- current-state.md: header bumped to 2026-04-22, live_sha 2712c5d,
547 tests. New "V1-0 landed" section covers what merged, what the
prod backfill did, and where the next phase stands.
- master-plan-status.md: new "Active - Engineering V1 Completion
Track (started 2026-04-22)" section between Now and Next.
Contains the 7-phase table with V1-0 marked done, V1-A gated,
V1-B..V1-F pending. V1 removed from the "Next" section since it
is now Active.
- DEV-LEDGER.md Orientation: two new pointers — active_track points
to the completion plan + resume map; open_branches points to the
R14 branch still awaiting Codex review.
- docs/plans/v1-resume-state.md (new): single-page "you are here"
for any future session. Covers state of play, start-gates for
V1-A, pre-flight checklist, phase map, parallel-safe work, do-nots,
open findings, agreement protocol history, reference index.
Designed to be cold-readable — no prior session context required.
No code changes.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>