Files
Atomizer/hq/workspaces/shared/PROJECT_STATUS.md

55 lines
2.9 KiB
Markdown
Raw Normal View History

# Project Status Dashboard
2026-02-23 10:00:17 +00:00
Updated: 2026-02-23 04:00 AM (Nightly Digestion OP_11)
2026-02-20 10:00:13 +00:00
## Active Projects
2026-02-23 10:00:17 +00:00
### 📦 AOM / V2 Migration (NEW — Feb 22)
- **Phase:** Documentation complete, migration plan reviewed
- **Status:** 🟡 AWAITING CEO DECISIONS (6 items)
- **What happened:** AOM completed (48 docs, ~8,830 lines, zero NX-only assumptions). Tool-agnostic architecture approved (DEC-030). V2 repo created at `192.168.86.50:3000/Antoine/Atomizer-V2` (DEC-032). Migration masterplan written + audited (11 findings addressed in V2 plan, 12-day timeline).
- **Deliverables ready:** AOM (Obsidian), V2 Migration Masterplan V2, Auditor audit, code review
- **Location:** Obsidian vault `P-Atomizer-Operating-Manual/`, `shared/reviews/`
- **Pending CEO decisions:** License type, GitHub name, Obsidian sync strategy, HQ separation, projects/ exclusion, repo visibility, timing to start
- **Owner:** Manager
2026-02-20 10:00:13 +00:00
### 🔩 Hydrotech Beam — Optimization
- **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE)
- **Status:** ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
- **Key numbers:** 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
- **Next:** Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
- **Owner:** Tech Lead + Study Builder
### 📐 Atomizer Project Standard
- **Phase:** Review complete, awaiting CEO decision
- **Status:** 🟡 AWAITING APPROVAL
- **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis
- **Location:** `shared/standardization/`
- **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
- **Owner:** Manager
### 🔺 Adaptive Isogrid Plate Lightweighting
- **Phase:** Technical spec locked, reviews complete
- **Status:** 🟡 AWAITING CEO REVIEW
- **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review
- **Location:** `shared/war-room-isogrid/`
- **Architecture:** Python Brain + NX Hands + Atomizer Manager (semi-automated isogrid optimization)
- **Next:** CEO review → implementation planning
- **Owner:** Manager / Tech Lead
### 🔬 Material Research (M2 Mirror Trade Study)
- **Phase:** Research complete
- **Status:** ✅ Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC)
- **Next:** Awaiting project context to produce recommendation
- **Owner:** Webster
2026-02-23 10:00:17 +00:00
## Outstanding Blockers
- **Auditor** blocked on P-Adaptive-Isogrid review since Feb 16 (needs Tech Lead response)
- **Webster** web_search API key missing (needs Mario, since Feb 19)
- **Sub-agent spawning** intermittently broken ("pairing required" error, Feb 22)
- **4 projects** simultaneously awaiting CEO input — triage needed
2026-02-20 10:00:13 +00:00
2026-02-23 10:00:17 +00:00
## Recent Completions
- 2026-02-22: AOM 100% complete (48 docs), tool-agnostic architecture, V2 migration plan + audit
2026-02-20 10:00:13 +00:00
- 2026-02-18: Project standardization package assembled and reviewed
2026-02-23 10:00:17 +00:00
- 2026-02-17: System test orchestration validated