# Optimization Strategy — Hydrotech Beam DoE & Landscape Mapping
**Study:** `01_doe_landscape`
**Project:** Hydrotech Beam Structural Optimization
**Author:** ⚡ Optimizer Agent
**Date:** 2025-02-09 (updated 2026-02-10 — introspection corrections)
**Status:** APPROVED WITH CONDITIONS — Auditor review 2026-02-10, blockers resolved inline
**References:** [BREAKDOWN.md](../../BREAKDOWN.md), [DECISIONS.md](../../DECISIONS.md), [CONTEXT.md](../../CONTEXT.md)
---
## 1. Problem Formulation
### 1.1 Objective
$$\min_{x} \quad f(x) = \text{mass}(x) \quad [\text{kg}]$$
Single-objective minimization of total beam mass. This aligns with DEC-HB-001 (approved by Tech Lead, pending CEO confirmation).
### 1.2 Constraints
| ID | Constraint | Operator | Limit | Units | Source |
|----|-----------|----------|-------|-------|--------|
| g₁ | Tip displacement | ≤ | 10.0 | mm | NX Nastran SOL 101 — displacement sensor at beam tip |
| g₂ | Max von Mises stress | ≤ | 130.0 | MPa | NX Nastran SOL 101 — max elemental nodal VM stress |
Both are **hard constraints** — no trade-off or relaxation without CEO approval.
### 1.3 Design Variables
| ID | NX Expression | Type | Lower | Upper | Baseline | Units | Notes |
|----|---------------|------|-------|-------|----------|-------|-------|
| DV1 | `beam_half_core_thickness` | Continuous | 10 | 40 | **25.162** | mm | Core half-thickness; stiffness scales ~quadratically via sandwich effect |
| DV2 | `beam_face_thickness` | Continuous | 10 | 40 | **21.504** | mm | Face sheet thickness; primary bending stiffness contributor |
| DV3 | `holes_diameter` | Continuous | 150 | 450 | 300 | mm | Lightening hole diameter; mass ∝ d² reduction |
| DV4 | `hole_count` (→ `Pattern_p7`) | **Integer** | 5 | 15 | 10 | — | Number of lightening holes; 11 discrete levels |
**Total design space:** 3 continuous × 1 integer (11 levels) = effectively 3D continuous × 11 slices.
### 1.4 Integer Handling
Per DEC-HB-003, `hole_count` is treated as a **true integer** throughout:
- **Phase 1 (LHS):** Generate continuous LHS, round DV4 to nearest integer. Use stratified integer sampling to ensure coverage across all 11 levels.
- **Phase 2 (TPE):** Optuna `IntDistribution(5, 15)` — native integer support, no rounding hacks.
- **NX rebuild:** The model requires integer hole count. Non-integer values will cause geometry failures.
### 1.5 Baseline Assessment
| Metric | Baseline Value | Constraint | Status |
|--------|---------------|------------|--------|
| Mass | **1,133.01 kg** | (minimize) | Overbuilt — room to reduce |
| Tip displacement | ~22 mm (unverified — awaiting baseline re-run) | ≤ 10 mm | ❌ **Likely FAILS** |
| VM stress | (unknown — awaiting baseline re-run) | ≤ 130 MPa | ⚠️ Unconfirmed |
> ⚠️ **Critical:** The baseline design likely **violates** the displacement constraint (~22 mm vs 10 mm limit). Baseline re-run pending — CEO running SOL 101 in parallel. The optimizer must first find the feasible region before it can meaningfully minimize mass. This shapes the entire strategy.
>
> **Introspection note (2026-02-10):** Mass expression is `p173` (body_property147.mass, kg). DV baselines are NOT round numbers (face=21.504mm, core=25.162mm). NX expression `beam_lenght` has a typo (no 'h'). `hole_count` links to `Pattern_p7` in the NX pattern feature.
