Author SHA1 Message Date
ce3a87857e docs(planning): V1 Completion Plan + gbrain-plan rejection record
- docs/decisions/2026-04-22-gbrain-plan-rejection.md: record of
  gbrain-inspired "Phase 8 Minions + typed edges" plan rejection.
  Three high findings from Codex verified against cited architecture
  docs (ontology V1 predicate set, canonical entity contract,
  master-plan-status Now list sequencing).

- docs/plans/engineering-v1-completion-plan.md: seven-phase plan
  for finishing Engineering V1 against engineering-v1-acceptance.md.
  V1-0 (write-time invariants: F-8 provenance + F-5 hooks + F-1
  audit) as hard prerequisite per Codex first-round review. Per-
  criterion gap audit against each F/Q/O/D acceptance item with
  code:line references. Explicit collision points with the Now
  list; schedule shifted ~4 weeks to avoid pipeline-soak window.
  Awaiting Codex file-level audit.

- DEV-LEDGER.md: Recent Decisions + Session Log entries covering
  both the rejection and the revised plan.

No code changes. Docs + ledger only.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-22 13:58:10 -04:00