chore(hq): daily sync 2026-02-19

This commit is contained in:
2026-02-19 10:00:18 +00:00
parent 7eb3d11f02
commit 176b75328f
71 changed files with 5928 additions and 1660 deletions

View File

@@ -0,0 +1 @@
/home/papa/atomizer/mission-control/scripts/mc-update.sh

View File

@@ -26,3 +26,5 @@ _Append-only. Manager posts orchestration plans here before delegating work._
- Secretary: Summarize findings into a recommendation report.
**Dependencies:** Tech Lead's work depends on Webster's output. Secretary's work depends on the Tech Lead's output.
**Expected output:** A final recommendation report posted by the Secretary.
- 2026-02-18 UTC | Manager subagent | Atomizer Project Standardization workflow executed: kickoff posted, specialists delegated (tech-lead/auditor/secretary), package + synthesis files published, final approval request posted.

View File

@@ -26,3 +26,8 @@
[2026-02-17 09:05] [manager] TASK-002: Cancelled — Secretary appears to be stuck; tool error on deliverable. Re-creating as TASK-004 assigned to manager to unblock.
[2026-02-17 09:05] [manager] TASK-004: Created — Summarize system test orchestration (replaces TASK-002) (assigned to manager)
[2026-02-17 09:05] [manager] TASK-004: Completed — Summary posted to #reports channel.
[2026-02-18 23:16] webster: Completed — Secondary research validation report for Atomizer Project Standard (NASA-STD-7009B, ASME V&V 10, ECSS, OpenMDAO, Dakota, design rationale, LLM-native docs, modeFRONTIER).
[2026-02-19 00:00] secretary: Completed — Drafted executive synthesis for Atomizer Project Standardization Package; direct #hq post blocked (missing Slack bot token).
- 2026-02-18 UTC | Standardization package assembled and ready for CEO approval. Files: shared/standardization/2026-02-18-atomizer-project-standardization-package.md ; shared/standardization/synthesis/2026-02-18-secretary-synthesis.md
[2026-02-19 00:30 UTC] Auditor: Completed — Atomizer Project Standard spec audit (full report + executive summary)

View File

@@ -0,0 +1,69 @@
# Atomizer-HQ Mission-Dashboard Protocol
## Overview
The Mission-Dashboard at `http://100.68.144.33:8091` is the **single source of truth** for all Atomizer HQ tasks. All agents MUST use it.
## Dashboard Location
- **URL:** http://100.68.144.33:8091
- **Data file:** ~/atomizer/mission-control/data/tasks.json
- **CLI tool:** ~/atomizer/mission-control/scripts/mc-update.sh
## Task Lifecycle
```
backlog → in_progress → review → done
```
| Status | Meaning |
|--------|---------|
| `permanent` | Recurring/standing tasks |
| `backlog` | Waiting to be worked on |
| `in_progress` | Agent is actively working |
| `review` | Done, awaiting human review |
| `done` | Approved by Antoine |
## Agent Responsibilities
### Manager
- Creates new tasks (`mc-update.sh add`)
- Assigns tasks to agents (via comments)
- Moves approved work to `done`
- ALL new projects/orchestrations MUST get a dashboard task
### All Agents
- When starting work: `mc-update.sh start <task_id>`
- Progress updates: `mc-update.sh comment <task_id> "update"`
- Subtask completion: `mc-update.sh subtask <task_id> <sub_id> done`
- When finished: `mc-update.sh complete <task_id> "summary"`
### Secretary
- Reviews task board during reports
- Flags stale in_progress tasks (>24h no update)
### Auditor
- Verifies completed tasks meet DoD before review
## CLI Reference
```bash
MC=~/atomizer/mission-control/scripts/mc-update.sh
# Add new task
$MC add "Title" "Description" [status] [project] [priority]
# Update status
$MC status ATZ-xxx in_progress
# Add comment
$MC comment ATZ-xxx "Progress update: completed phase 1"
# Mark subtask done
$MC subtask ATZ-xxx sub_001 done
# Complete (→ review)
$MC complete ATZ-xxx "Summary of what was done"
```
## Rules
1. **No shadow work** — if it's not on the dashboard, it didn't happen
2. **Update before Slack** — update the task, THEN discuss in Slack
3. **Every orchestration = a task** — Manager creates the task BEFORE spawning agents
4. **Comments are the audit trail** — agents log progress as comments, not just Slack messages