---
## 2. Algorithm Selection
### 2.1 Tech Lead's Recommendation
DEC-HB-002 proposes a two-phase strategy:
- **Phase 1:** Latin Hypercube Sampling (LHS) — 4050 trials
- **Phase 2:** TPE via Optuna — 60100 trials
### 2.2 My Assessment: **CONFIRMED with refinements**
The two-phase approach is the right call. Here's why, and what I'd adjust:
#### Why LHS → TPE is correct for this problem
| Factor | Implication | Algorithm Fit |
|--------|------------|---------------|
| 4 design variables (low-dim) | All methods work; sample efficiency less critical | Any |
| 1 integer variable | Need native mixed-type support | TPE ✓, CMA-ES ≈ (rounding) |
| Infeasible baseline | Must map feasibility BEFORE optimizing | LHS first ✓ |
| Expected significant interactions (DV1×DV2, DV3×DV4) | Need space-filling to detect interactions | LHS ✓ |
| Potentially narrow feasible region | Risk of missing it with random search | LHS gives systematic coverage ✓ |
| NX-in-the-loop (medium cost) | ~100-200 trials is budget-appropriate | TPE efficient enough ✓ |
#### What I'd modify
1. **Phase 1 budget: 50 trials (not 40).** With 4 variables, we want at least 10× the dimensionality for a reliable DoE. 50 trials also divides cleanly for stratified integer sampling (≈4-5 trials per hole_count level).
2. **Enqueue baseline as Trial 0.** LAC critical lesson: CMA-ES doesn't evaluate x0 first. While we're using LHS (not CMA-ES), the same principle applies — **always evaluate the baseline explicitly** so we have a verified anchor point. This also validates the extractor pipeline before burning 50 trials.
3. **Phase 2 budget: 80 trials (flexible 60-100).** Start with 60, apply convergence criteria (Section 6), extend to 100 if still improving.
4. **Seed Phase 2 from Phase 1 data.** Use Optuna's `enqueue_trial()` to warm-start TPE with the best feasible point(s) from the DoE. This avoids the TPE startup penalty (first `n_startup_trials` are random).
#### Algorithms NOT selected (and why)
| Algorithm | Why Not |
|-----------|---------|
| **CMA-ES** | Good option, but integer rounding is a hack; doesn't evaluate x0 first (LAC lesson); TPE is equally good at 4D |
| **NSGA-II** | Overkill for single-objective; population size wastes budget |
| **Surrogate + L-BFGS** | **LAC CRITICAL: Gradient descent on surrogates finds fake optima.** V5 mirror study: L-BFGS was 22% WORSE than pure TPE (WS=325 vs WS=290). V6 confirmed simple TPE beats complex surrogate methods. Do not use. |
| **SOL 200 (Nastran native)** | No integer support for hole_count; gradient-based so may miss global optimum; more NX setup effort. Keep as backup (Tech Lead's suggestion). |
| **Nelder-Mead** | No integer support; poor exploration; would miss the feasible region |
### 2.3 Final Algorithm Configuration
```
Phase 1: LHS DoE
- Trials: 50 (+ 1 baseline = 51 total)
- Sampling: Maximin LHS, DV4 rounded to nearest integer
- Purpose: Landscape mapping, feasibility identification, sensitivity analysis
Phase 2: TPE Optimization
- Trials: 60-100 (adaptive, see convergence criteria)
- Sampler: Optuna TPEsampler
- n_startup_trials: 0 (warm-started from Phase 1 best)
- Constraint handling: Optuna constraint interface with Deb's rules
- Purpose: Converge to minimum-mass feasible design
Total budget: 111-151 evaluations
```
---
## 3. Constraint Handling
### 3.1 The Challenge
The baseline FAILS the displacement constraint by 120% (22 mm vs 10 mm). This means:
- A significant portion of the design space may be infeasible
- Random sampling may return few or zero feasible points
- The optimizer must navigate toward feasibility AND optimality simultaneously
### 3.2 Approach: Deb's Feasibility Rules (Constraint Domination)
For ranking solutions during optimization, use **Deb's feasibility rules** (Deb 2000):
1. **Feasible vs feasible** → compare by objective (lower mass wins)
2. **Feasible vs infeasible** → feasible always wins
3. **Infeasible vs infeasible** → lower total constraint violation wins
This is implemented via Optuna's constraint interface:
```python
def constraints(trial):
"""Return constraint violations (negative = feasible, positive = infeasible)."""
