feat: add Atomizer HQ multi-agent cluster infrastructure
- 8-agent OpenClaw cluster (Manager, Tech-Lead, Secretary, Auditor, Optimizer, Study-Builder, NX-Expert, Webster) - Orchestration engine: orchestrate.py (sync delegation + handoffs) - Workflow engine: YAML-defined multi-step pipelines - Agent workspaces: SOUL.md, AGENTS.md, MEMORY.md per agent - Shared skills: delegate, orchestrate, atomizer-protocols - Capability registry (AGENTS_REGISTRY.json) - Cluster management: cluster.sh, systemd template - All secrets replaced with env var references
This commit is contained in:
34
hq/workspaces/secretary/memory/2026-02-08.md
Normal file
34
hq/workspaces/secretary/memory/2026-02-08.md
Normal file
@@ -0,0 +1,34 @@
|
||||
# Daily Log — 2026-02-08
|
||||
|
||||
## Projects Active
|
||||
|
||||
### **Hydrotech Beam Structural Optimization**
|
||||
- **Channel:** #project-hydrotech-beam
|
||||
- **Status:** Intake complete, technical breakdown done by Tech Lead
|
||||
- **Objective:**
|
||||
- Reduce mass (~974 kg baseline)
|
||||
- Reduce tip displacement (~22mm → target <10mm)
|
||||
- Keep stress <130 MPa
|
||||
- **Design variables (4):** core thickness, face thickness, hole diameter, hole count
|
||||
- **Solver:** NX Nastran (static structural)
|
||||
- **Project folder:** `/home/papa/atomizer/projects/hydrotech-beam/`
|
||||
|
||||
### Key Technical Finding
|
||||
- **⚠️ Critical issue:** Baseline already violates displacement constraint (22mm > 10mm target)
|
||||
- **Risk:** Feasible region may be tight
|
||||
- **Blocker:** 9 gaps identified by Tech Lead that need Antoine's input before optimization can proceed
|
||||
|
||||
### Next Steps
|
||||
1. **🔴 URGENT:** Gap resolution session with Antoine
|
||||
2. Model validation
|
||||
3. DoE (Design of Experiments)
|
||||
|
||||
## Communication
|
||||
- Antoine asked for updates on Hydrotech project (21:41 UTC)
|
||||
- Manager provided full briefing (21:43+ UTC)
|
||||
- Antoine mentioned posting details in #project-hydrotech-beam channel
|
||||
|
||||
## Notes
|
||||
- Antoine initially seemed surprised I didn't see #project-hydrotech-beam content
|
||||
- I don't have access to read that channel directly
|
||||
- All project coordination happening through Manager per protocols
|
||||
7
hq/workspaces/secretary/memory/pending.md
Normal file
7
hq/workspaces/secretary/memory/pending.md
Normal file
@@ -0,0 +1,7 @@
|
||||
# Pending Items — Needs Antoine's Attention
|
||||
|
||||
## Hydrotech Beam Project — Status
|
||||
- Technical gaps resolved, displacement constraint relaxed 10mm → 20mm (DEC-HB-012, CEO approved)
|
||||
- Mass NaN bug fixed (commit `580ed65`)
|
||||
- **Next:** Pull fix on dalidou, test single trial, re-run full DOE with 20mm constraint
|
||||
- **Updated:** 2026-02-14 (digestion cycle)
|
||||
Reference in New Issue
Block a user