chore(hq): daily sync 2026-03-08
This commit is contained in:
51
hq/workspaces/manager/memory/archive/2026-02-08.md
Normal file
51
hq/workspaces/manager/memory/archive/2026-02-08.md
Normal file
@@ -0,0 +1,51 @@
|
||||
# 2026-02-08
|
||||
|
||||
## New Project: Hydrotech Beam Structural Optimization
|
||||
- **Channel:** #project-hydrotech-beam
|
||||
- **Request:** Optimize I-beam with sandwich cross-section — reduce mass, reduce tip displacement, keep stress safe
|
||||
- **Status:** Intake received, project folder created at `/home/papa/atomizer/projects/hydrotech-beam/`
|
||||
- **Next:** Delegate technical breakdown to Technical Lead (OP_09 → OP_10 Step 2)
|
||||
- 4 design variables, NX Nastran static analysis, steel beam with lightening holes
|
||||
- Current baseline: ~974 kg, ~22 mm displacement
|
||||
- Targets: minimize mass, displacement < 10 mm, stress < 130 MPa
|
||||
|
||||
## Issues Raised by Antoine
|
||||
- No Notion project page yet (Phase 2 feature — not available)
|
||||
- Secretary had no project context — briefed her via sessions_send, she's now tracking it
|
||||
- Slowness noted — all agents on Opus, expected for now
|
||||
- Project folder confirmed at `/home/papa/atomizer/projects/hydrotech-beam/`
|
||||
- Antoine wants cross-agent context sharing to work better — need to think about how Secretary gets project updates automatically
|
||||
|
||||
## Config Changes
|
||||
- Added `#project-hydrotech-beam` (C0AE4CESCC9) to channel config with `requireMention: false`
|
||||
- Antoine no longer needs to tag to get a response in project channels
|
||||
|
||||
## Antoine Request: Project Dashboard & File Access
|
||||
- Manager now owns ALL admin responsibility — Mario only for infrastructure bridges
|
||||
- NO Notion — Antoine doesn't use it
|
||||
- Project data should live in Atomizer repo (Gitea: http://100.80.199.40:3000/Antoine/Atomizer.git)
|
||||
- Documentation = efficient .md files in the repo
|
||||
- Current project files at `/home/papa/atomizer/projects/hydrotech-beam/` need to move into `/home/papa/repos/Atomizer/projects/hydrotech-beam/`
|
||||
- Syncthing syncs: ATODrive, Atomaste, obsidian-vault, Sync — NOT the atomizer workspace
|
||||
- Atomizer repo is git-managed (correct approach for project data)
|
||||
|
||||
## Project Structure Overhaul — COMPLETED
|
||||
- Designed and implemented KB-integrated project structure for Atomizer
|
||||
- Hydrotech Beam restructured: README, CONTEXT, BREAKDOWN, DECISIONS, models/, kb/, studies/, deliverables/
|
||||
- KB initialized: components/sandwich-beam.md, materials/steel-aisi.md, fea/models/sol101-static.md
|
||||
- Gen 001 created from intake + technical breakdown
|
||||
- 6 decisions logged in DECISIONS.md (DEC-HB-001 through DEC-HB-006)
|
||||
- Created `knowledge-base-atomizer-ext.md` — Atomizer extension of Mario's shared KB skill
|
||||
- Extension pattern: use base skill as-is, extend with Atomizer-specific agent workflows
|
||||
- All committed to Gitea: commit 9541958
|
||||
- Channel config fixed: #project-hydrotech-beam no longer requires mention
|
||||
|
||||
## Repo Cleanup — IN PROGRESS
|
||||
- CEO approved major docs cleanup of Atomizer repo
|
||||
- Spawned sub-agent (label: repo-cleanup) to handle:
|
||||
- Archive stale docs (RALPH_LOOP, old CANVAS plans, dashboard iterations) to docs/archive/review/
|
||||
- Create docs/hq/ with agent-facing documentation (PROJECT_STRUCTURE, KB_CONVENTIONS, AGENT_WORKFLOWS, STUDY_CONVENTIONS)
|
||||
- Update docs/00_INDEX.md
|
||||
- KB skill discussion resolved: Mario's pipeline = tool, Atomizer owns project KB, no duplication
|
||||
- Mario's KB output can bootstrap Atomizer project KB if available
|
||||
- CAD-Documenter tool being renamed (to KBS or similar) — update references when it lands