disp = trial.user_attrs["tip_displacement"]
stress = trial.user_attrs["max_von_mises"]
return [
disp - 10.0, # ≤ 0 means displacement ≤ 10 mm
stress - 130.0, # ≤ 0 means stress ≤ 130 MPa
]
```
### 3.3 Why NOT Penalty Functions
| Method | Pros | Cons | Verdict |
|--------|------|------|---------|
| **Deb's rules** (selected) | No tuning params; feasible always beats infeasible; explores infeasible region for learning | Requires custom Optuna integration | ✅ Best for this case |
| **Quadratic penalty** | Simple to implement | Penalty weight requires tuning; wrong weight → optimizer ignores constraint OR over-penalizes | ❌ Fragile |
| **Adaptive penalty** | Self-tuning | Complex implementation; may oscillate | ❌ Over-engineered for 4 DVs |
| **Death penalty** (reject infeasible) | Simplest | With infeasible baseline, may reject 80%+ of trials → wasted budget | ❌ Dangerous |
### 3.4 Phase 1 (DoE) Constraint Handling
During the DoE phase, **record all results without filtering.** Every trial runs, every result is stored. Infeasible points are valuable for:
- Mapping the feasibility boundary
- Training the TPE model in Phase 2
- Understanding which variables drive constraint violation
### 3.5 Constraint Margin Buffer
Consider a 5% inner margin during optimization to account for numerical noise:
- Displacement target for optimizer: ≤ 9.5 mm (vs hard limit 10.0 mm)
- Stress target for optimizer: ≤ 123.5 MPa (vs hard limit 130.0 MPa)
The hard limits remain 10 mm / 130 MPa for final validation. The buffer prevents the optimizer from converging to designs that are right on the boundary and may flip infeasible under mesh variation.
---
## 4. Search Space Analysis
### 4.1 Bound Reasonableness
| Variable | Range | Span | Concern |
|----------|-------|------|---------|
| DV1: half_core_thickness | 1040 mm | 4× range | Reasonable. Lower bound = thin core, upper = thick. Stiffness-mass trade-off |
| DV2: face_thickness | 1040 mm | 4× range | Reasonable. 10 mm face is already substantial for steel |
| DV3: holes_diameter | 150450 mm | 3× range | ⚠️ **Needs geometric check** — see §4.2 |
| DV4: hole_count | 515 | 3× range | ⚠️ **Needs geometric check** — see §4.2 |
### 4.2 Geometric Feasibility: Hole Overlap Analysis
**Critical concern:** At extreme DV3 × DV4 combinations, holes may overlap or leave insufficient ligament (material between holes).
#### Overlap condition (CORRECTED — Auditor review 2026-02-10)
The NX pattern places `n` holes across a span of `p6` mm using `n-1` intervals (holes at both endpoints of the span). Confirmed by introspection: `Pattern_p8 = 4000/9 = 444.44 mm`.
```
Spacing between hole centers = hole_span / (hole_count - 1)
Ligament between holes = spacing - d = hole_span/(hole_count - 1) - d
```
For **no overlap**, we need: `hole_span/(n-1) - d > 0`, i.e., `d < hole_span/(n-1)`
With `hole_span = 4,000 mm` (fixed, `p6`):
#### Worst case: n=15 holes, d=450 mm
```
Spacing = 4000 / (15-1) = 285.7 mm
Ligament = 285.7 - 450 = -164.3 mm → INFEASIBLE (overlap)
```
#### Minimum ligament width
For structural integrity and mesh quality, a minimum ligament of ~30 mm is advisable:
```
Minimum ligament constraint: hole_span / (hole_count - 1) - holes_diameter ≥ 30 mm
```
#### Pre-flight geometric filter
Before sending any trial to NX, compute:
1. `ligament = 4000 / (hole_count - 1) - holes_diameter` → must be ≥ 30 mm
2. `web_clear = 2 × beam_half_height - 2 × beam_face_thickness - holes_diameter` → must be > 0
If either fails, skip NX evaluation and record as infeasible with max constraint violation. This saves compute and avoids NX geometry crashes.
