docs(planning): V1 Completion Plan + gbrain-plan rejection record
- docs/decisions/2026-04-22-gbrain-plan-rejection.md: record of gbrain-inspired "Phase 8 Minions + typed edges" plan rejection. Three high findings from Codex verified against cited architecture docs (ontology V1 predicate set, canonical entity contract, master-plan-status Now list sequencing). - docs/plans/engineering-v1-completion-plan.md: seven-phase plan for finishing Engineering V1 against engineering-v1-acceptance.md. V1-0 (write-time invariants: F-8 provenance + F-5 hooks + F-1 audit) as hard prerequisite per Codex first-round review. Per- criterion gap audit against each F/Q/O/D acceptance item with code:line references. Explicit collision points with the Now list; schedule shifted ~4 weeks to avoid pipeline-soak window. Awaiting Codex file-level audit. - DEV-LEDGER.md: Recent Decisions + Session Log entries covering both the rejection and the revised plan. No code changes. Docs + ledger only. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -146,6 +146,8 @@ One branch `codex/extractor-eval-loop` for Day 1-5, a second `codex/retrieval-ha
|
||||
|
||||
## Recent Decisions
|
||||
|
||||
- **2026-04-22** **Engineering V1 Completion Plan revised per Codex first-round review** — original six-phase order (queries → ingest → mirror → graduation → provenance → ops) rejected by Codex as backward: provenance-at-write (F-8) and conflict-detection hooks (F-5 minimal) must precede any phase that writes active entities. Revised to seven phases: V1-0 write-time invariants (F-8 + F-5 hooks + F-1 audit) as hard prerequisite, V1-A minimum query slice proving the model, V1-B ingest, V1-C full query catalog, V1-D mirror, V1-E graduation, V1-F full F-5 spec + ops + docs. Also softened "parallel with Now list" — real collision points listed explicitly; schedule shifted ~4 weeks to reflect that V1-0 cannot start during pipeline soak. Withdrew the "50–70% built" global framing in favor of the per-criterion gap table. Workspace sync note added: Codex's Playground workspace can't see the plan file; canonical dev tree is Windows `C:\Users\antoi\ATOCore`. Plan: `docs/plans/engineering-v1-completion-plan.md`. Awaiting Codex file-level audit once workspace syncs. *Proposed by:* Claude. *First-round review by:* Codex.
|
||||
- **2026-04-22** gbrain-inspired "Phase 8 Minions + typed edges" plan **rejected as packaged** — wrong sequencing (leapfrogged `master-plan-status.md` Now list), wrong predicate set (6 vs V1's 17), wrong canonical boundary (edges-on-wikilinks instead of typed entities+relationships per `memory-vs-entities.md`). Mechanic (durable jobs + typed graph) deferred to V1 home. Record: `docs/decisions/2026-04-22-gbrain-plan-rejection.md`. *Proposed by:* Claude. *Reviewed/rejected by:* Codex. *Ratified by:* Antoine.
|
||||
- **2026-04-12** Day 4 gate cleared: LLM-assisted extraction via `claude -p` (OAuth, no API key) is the path forward. Rule extractor stays as default for structural cues. *Proposed by:* Claude. *Ratified by:* Antoine.
|
||||
- **2026-04-12** First live triage: 16 promoted, 35 rejected from 51 LLM-extracted candidates. 31% accept rate. Active memory count 20->36. *Executed by:* Claude. *Ratified by:* Antoine.
|
||||
- **2026-04-12** No API keys allowed in AtoCore — LLM-assisted features use OAuth via `claude -p` or equivalent CLI-authenticated paths. *Proposed by:* Antoine.
|
||||
@@ -160,6 +162,12 @@ One branch `codex/extractor-eval-loop` for Day 1-5, a second `codex/retrieval-ha
|
||||
|
||||
## Session Log
|
||||
|
||||
- **2026-04-22 Claude (night)** Codex first-round review of the V1 Completion Plan summary came back with four findings. Three substantive, one workspace-sync: (1) "50–70% built" too loose — replaced with per-criterion table, global framing withdrawn; (2) phase order backward — provenance-at-write (F-8) and conflict hooks (F-5 minimal) depend-upon by every later phase but were in V1-E; new V1-0 prerequisite phase inserted to establish write-time invariants, and V1-A shrunk to a minimum query slice (four pillars Q-001/Q-005/Q-006/Q-017 + Q-6 integration) rather than full catalog closure; (3) "parallel with Now list / disjoint surfaces" too strong — real collisions listed explicitly (V1-0 provenance + memory extractor write path, V1-E graduation + memory module, V1-F conflicts migration + memory promote); schedule shifted ~4 weeks, V1-0 cannot start during pipeline soak; (4) Codex's Playground workspace can't see the plan file or the `src/atocore/engineering/` code — added a Workspace note to the plan directing per-file audit at the Windows canonical dev tree (`C:\Users\antoi\ATOCore`) and noting the three visible file paths (`docs/plans/engineering-v1-completion-plan.md`, `docs/decisions/2026-04-22-gbrain-plan-rejection.md`, `DEV-LEDGER.md`). Revised plan estimate: 12–17 days across 7 phases (up from 11–14 / 6), ~65 tests added (up from ~50). V1-0 is a hard prerequisite; no later phase starts until it lands. Pending Antoine decision on workspace sync (commit+push vs paste-to-Codex) so Codex can do the file-level audit. No code changes this session.
