chore(hq): daily sync 2026-02-19

This commit is contained in:
2026-02-19 10:00:18 +00:00
parent 7eb3d11f02
commit 176b75328f
71 changed files with 5928 additions and 1660 deletions

View File

@@ -0,0 +1,76 @@
# Atomizer Project Standardization Package
Date: 2026-02-18 UTC
Owner: Manager (delegated to Tech Lead + Auditor + Secretary)
## 1) Technical Baseline (from Technical Lead)
### Scope
Define a minimum, enforceable baseline for Atomizer HQ so all agents/workspaces produce consistent, reviewable outputs across engineering, orchestration, and reporting.
### Standard Components
- Required identity files: `SOUL.md`, `IDENTITY.md`, `AGENTS.md`, `MEMORY.md`
- Required operational files: `HEARTBEAT.md`, `TOOLS.md`, `USER.md`
- Task tracking: taskboard transitions (`todo → in-progress → review/done`)
- Logging: append-only updates to `shared/project_log.md`
- Technical rigor: assumptions, units, BCs/loads, convergence, confidence in deliverables
### File/Folder Conventions
- Daily notes: `memory/YYYY-MM-DD.md`
- Durable lessons: `memory/knowledge/`
- Review records: `memory/reviews/`
- Shared coordination root: `/home/papa/atomizer/workspaces/shared/`
- Manager-owned status docs must not be directly edited by specialists
### Orchestration Contract
- Use `sessions_spawn` for scoped parallel/deep execution
- Use `sessions_send` for clarification, handoff, escalation
- Every specialist return follows:
- `TASK:`
- `STATUS: complete | partial | blocked | failed`
- `RESULT:`
- `CONFIDENCE: high | medium | low`
- `NOTES: assumptions/risks/next validation`
### Acceptance Criteria
- Required files present and non-empty
- Taskboard updated at start/completion
- Deliverables follow structured result contract
- Shared log updated with timestamped outcome
- No policy boundary violations
## 2) Audit Standard (from Auditor)
### Compliance Checks
- Intake has scope + owner + deadline + mapped task ID
- Manager routing and correct specialist handoff
- Decision traceability via taskboard + `project_log.md`
- Protocol adherence (no review-chain bypass)
- Standardized outputs with assumptions/constraints/risks/repro notes
- Proper escalation for blockers
### Common Failure Modes
- Stale task status
- Missing explicit ownership
- Evidence-free claims
- Merge/release before audit pass
- Conflicting outputs left unresolved
- Wrong channel/result routing
### Evidence Required
- Taskboard transition history
- Linked artifacts (plan/logs/metrics/diffs/review note)
- Baseline vs final KPI table with units/constraints
- Audit log with severity and closure proof
- Final communication proof in designated channel/thread
### Approval Gates
1. Intake gate
2. Execution evidence gate
3. Audit gate (PASS or CONDITIONAL with closure)
4. Release gate (manager confirms critical/major closure)
## 3) Delivery Status
- Package assembled and published to shared workspace
- Team workflow pattern standardized for future projects
- Ready for CEO approval and enforcement

View File

@@ -0,0 +1,23 @@
# Executive Synthesis — Atomizer Project Standardization Package
Published by: Secretary (content prepared), relayed in Slack by Manager due current secretary direct-post token limitation.
Date: 2026-02-18 UTC
## What Completed
- Standardization baseline assembled from Technical Lead standard components + orchestration contract.
- Audit compliance pack completed (checks, failure modes, evidence model, approval gates).
- Consolidated package produced for immediate CEO review and adoption decision.
## Files Produced/Updated
- `/home/papa/atomizer/workspaces/shared/standardization/2026-02-18-atomizer-project-standardization-package.md`
- `/home/papa/atomizer/workspaces/shared/standardization/synthesis/2026-02-18-secretary-synthesis.md`
## What Remains
- CEO approval decision.
- Upon approval: enforce package conventions on new project orchestrations.
## Approval Ask
Antoine: please reply with one of:
- `✅ Approve` — adopt this standardization package now
- `✏️ Approve with amendments` — list required edits
- `⏸️ Hold` — defer adoption pending additional changes