### 4.3 Hole-to-Web-Height Ratio (CORRECTED — Auditor review 2026-02-10)
The hole diameter must fit within the web clear height. From introspection:
- Total beam height = `2 × beam_half_height = 2 × 250 = 500 mm` (fixed)
- Web clear height = `total_height - 2 × face_thickness = 500 - 2 × beam_face_thickness`
```
At baseline (face=21.504mm): web_clear = 500 - 2×21.504 = 456.99 mm → holes of 450mm barely fit (7mm clearance)
At face=40mm: web_clear = 500 - 2×40 = 420 mm → holes of 450mm DO NOT FIT
At face=10mm: web_clear = 500 - 2×10 = 480 mm → holes of 450mm fit (30mm clearance)
```
This means `beam_face_thickness` and `holes_diameter` interact geometrically — thicker faces reduce the web clear height available for holes. This constraint is captured in the pre-flight filter (§4.2):
```
web_clear = 500 - 2 × beam_face_thickness - holes_diameter > 0
```
### 4.4 Expected Feasible Region
Based on the physics (Tech Lead's analysis §1.2 and §1.3):
| To reduce displacement (currently 22→10 mm) | Effect on mass |
|----------------------------------------------|---------------|
| ↑ DV1 (thicker core) | ↑ mass (but stiffness scales ~d², mass scales ~d) → **efficient** |
| ↑ DV2 (thicker face) | ↑ mass (direct) |
| ↓ DV3 (smaller holes) | ↑ mass (more web material) |
| ↓ DV4 (fewer holes) | ↑ mass (more web material) |
**Prediction:** The feasible region (displacement ≤ 10 mm) likely requires:
- DV1 in upper range (25-40 mm) — the sandwich effect is the most mass-efficient stiffness lever
- DV2 moderate (15-30 mm) — thicker faces help stiffness but cost mass directly
- DV3 and DV4 constrained by stress — large/many holes save mass but increase stress
The optimizer should find a "sweet spot" where core thickness provides stiffness, and holes are sized to save mass without violating stress limits.
### 4.5 Estimated Design Space Volume
- DV1: 30 mm span (continuous)
- DV2: 30 mm span (continuous)
- DV3: 300 mm span (continuous)
- DV4: 11 integer levels
Total configurations: effectively infinite (3 continuous), but the integer dimension creates 11 "slices" of the space. With 50 DoE trials, we get ~4-5 trials per slice — sufficient for trend identification.
---
## 5. Trial Budget & Compute Estimate
### 5.1 Budget Breakdown
| Phase | Trials | Purpose |
|-------|--------|---------|
| **Trial 0** | 1 | Baseline validation (enqueued) |
| **Phase 1: LHS DoE** | 50 | Landscape mapping, feasibility, sensitivity |
| **Phase 2: TPE** | 60100 | Directed optimization |
| **Validation** | 35 | Confirm optimum, check mesh sensitivity |
| **Total** | **114156** | |
### 5.2 Compute Time Estimate
| Parameter | Estimate | Notes |
|-----------|----------|-------|
| DOF count | 10K100K | Steel beam, SOL 101 |
| Single solve time | 30s3min | Depends on mesh density |
| Model rebuild time | 1030s | NX parametric update + remesh |
| Total per trial | 14 min | Rebuild + solve + extraction |
| Phase 1 (51 trials) | 13.5 hrs | |
| Phase 2 (60100 trials) | 17 hrs | |
| **Total compute** | **210 hrs** | Likely ~45 hrs |
### 5.3 Budget Justification
For 4 design variables, rule-of-thumb budgets:
- **Minimum viable:** 10 × n_vars = 40 trials (DoE only)
- **Standard:** 25 × n_vars = 100 trials (DoE + optimization)
- **Thorough:** 50 × n_vars = 200 trials (with validation)
Our budget of 114156 falls in the **standard-to-thorough** range. Appropriate for a first study where we're mapping an unknown landscape with an infeasible baseline.
---
## 6. Convergence Criteria
### 6.1 Phase 1 (DoE) — No Convergence Criteria
The DoE runs all 50 planned trials. It's not iterative — it's a one-shot space-filling design. Stop conditions:
- All 50 trials complete (or fail with documented errors)
- **Early abort:** If >80% of trials fail to solve (NX crashes), stop and investigate
### 6.2 Phase 2 (TPE) — Convergence Criteria
| Criterion | Threshold | Action |
|-----------|-----------|--------|
| **Improvement stall** | Best feasible objective unchanged for 20 consecutive trials | Consider stopping |
| **Relative improvement** | < 1% improvement over last 20 trials | Consider stopping |
| **Budget exhausted** | 100 trials completed in Phase 2 | Hard stop |
| **Perfect convergence** | Multiple trials within 0.5% of each other from different regions | Confident optimum found |
| **Minimum budget** | Always run at least 60 trials in Phase 2 | Ensures adequate exploration |
### 6.3 Decision Logic
```
After 60 Phase 2 trials:
IF best_feasible improved by >2% in last 20 trials → continue to 80
IF no feasible solution found → STOP, escalate (see §7.1)
ELSE → assess convergence, decide 80 or 100
After 80 Phase 2 trials:
IF still improving >1% per 20 trials → continue to 100
ELSE → STOP, declare converged
After 100 Phase 2 trials:
HARD STOP regardless
```
### 6.4 Phase 1 → Phase 2 Gate
Before starting Phase 2, review DoE results:
| Check | Action if FAIL |
|-------|---------------|
| At least 5 feasible points found | If 0 feasible: expand bounds or relax constraints (escalate to CEO) |
| NX solve success rate > 80% | If <80%: investigate failures, fix model, re-run failed trials |
| No systematic NX crashes at bounds | If crashes: tighten bounds away from failure region |
| Sensitivity trends visible | If flat: check extractors, may be reading wrong output |
