34 lines
1.3 KiB
Markdown
34 lines
1.3 KiB
Markdown
|
|
# Daily Log — 2026-02-08
|
||
|
|
|
||
|
|
## Projects Active
|
||
|
|
|
||
|
|
### **Hydrotech Beam Structural Optimization**
|
||
|
|
- **Channel:** #project-hydrotech-beam
|
||
|
|
- **Status:** Intake complete, technical breakdown done by Tech Lead
|
||
|
|
- **Objective:**
|
||
|
|
- Reduce mass (~974 kg baseline)
|
||
|
|
- Reduce tip displacement (~22mm → target <10mm)
|
||
|
|
- Keep stress <130 MPa
|
||
|
|
- **Design variables (4):** core thickness, face thickness, hole diameter, hole count
|
||
|
|
- **Solver:** NX Nastran (static structural)
|
||
|
|
- **Project folder:** `/home/papa/atomizer/projects/hydrotech-beam/`
|
||
|
|
|
||
|
|
### Key Technical Finding
|
||
|
|
- **⚠️ Critical issue:** Baseline already violates displacement constraint (22mm > 10mm target)
|
||
|
|
- **Risk:** Feasible region may be tight
|
||
|
|
- **Blocker:** 9 gaps identified by Tech Lead that need Antoine's input before optimization can proceed
|
||
|
|
|
||
|
|
### Next Steps
|
||
|
|
1. **🔴 URGENT:** Gap resolution session with Antoine
|
||
|
|
2. Model validation
|
||
|
|
3. DoE (Design of Experiments)
|
||
|
|
|
||
|
|
## Communication
|
||
|
|
- Antoine asked for updates on Hydrotech project (21:41 UTC)
|
||
|
|
- Manager provided full briefing (21:43+ UTC)
|
||
|
|
- Antoine mentioned posting details in #project-hydrotech-beam channel
|
||
|
|
|
||
|
|
## Notes
|
||
|
|
- Antoine initially seemed surprised I didn't see #project-hydrotech-beam content
|
||
|
|
- I don't have access to read that channel directly
|
||
|
|
- All project coordination happening through Manager per protocols
|