View File

@@ -0,0 +1,76 @@
# Atomizer Project Standardization Package
Date: 2026-02-18 UTC
Owner: Manager (delegated to Tech Lead + Auditor + Secretary)
## 1) Technical Baseline (from Technical Lead)
### Scope
Define a minimum, enforceable baseline for Atomizer HQ so all agents/workspaces produce consistent, reviewable outputs across engineering, orchestration, and reporting.
### Standard Components
- Required identity files: `SOUL.md`, `IDENTITY.md`, `AGENTS.md`, `MEMORY.md`
- Required operational files: `HEARTBEAT.md`, `TOOLS.md`, `USER.md`
- Task tracking: taskboard transitions (`todo → in-progress → review/done`)
- Logging: append-only updates to `shared/project_log.md`
- Technical rigor: assumptions, units, BCs/loads, convergence, confidence in deliverables
### File/Folder Conventions
- Daily notes: `memory/YYYY-MM-DD.md`
- Durable lessons: `memory/knowledge/`
- Review records: `memory/reviews/`
- Shared coordination root: `/home/papa/atomizer/workspaces/shared/`
- Manager-owned status docs must not be directly edited by specialists
### Orchestration Contract
- Use `sessions_spawn` for scoped parallel/deep execution
- Use `sessions_send` for clarification, handoff, escalation
- Every specialist return follows:
- `TASK:`
- `STATUS: complete | partial | blocked | failed`
- `RESULT:`
- `CONFIDENCE: high | medium | low`
- `NOTES: assumptions/risks/next validation`
### Acceptance Criteria
- Required files present and non-empty
- Taskboard updated at start/completion
- Deliverables follow structured result contract
- Shared log updated with timestamped outcome
- No policy boundary violations
## 2) Audit Standard (from Auditor)
### Compliance Checks
- Intake has scope + owner + deadline + mapped task ID
- Manager routing and correct specialist handoff
- Decision traceability via taskboard + `project_log.md`
- Protocol adherence (no review-chain bypass)
- Standardized outputs with assumptions/constraints/risks/repro notes
- Proper escalation for blockers
### Common Failure Modes
- Stale task status
- Missing explicit ownership
- Evidence-free claims
- Merge/release before audit pass
- Conflicting outputs left unresolved
- Wrong channel/result routing
### Evidence Required
- Taskboard transition history
- Linked artifacts (plan/logs/metrics/diffs/review note)
- Baseline vs final KPI table with units/constraints
- Audit log with severity and closure proof
- Final communication proof in designated channel/thread
### Approval Gates
1. Intake gate
2. Execution evidence gate
3. Audit gate (PASS or CONDITIONAL with closure)
4. Release gate (manager confirms critical/major closure)
## 3) Delivery Status
- Package assembled and published to shared workspace
- Team workflow pattern standardized for future projects
- Ready for CEO approval and enforcement

View File

@@ -0,0 +1,23 @@
# Executive Synthesis — Atomizer Project Standardization Package
Published by: Secretary (content prepared), relayed in Slack by Manager due current secretary direct-post token limitation.
Date: 2026-02-18 UTC
## What Completed
- Standardization baseline assembled from Technical Lead standard components + orchestration contract.
- Audit compliance pack completed (checks, failure modes, evidence model, approval gates).
- Consolidated package produced for immediate CEO review and adoption decision.
## Files Produced/Updated
- `/home/papa/atomizer/workspaces/shared/standardization/2026-02-18-atomizer-project-standardization-package.md`
- `/home/papa/atomizer/workspaces/shared/standardization/synthesis/2026-02-18-secretary-synthesis.md`
## What Remains
- CEO approval decision.
- Upon approval: enforce package conventions on new project orchestrations.
## Approval Ask
Antoine: please reply with one of:
- `✅ Approve` — adopt this standardization package now
- `✏️ Approve with amendments` — list required edits
- `⏸️ Hold` — defer adoption pending additional changes