---
## 7. Risk Mitigation
### 7.1 Risk: Feasible Region is Empty
**Likelihood: Medium** (baseline fails displacement by 120%)
**Detection:** After Phase 1, zero feasible points found.
**Mitigation ladder:**
1. **Check the data** — Are extractors reading correctly? Validate against manual NX check.
2. **Examine near-feasible** — Find the trial closest to feasibility. How far off? If displacement = 10.5 mm, we're close. If displacement = 18 mm, we have a problem.
3. **Targeted exploration** — Run additional trials at extreme stiffness (max DV1, max DV2, min DV3, min DV4). If even the stiffest/heaviest design fails, the constraint is physically impossible with this geometry.
4. **Constraint relaxation** — Propose to CEO: relax displacement to 12 or 15 mm. Document the mass-displacement Pareto front from DoE data to support the discussion.
5. **Geometric redesign** — If the problem is fundamentally infeasible, the beam geometry needs redesign (out of optimization scope).
### 7.2 Risk: NX Crashes at Parameter Extremes
**Likelihood: Medium** (LAC: rib_thickness had undocumented CAD constraint at 9mm, causing 34% failure rate in V13)
**Detection:** Solver returns no results for certain parameter combinations.
**Mitigation:**
1. **Pre-flight corner tests** — Before Phase 1, manually test the 16 corners of the design space (2⁴ combinations of min/max for each variable). This catches geometric rebuild failures early.
2. **Error-handling in run script** — Every trial must catch exceptions and log:
- NX rebuild failure (geometry Boolean crash)
- Meshing failure (degenerate elements)
- Solver failure (singularity, divergence)
- Extraction failure (missing result)
3. **Infeasible-by-default** — If a trial fails for any reason, record it as infeasible with maximum constraint violation (displacement=9999, stress=9999). This lets Deb's rules naturally steer away from crashing regions.
4. **NEVER kill NX processes directly** — LAC CRITICAL RULE. Use NXSessionManager.close_nx_if_allowed() only. If NX hangs, implement a timeout (e.g., 10 min per trial) and let NX time out gracefully.
### 7.3 Risk: Mesh-Dependent Stress Results
**Likelihood: Medium** (stress at hole edges is mesh-sensitive)
**Mitigation:**
1. **Mesh convergence pre-study** — Run baseline at 3 mesh densities. If stress varies >10%, refine mesh or use stress averaging region.
2. **Consistent mesh controls** — Ensure NX applies the same mesh size/refinement strategy regardless of parameter values. The parametric model should have mesh controls tied to hole geometry.
3. **Stress extraction method** — Use elemental nodal stress (conservative) per LAC success pattern. Note: pyNastran returns stress in kPa for NX kg-mm-s unit system — **divide by 1000 for MPa**.
### 7.4 Risk: Surrogate Temptation
**Mitigation: DON'T DO IT (yet).**
LAC lessons from the M1 Mirror project are unequivocal:
- V5 surrogate + L-BFGS was 22% **worse** than V6 pure TPE
- MLP surrogates have smooth gradients everywhere → L-BFGS descends to fake optima outside training distribution
- No uncertainty quantification = no way to detect out-of-distribution predictions
With only 4 variables and affordable FEA (~2 min/trial), direct FEA evaluation via TPE is both simpler and more reliable. Surrogate methods should only be considered if:
- FEA solve time exceeds 30 minutes per trial, AND
- We have 100+ validated training points, AND
- We use ensemble surrogates with uncertainty quantification (SYS_16 protocol)
### 7.5 Risk: Study Corruption
**Mitigation:** LAC CRITICAL — **Always copy working studies, never rewrite from scratch.**
- Phase 2 study will be created by **copying** the Phase 1 study directory and adding optimization logic
- Never modify `run_optimization.py` in-place for a new phase — copy to a new version
- Git-commit the study directory after each phase completion
---
## 8. AtomizerSpec Draft
See [`atomizer_spec_draft.json`](./atomizer_spec_draft.json) for the full JSON config.
