chore(hq): daily sync 2026-02-19
This commit is contained in:
@@ -0,0 +1,76 @@
|
||||
# Atomizer Project Standardization Package
|
||||
|
||||
Date: 2026-02-18 UTC
|
||||
Owner: Manager (delegated to Tech Lead + Auditor + Secretary)
|
||||
|
||||
## 1) Technical Baseline (from Technical Lead)
|
||||
|
||||
### Scope
|
||||
Define a minimum, enforceable baseline for Atomizer HQ so all agents/workspaces produce consistent, reviewable outputs across engineering, orchestration, and reporting.
|
||||
|
||||
### Standard Components
|
||||
- Required identity files: `SOUL.md`, `IDENTITY.md`, `AGENTS.md`, `MEMORY.md`
|
||||
- Required operational files: `HEARTBEAT.md`, `TOOLS.md`, `USER.md`
|
||||
- Task tracking: taskboard transitions (`todo → in-progress → review/done`)
|
||||
- Logging: append-only updates to `shared/project_log.md`
|
||||
- Technical rigor: assumptions, units, BCs/loads, convergence, confidence in deliverables
|
||||
|
||||
### File/Folder Conventions
|
||||
- Daily notes: `memory/YYYY-MM-DD.md`
|
||||
- Durable lessons: `memory/knowledge/`
|
||||
- Review records: `memory/reviews/`
|
||||
- Shared coordination root: `/home/papa/atomizer/workspaces/shared/`
|
||||
- Manager-owned status docs must not be directly edited by specialists
|
||||
|
||||
### Orchestration Contract
|
||||
- Use `sessions_spawn` for scoped parallel/deep execution
|
||||
- Use `sessions_send` for clarification, handoff, escalation
|
||||
- Every specialist return follows:
|
||||
- `TASK:`
|
||||
- `STATUS: complete | partial | blocked | failed`
|
||||
- `RESULT:`
|
||||
- `CONFIDENCE: high | medium | low`
|
||||
- `NOTES: assumptions/risks/next validation`
|
||||
|
||||
### Acceptance Criteria
|
||||
- Required files present and non-empty
|
||||
- Taskboard updated at start/completion
|
||||
- Deliverables follow structured result contract
|
||||
- Shared log updated with timestamped outcome
|
||||
- No policy boundary violations
|
||||
|
||||
## 2) Audit Standard (from Auditor)
|
||||
|
||||
### Compliance Checks
|
||||
- Intake has scope + owner + deadline + mapped task ID
|
||||
- Manager routing and correct specialist handoff
|
||||
- Decision traceability via taskboard + `project_log.md`
|
||||
- Protocol adherence (no review-chain bypass)
|
||||
- Standardized outputs with assumptions/constraints/risks/repro notes
|
||||
- Proper escalation for blockers
|
||||
|
||||
### Common Failure Modes
|
||||
- Stale task status
|
||||
- Missing explicit ownership
|
||||
- Evidence-free claims
|
||||
- Merge/release before audit pass
|
||||
- Conflicting outputs left unresolved
|
||||
- Wrong channel/result routing
|
||||
|
||||
### Evidence Required
|
||||
- Taskboard transition history
|
||||
- Linked artifacts (plan/logs/metrics/diffs/review note)
|
||||
- Baseline vs final KPI table with units/constraints
|
||||
- Audit log with severity and closure proof
|
||||
- Final communication proof in designated channel/thread
|
||||
|
||||
### Approval Gates
|
||||
1. Intake gate
|
||||
2. Execution evidence gate
|
||||
3. Audit gate (PASS or CONDITIONAL with closure)
|
||||
4. Release gate (manager confirms critical/major closure)
|
||||
|
||||
## 3) Delivery Status
|
||||
- Package assembled and published to shared workspace
|
||||
- Team workflow pattern standardized for future projects
|
||||
- Ready for CEO approval and enforcement
|
||||
@@ -0,0 +1,23 @@
|
||||
# Executive Synthesis — Atomizer Project Standardization Package
|
||||
|
||||
Published by: Secretary (content prepared), relayed in Slack by Manager due current secretary direct-post token limitation.
|
||||
Date: 2026-02-18 UTC
|
||||
|
||||
## What Completed
|
||||
- Standardization baseline assembled from Technical Lead standard components + orchestration contract.
|
||||
- Audit compliance pack completed (checks, failure modes, evidence model, approval gates).
|
||||
- Consolidated package produced for immediate CEO review and adoption decision.
|
||||
|
||||
## Files Produced/Updated
|
||||
- `/home/papa/atomizer/workspaces/shared/standardization/2026-02-18-atomizer-project-standardization-package.md`
|
||||
- `/home/papa/atomizer/workspaces/shared/standardization/synthesis/2026-02-18-secretary-synthesis.md`
|
||||
|
||||
## What Remains
|
||||
- CEO approval decision.
|
||||
- Upon approval: enforce package conventions on new project orchestrations.
|
||||
|
||||
## Approval Ask
|
||||
Antoine: please reply with one of:
|
||||
- `✅ Approve` — adopt this standardization package now
|
||||
- `✏️ Approve with amendments` — list required edits
|
||||
- `⏸️ Hold` — defer adoption pending additional changes
|
||||
Reference in New Issue
Block a user