44724c81ab docs(planning): V1 Completion Plan revised per Codex file-level audit
Three findings folded in, all with exact file:line refs from Codex:

- F-1 downgraded from done to partial. Entity dataclass at
  service.py:67 and entities table missing extractor_version and
  canonical_home fields per engineering-v1-acceptance.md:45. V1-0
  scope now adds both via additive migration + doc note that
  project is the project_id per "fields equivalent to" wording.

- F-2 replaced guesses with ground truth per-query status:
  9 of 20 v1-required queries done, 1 partial (Q-001 needs
  subsystem-scoped variant), 10 missing. V1-A scope shrank to
  Q-001 shape fix + Q-6 integration. V1-C closes the 8 net-new
  queries; Q-020 deferred to V1-D (mirror).

- F-5 reframed. Generic conflicts + conflict_members schema
  already present at database.py:190, no migration needed.
  Divergence is detector body (per-type dispatch needs
  generalization) + routes (/admin/conflicts/* needs
  /conflicts/* alias). V1-F scope is detector + routes only.

Totals revised: 16.5-17.5 days, ~60 tests.

Three of Codex's eight open questions now resolved. Remaining:
F-7 graduation depth, mirror determinism, project naming,
velocity calibration, minions-as-V2 naming.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-22 14:09:50 -04:00
ce3a87857e docs(planning): V1 Completion Plan + gbrain-plan rejection record
- docs/decisions/2026-04-22-gbrain-plan-rejection.md: record of
  gbrain-inspired "Phase 8 Minions + typed edges" plan rejection.
  Three high findings from Codex verified against cited architecture
  docs (ontology V1 predicate set, canonical entity contract,
  master-plan-status Now list sequencing).

- docs/plans/engineering-v1-completion-plan.md: seven-phase plan
  for finishing Engineering V1 against engineering-v1-acceptance.md.
  V1-0 (write-time invariants: F-8 provenance + F-5 hooks + F-1
  audit) as hard prerequisite per Codex first-round review. Per-
  criterion gap audit against each F/Q/O/D acceptance item with
  code:line references. Explicit collision points with the Now
  list; schedule shifted ~4 weeks to avoid pipeline-soak window.
  Awaiting Codex file-level audit.

- DEV-LEDGER.md: Recent Decisions + Session Log entries covering
  both the rejection and the revised plan.

No code changes. Docs + ledger only.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-22 13:58:10 -04:00