### 8.1 Key Configuration Decisions
| Setting | Value | Rationale |
|---------|-------|-----------|
| `algorithm.phase1.type` | `LHS` | Space-filling DoE for landscape mapping |
| `algorithm.phase2.type` | `TPE` | Native mixed-integer, sample-efficient, LAC-proven |
| `hole_count.type` | `integer` | DEC-HB-003: true integer, no rounding |
| `constraint_handling` | `deb_feasibility_rules` | Best for infeasible baseline |
| `baseline_trial` | `enqueued` | LAC lesson: always validate baseline first |
| `penalty_config.method` | `deb_rules` | No penalty weight tuning needed |
### 8.2 Extractor Requirements
| ID | Type | Output | Source | Notes |
|----|------|--------|--------|-------|
| `ext_001` | `expression` | `mass` | NX expression `p173` | Direct read from NX |
| `ext_002` | `displacement` | `tip_displacement` | SOL 101 result sensor or .op2 parse | ⚠️ Need sensor setup or node ID |
| `ext_003` | `stress` | `max_von_mises` | SOL 101 elemental nodal | kPa → MPa conversion needed |
### 8.3 Open Items for Spec Finalization
Before this spec can be promoted from `_draft` to production:
1. **Beam web length** — Required to validate DV3 × DV4 geometric feasibility
2. **Displacement extraction method** — Sensor in .sim, or node ID for .op2 parsing?
3. **Stress extraction scope** — Whole model max, or specific element group?
4. **NX expression names confirmed** — Verify `p173` is mass, confirm displacement/stress expression names
5. **Solver runtime benchmark** — Time one SOL 101 run to refine compute estimates
6. **Corner test results** — Validate model rebuilds at all 16 bound corners
---
## 9. Execution Plan Summary
```
┌─────────────────────────────────────────────────────────────────┐
│ HYDROTECH BEAM OPTIMIZATION │
│ Study: 01_doe_landscape │
├─────────────────────────────────────────────────────────────────┤
│ │
│ PRE-FLIGHT (before any trials) │
│ ├── Validate baseline: run Trial 0, verify mass/disp/stress │
│ ├── Corner tests: 16 extreme combinations, check NX rebuilds │
│ ├── Mesh convergence: 3 density levels at baseline │
│ └── Confirm extractors: mass, displacement, stress pipelines │
│ │
│ PHASE 1: DoE LANDSCAPE (51 trials) │
│ ├── Trial 0: Baseline (enqueued) │
│ ├── Trials 1-50: LHS with integer rounding for hole_count │
│ ├── Analysis: sensitivity, interaction, feasibility mapping │
│ └── GATE: ≥5 feasible? NX success >80%? Proceed/escalate │
│ │
│ PHASE 2: TPE OPTIMIZATION (60-100 trials) │
│ ├── Warm-start from best Phase 1 feasible point(s) │
│ ├── Deb's feasibility rules for constraint handling │
│ ├── Convergence check every 20 trials │
│ └── Hard stop at 100 trials │
│ │
│ VALIDATION (3-5 trials) │
│ ├── Re-run best design to confirm repeatability │
│ ├── Perturb ±5% on each variable to check sensitivity │
│ └── Document final design with full NX results │
│ │
│ TOTAL: 114-156 NX evaluations | ~4-5 hours compute │
│ │
└─────────────────────────────────────────────────────────────────┘
```
---
## 10. LAC Lessons Incorporated
| LAC Lesson | Source | How Applied |
|------------|--------|-------------|
| CMA-ES doesn't evaluate x0 first | Mirror V7 failure | Baseline enqueued as Trial 0 for both phases |
| Surrogate + L-BFGS = fake optima | Mirror V5 failure | No surrogates in this study; direct FEA only |
| Never kill NX processes directly | Dec 2025 incident | Timeout-based error handling; NXSessionManager only |
| Copy working studies, never rewrite | Mirror V5 failure | Phase 2 created by copying Phase 1 |
| pyNastran stress in kPa | Support arm success | Extractor divides by 1000 for MPa |
| CAD constraints can limit bounds | Mirror V13 (rib_thickness) | Pre-flight corner tests before DoE |
| Always include README.md | Repeated failures (Dec 2025, Jan 2026) | README.md created with study |
| Simple beats complex (TPE > surrogate) | Mirror V6 vs V5 | TPE selected over surrogate-based methods |
---
*⚡ Optimizer — The algorithm is the strategy.*