KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
# Knowledge Base — Hydrotech Beam
**Project:** Hydrotech Beam Structural Optimization
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
**Generation:** 003
**Last updated:** 2026-02-11
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
---
## Overview
2026-02-10 22:07:39 +00:00
I-beam optimization for a test fixture. Steel (AISI 1005) cantilever beam with lightening holes in the web. Goal: minimize mass from **1,133.01 kg ** baseline while meeting displacement (≤ 10 mm) and stress (≤ 130 MPa) constraints.
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
**Key confirmed parameters (Gen 003):**
2026-02-10 22:07:39 +00:00
- Beam length: 5,000 mm (`beam_lenght` ⚠️ typo in NX), cantilever — left fixed, right loaded
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
- Load: 10,000 kgf downward at free end
2026-02-10 22:07:39 +00:00
- Baseline mass: **1,133.01 kg ** (expression `p173: body_property147.mass` )
- DV baselines: face=21.504mm, core=25.162mm, holes_dia=300mm, hole_count=10
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
- Material: AISI Steel 1005 (density 7.3 g/cm³)
- Mesh: CQUAD4 thin shell, 33.7 mm element size
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
- **Solver:** DesigncenterNX 2512 (NX Nastran SOL 101)
- **First results (2026-02-11):** Displacement=17.93mm, Stress=111.9MPa, Solve time ~12s/trial
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
## Components
| Component | File | Status |
|-----------|------|--------|
| Sandwich Beam | [sandwich-beam.md ](components/sandwich-beam.md ) | ✅ Updated Gen 002 |
## Materials
| Material | File | Status |
|----------|------|--------|
| Steel AISI 1005 | [steel-aisi.md ](materials/steel-aisi.md ) | ✅ Updated Gen 002 |
## FEA
| Model | File | Status |
|-------|------|--------|
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
| Static Analysis (SOL 101) | [fea/models/sol101-static.md ](fea/models/sol101-static.md ) | ✅ Updated Gen 003 — Solver running, first results obtained |
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
## Generations
| Gen | Date | Summary |
|-----|------|---------|
| 001 | 2026-02-09 | Initial KB from intake + technical breakdown |
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
| 002 | 2026-02-10 | KBS session processing — confirmed geometry, BCs, mesh, material, mass correction |
| **003 ** | **2026-02-11 ** | **First real results! NX version fix (DesigncenterNX 2512), path resolution, backup/restore architecture, history DB, mass extraction via journal ** |
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
## Gap Tracker
### ✅ CLOSED
| # | Item | Resolution | Closed In |
|---|------|------------|-----------|
| G1 | Beam length and support conditions | 5,000 mm cantilever (left fixed, right free) | Gen 002 |
| G2 | Loading definition | 10,000 kgf point load, downward (− Y), at free end | Gen 002 |
| G8 | Mesh type and density | CQUAD4 thin shell, 33.7 mm element size (67.4/2) | Gen 002 |
### 🟡 PARTIALLY RESOLVED
| # | Item | Known | Remaining |
|---|------|-------|-----------|
| G5 | Hole geometric feasibility | Span = 4,000 mm, offsets = 500 mm fixed. Baseline: 10 holes × 300 mm → ~144 mm ligament (OK) | Need collision check at DV extremes. 15 × 450 mm WILL overlap. Need feasibility constraint. |
| G9 | Stress allowable basis | AISI 1005 yield ~285 MPa. 130 MPa → SF ≈ 2.2 | Need confirmation that 130 MPa limit still applies to updated model. |
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
### ❓ STILL OPEN
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
| # | Item | Why It Matters | Priority |
|---|------|---------------|----------|
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
| G7 | NX parametric rebuild reliability | Untested across full DV range — need corner-case testing | Medium |
| G15 | `p6` (hole_span) as potential DV | Antoine suggested it could be optimized. Decision needed. | Medium |
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
### ✅ CLOSED (Gen 003 — 2026-02-11)
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
| # | Item | Resolution | Closed In |
|---|------|------------|-----------|
| G3 | Displacement measurement location | Max Tz at free end, extracted via pyNastran OP2 | Gen 003 |
| G4 | Stress constraint scope | Whole model max von Mises (CQUAD4 shell) | Gen 003 |
| G6 | Result sensors in Beam_sim1.sim | Using pyNastran OP2 parsing, not NX sensors | Gen 003 |
| G10 | Baseline displacement | 17.93 mm at baseline-ish DVs | Gen 003 |
| G11 | Baseline stress | 111.9 MPa at baseline-ish DVs | Gen 003 |
| G12 | `beam_half_height` value | 250 mm — confirmed via binary introspection | Gen 002+ |
| G13 | `beam_half_width` value | 150 mm — confirmed via binary introspection | Gen 002+ |
| G14 | Hole diameter expression name | `holes_diameter` — confirmed via binary introspection | Gen 002+ |
KB Gen 002: Process KBS sessions, update model parameters
Sources: 3 KBS capture sessions (20260210-132817, 20260210-161401, 20260210-163801)
Key changes:
- Mass corrected: 974 kg (p173) → 11.33 kg (p1) — KBS ground truth
- Beam length confirmed: 5,000 mm cantilever
- BCs confirmed: left fixed, right 10,000 kgf downward
- Material confirmed: AISI Steel 1005, density 7.3 g/cm³
- Mesh confirmed: CQUAD4 thin shell, 33.7 mm elements
- Hole geometry: span 4,000 mm (p6), offsets 500 mm fixed
- 3 gaps closed (G1, G2, G8), 6 new gaps identified (G10-G15)
- New expressions: beam_half_height, beam_half_width, beam_length, p6
Files: CONTEXT.md, kb/_index.md, kb/_history.md, kb/components/sandwich-beam.md,
kb/materials/steel-aisi.md, kb/fea/models/sol101-static.md, kb/dev/gen-002.md
2026-02-10 21:49:39 +00:00
## Open Tasks
docs: update KB and project docs with 2026-02-11 progress
- KB Gen 003: NX version (DesigncenterNX 2512), first real results
- sol101-static.md: path resolution lessons, in-place solving, result extraction confirmed
- CONTEXT.md: solver pipeline operational, first results (disp=17.93mm, stress=111.9MPa)
- DECISIONS.md: DEC-HB-008 to DEC-HB-011 (backup/restore, iteration arch, history DB, git workflow)
- optimization_engine/README.md: created (DesigncenterNX support, path resolution, NX file refs)
- studies/01_doe_landscape/README.md: updated architecture, iteration folders, history DB
- _index.md: closed gaps G3,G4,G6,G10-G14, updated generation to 003
2026-02-11 16:39:21 +00:00
1. **Run full 51-trial DOE ** — solver pipeline operational, execute Phase 1
2. **Corner-case testing ** — verify NX rebuild at DV extremes (G7)
3. **Decision on `p6` as DV ** — consult Manager/CEO (G15)
4. **Phase 1 → Phase 2 gate review ** — after DOE completes, assess feasibility landscape