62 lines
3.1 KiB
Markdown
62 lines
3.1 KiB
Markdown
|
|
# 2026-02-09
|
||
|
|
|
||
|
|
## Phase 1 Approved & Kicked Off
|
||
|
|
- Antoine asked if Phase 0 was complete enough to move forward
|
||
|
|
- Assessed Phase 0 at ~75% complete (structure proven, execution loop not yet tested)
|
||
|
|
- Recommended proceeding to Phase 1 with Hydrotech Beam as the validation project
|
||
|
|
- Antoine approved — Phase 1 is live
|
||
|
|
|
||
|
|
## Phase 1 Agents — Status
|
||
|
|
- Optimizer, Study Builder, Auditor are NOT yet configured as gateway agents
|
||
|
|
- Only Manager, Secretary, Technical Lead exist as real agents
|
||
|
|
- Using sessions_spawn sub-agents as a workaround for now
|
||
|
|
- Need Mario to set up the actual agent workspaces + gateway config for Phase 1 agents
|
||
|
|
|
||
|
|
## Hydrotech Beam — Resuming
|
||
|
|
- Posted project kickoff in #project-hydrotech-beam with full assignment roster
|
||
|
|
- Workflow: serial chain managed by me (per DEC-A003)
|
||
|
|
- Step 1: Optimizer designs strategy ← IN PROGRESS (spawned sub-agent)
|
||
|
|
- Step 2: Auditor reviews plan
|
||
|
|
- Step 3: Study Builder writes code
|
||
|
|
- Step 4: Auditor reviews code
|
||
|
|
- Step 5: CEO approves for execution
|
||
|
|
- Step 6: Run on Windows (manual)
|
||
|
|
- Step 7: Results analysis
|
||
|
|
- 9 technical gaps still open from Tech Lead's breakdown (G1-G9)
|
||
|
|
- Optimizer working from BREAKDOWN.md to produce OPTIMIZATION_STRATEGY.md
|
||
|
|
|
||
|
|
## Antoine Questions
|
||
|
|
- Asked about workflow management (serial vs parallel) — explained I manage the chain
|
||
|
|
- Asked about roll call location — posted project kickoff in #project-hydrotech-beam
|
||
|
|
- Asked "what's next? Where do I review?" — gave full status briefing in #all-atomizer-hq
|
||
|
|
- Pointed to Gitea as the browsable dashboard
|
||
|
|
- Recommended resolving 9 gaps as top priority
|
||
|
|
- Proposed: daily auto-status from Secretary, README as live dashboard
|
||
|
|
- Antoine wants proactive improvement — gave 6 prioritized recommendations
|
||
|
|
|
||
|
|
## File Access Gap Identified
|
||
|
|
- Atomizer repo NOT synced to Windows (dalidou) via Syncthing
|
||
|
|
- Only ATODrive, Atomaste, obsidian-vault, Sync are shared
|
||
|
|
- Model files (Beam.prt, etc.) never added to models/ — placeholder only
|
||
|
|
- Antoine can't browse KB or project docs from Windows
|
||
|
|
- **Resolution:** Antoine setting up Syncthing for `projects/hydrotech-beam/` specifically
|
||
|
|
- Server path: `/home/papa/repos/Atomizer/projects/hydrotech-beam/`
|
||
|
|
- Rest of repo stays git-only (he has Gitea web access from Windows)
|
||
|
|
- .gitignore allows .prt/.fem/.sim (only .bak excluded)
|
||
|
|
- Once sync is live, model files land in models/ and I commit to Gitea
|
||
|
|
- Antoine wants KBS session but needs model files accessible first
|
||
|
|
|
||
|
|
## Single Source of Truth — Consolidation Done
|
||
|
|
- **Canonical project path:** `/home/papa/repos/Atomizer/projects/hydrotech-beam/` (Gitea + Syncthing)
|
||
|
|
- Removed stale duplicate at `/home/papa/atomizer/projects/hydrotech-beam/`
|
||
|
|
- Created symlink so old references still resolve
|
||
|
|
- Cleaned up Syncthing conflict files
|
||
|
|
- All agents should reference `/repos/Atomizer/projects/` from now on
|
||
|
|
- Antoine dropping remaining model files via Syncthing from Windows
|
||
|
|
|
||
|
|
## Improvement Initiatives (Self-Directed)
|
||
|
|
- [ ] Set up Secretary daily status posts
|
||
|
|
- [ ] Update Hydrotech README to be a live status card
|
||
|
|
- [ ] Track gap resolution progress
|
||
|
|
- [x] Consolidate project folder to single source of truth (repo)
|