Files
Atomizer/projects/hydrotech-beam/dashboard/EXECUTIVE_DASHBOARD.md

34 lines
1.3 KiB
Markdown
Raw Normal View History

2026-02-15 08:00:21 +00:00
# Hydrotech Beam — Executive Dashboard
Last updated (UTC): 2026-02-14T22:24:29
Source: `studies/01_doe_landscape/results/doe_summary.json` + `doe_results.csv`
## CEO 60-second view
- **Phase:** DOE Phase 1 (LHS)
- **Gate status:** ❌ **BLOCKED** (Phase 1 → Phase 2)
- **Total trials:** 51
- **Solved:** 39 (**76.5%**, below 80% gate)
- **Geo-infeasible:** 12
- **Fully feasible designs:** 0 (gate requires ≥5)
## Top signals
- ✅ Mass extraction now looks real (no NaN in solved rows)
- ✅ Syncthing cleanup completed (active conflict files archived)
- ⚠️ Displacement constraint is the blocker (0/39 displacement-feasible at 10 mm)
- ⚠️ DOE→TPE gate cannot pass with current limits/bounds
## Decision hotlist (CEO)
1. **Approve next constraint strategy**:
- Option A (recommended): exploratory rerun at **20 mm** displacement
- Option B: keep 10 mm and tighten design bounds for stiffness
2. **Approve TPE entry rule** (with strict gate or conditional gate)
## Recommendation (current)
Proceed with **Option A** for exploration (20 mm), then tighten toward 10 mm in staged optimization.
## KPI snapshot
- Solve success rate: **76.5%**
- Feasibility rate (full): **0.0%**
- Best solved mass: **686.289 kg** (not fully feasible)
- Best trial ID by mass: **26**