaining 8 queries (Q-002/003/007/010/012/014/018/019; Q-020 to V1-D) | pending V1-B |
|
||||
| V1-D | Full mirror surface (3 spec routes + regenerate + determinism + disputed + curated markers) + Q-5 golden file | pending V1-C |
|
||||
| V1-E | Memory→entity graduation end-to-end + remaining Q-4 trust tests | pending V1-D (note: collides with memory extractor; pauses for multi-model triage work) |
|
||||
| V1-F | F-5 detector generalization + route alias + O-1/O-2/O-3 operational + D-1/D-3/D-4 docs | finish line |
|
||||
|
||||
R14 (P2, non-blocking): `POST /entities/{id}/promote` route returns 500
|
||||
on the new V1-0 `ValueError` instead of 400. Fix on branch
|
||||
`claude/r14-promote-400`, pending Codex review.
|
||||
|
||||
## Next
|
||||
|
||||
These are the next major layers after the current stabilization pass.
|
||||
These are the next major layers after V1 and the current stabilization pass.
|
||||
|
||||
1. Phase 6 AtoDrive — clarify Google Drive as a trusted operational
|
||||
source and ingest from it
|
||||
2. Phase 13 Hardening — Chroma backup policy, monitoring, alerting,
|
||||
failure visibility beyond log files
|
||||
3. Engineering V1 implementation sprint — once knowledge density is
|
||||
sufficient and the pipeline feels boring and dependable
|
||||
|
||||