|
||||
|
||||
- **2026-04-22 Claude (late eve)** After the rejection, read the four core V1 architecture docs end-to-end (`engineering-ontology-v1.md`, `engineering-query-catalog.md`, `memory-vs-entities.md`, `engineering-v1-acceptance.md`) plus the four supporting docs (`promotion-rules.md`, `conflict-model.md`, `human-mirror-rules.md`, `tool-handoff-boundaries.md`). Cross-referenced against current code in `src/atocore/engineering/`. **Key finding:** V1 is already 50–70% built — entity types (16, superset of V1's 12), all 18 V1 relationship types, 4-state lifecycle, CRUD + supersede + invalidate + PATCH, queries module with most killer-correctness queries (orphan_requirements, risky_decisions, unsupported_claims, impact_analysis, evidence_chain), conflicts module scaffolded, mirror scaffolded, graduation endpoint scaffolded. Recent commits e147ab2/b94f9df/081c058/069d155/b1a3dd0 are all V1 entity-layer work. Drafted `docs/plans/engineering-v1-completion-plan.md` reframing the work as **V1 completion, not V1 start**. Six sequential phases V1-A through V1-F, estimated 11–14 days, ~50 new tests (533 → ~580). Phases run in parallel with the Now list (pipeline soak + density + multi-model triage + p04-constraints) because surfaces are disjoint. Plan explicitly defers the minions/queue mechanic per acceptance-doc negative list. Pending Codex audit of the plan itself — especially the F-2 query gap list (Claude didn't read each query function end-to-end), F-5 conflicts schema divergence (per-type detectors vs spec's generic slot-keyed shape), and F-7 graduation depth. No code changes this session.
|
||||
|
||||
- **2026-04-22 Claude (eve)** gbrain review session. Antoine surfaced https://github.com/garrytan/gbrain for compare/contrast. Claude drafted a "Phase 8 Minions + typed edges" plan pairing a durable job queue with a 6-predicate edge upgrade over wikilinks. Codex reviewed and rejected as packaged: (1) sequencing leapfrogged the `master-plan-status.md` Now list (pipeline soak → 100+ memories → multi-model triage → p04-constraints fix); (2) 6 predicates vs V1's 17 across Structural/Intent/Validation/Provenance families — would have been schema debt on day one per `engineering-ontology-v1.md:112-137`; (3) "edges over wikilinks" bypassed the V1 canonical entity + promotion contract in `memory-vs-entities.md`. Claude verified each high finding against the cited files and concurred. The underlying mechanic (durable background jobs + typed relationship graph) is still a valid future direction, but its correct home is the Engineering V1 sprint under **Next** in `master-plan-status.md:179`, not a leapfrog phase. Decision record: `docs/decisions/2026-04-22-gbrain-plan-rejection.md`. No code changes this session. Next (pending Antoine ack): read the four V1 architecture docs end-to-end, then draft an Engineering V1 foundation plan that follows the existing contract, not a new external reference. Phase 8 (OpenClaw) name remains untouched — Claude's misuse of "Phase 8" in the rejected plan was a naming collision, not a renaming.
|
||||
|
||||
- **2026-04-22 Claude (pm)** Issue B (wiki redlinks) landed — last remaining P2 from Antoine's sprint plan. `_wikilink_transform(text, current_project)` in `src/atocore/engineering/wiki.py` replaces `[[Name]]` / `[[Name|Display]]` tokens (pre-markdown) with HTML anchors. Resolution order: same-project exact-name match → live `wikilink`; other-project match → live link with `(in project X)` scope indicator (`wikilink-cross`); no match → `redlink` pointing at `/wiki/new?name=<quoted>&project=<current>`. New route `GET /wiki/new` renders a pre-filled "create this entity" form that POSTs to `/v1/entities` via a minimal inline fetch() and redirects to the new entity's wiki page on success. Transform applied in `render_project` (over the mirror markdown) and `render_entity` (over the description body). CSS: dashed-underline accent for live wikilinks, red italic + dashed for redlinks. 12 new tests including the regression from the spec (entity A references `[[EntityB]]` → initial render has `class="redlink"`; after EntityB is created, re-render no longer has redlink and includes `/wiki/entities/{b.id}`). Tests 521 → 533. All 6 acceptance criteria from the sprint plan ("daily-usable") now green: retract/supersede, edit without cloning, cross-project has a home, visual evidence, wiki readable, AKC can capture reliably.
|
||||
|
||||
- **2026-04-22 Claude** PATCH `/entities/{id}` + Issue D (/v1/engineering/* aliases) landed. New `update_entity()` in `src/atocore/engineering/service.py` supports partial updates to description (replace), properties (shallow merge — `null` value deletes a key), confidence (0..1, 400 on bounds violation), source_refs (append + dedup). Writes an `updated` audit row with full before/after snapshots. Forbidden via this path: entity_type / project / name / status — those require supersede+create or the dedicated status endpoints, by design. New route `PATCH /entities/{id}` aliased under `/v1`. Issue D: all 10 `/engineering/*` query paths (decisions, systems, components/{id}/requirements, changes, gaps + sub-paths, impact, evidence) added to the `/v1` allowlist. 12 new PATCH tests (merge, null-delete, confidence bounds, source_refs dedup, 404, audit row, v1 alias). Tests 509 → 521. Next: commit + deploy, then Issue B (wiki redlinks) as the last remaining P2 per Antoine's sprint order.
|
||||
|
||||