|
||||
61
hq/workspaces/manager/memory/archive/2026-02-09.md
Normal file
61
hq/workspaces/manager/memory/archive/2026-02-09.md
Normal file
@@ -0,0 +1,61 @@
|
||||
# 2026-02-09
|
||||
|
||||
## Phase 1 Approved & Kicked Off
|
||||
- Antoine asked if Phase 0 was complete enough to move forward
|
||||
- Assessed Phase 0 at ~75% complete (structure proven, execution loop not yet tested)
|
||||
- Recommended proceeding to Phase 1 with Hydrotech Beam as the validation project
|
||||
- Antoine approved — Phase 1 is live
|
||||
|
||||
## Phase 1 Agents — Status
|
||||
- Optimizer, Study Builder, Auditor are NOT yet configured as gateway agents
|
||||
- Only Manager, Secretary, Technical Lead exist as real agents
|
||||
- Using sessions_spawn sub-agents as a workaround for now
|
||||
- Need Mario to set up the actual agent workspaces + gateway config for Phase 1 agents
|
||||
|
||||
## Hydrotech Beam — Resuming
|
||||
- Posted project kickoff in #project-hydrotech-beam with full assignment roster
|
||||
- Workflow: serial chain managed by me (per DEC-A003)
|
||||
- Step 1: Optimizer designs strategy ← IN PROGRESS (spawned sub-agent)
|
||||
- Step 2: Auditor reviews plan
|
||||
- Step 3: Study Builder writes code
|
||||
- Step 4: Auditor reviews code
|
||||
- Step 5: CEO approves for execution
|
||||
- Step 6: Run on Windows (manual)
|
||||
- Step 7: Results analysis
|
||||
- 9 technical gaps still open from Tech Lead's breakdown (G1-G9)
|
||||
- Optimizer working from BREAKDOWN.md to produce OPTIMIZATION_STRATEGY.md
|
||||
|
||||
## Antoine Questions
|
||||
- Asked about workflow management (serial vs parallel) — explained I manage the chain
|
||||
- Asked about roll call location — posted project kickoff in #project-hydrotech-beam
|
||||
- Asked "what's next? Where do I review?" — gave full status briefing in #all-atomizer-hq
|
||||
- Pointed to Gitea as the browsable dashboard
|
||||
- Recommended resolving 9 gaps as top priority
|
||||
- Proposed: daily auto-status from Secretary, README as live dashboard
|
||||
- Antoine wants proactive improvement — gave 6 prioritized recommendations
|
||||
|
||||
## File Access Gap Identified
|
||||
- Atomizer repo NOT synced to Windows (dalidou) via Syncthing
|
||||
- Only ATODrive, Atomaste, obsidian-vault, Sync are shared
|
||||
- Model files (Beam.prt, etc.) never added to models/ — placeholder only
|
||||
- Antoine can't browse KB or project docs from Windows
|
||||
- **Resolution:** Antoine setting up Syncthing for `projects/hydrotech-beam/` specifically
|
||||
- Server path: `/home/papa/repos/Atomizer/projects/hydrotech-beam/`
|
||||
- Rest of repo stays git-only (he has Gitea web access from Windows)
|
||||
- .gitignore allows .prt/.fem/.sim (only .bak excluded)
|
||||
- Once sync is live, model files land in models/ and I commit to Gitea
|
||||
- Antoine wants KBS session but needs model files accessible first
|
||||
|
||||
## Single Source of Truth — Consolidation Done
|
||||
- **Canonical project path:** `/home/papa/repos/Atomizer/projects/hydrotech-beam/` (Gitea + Syncthing)
|
||||
- Removed stale duplicate at `/home/papa/atomizer/projects/hydrotech-beam/`
|
||||
- Created symlink so old references still resolve
|
||||
- Cleaned up Syncthing conflict files
|
||||
- All agents should reference `/repos/Atomizer/projects/` from now on
|
||||
- Antoine dropping remaining model files via Syncthing from Windows
|
||||
|
||||
## Improvement Initiatives (Self-Directed)
|
||||
- [ ] Set up Secretary daily status posts
|
||||
- [ ] Update Hydrotech README to be a live status card
|
||||
- [ ] Track gap resolution progress
|
||||
- [x] Consolidate project folder to single source of truth (repo)
|
||||
Reference in New Issue
Block a user