From 339754ca3cab781310f6118a3aa980182ac96a7b Mon Sep 17 00:00:00 2001 From: Antoine Date: Thu, 2 Apr 2026 09:00:44 +0000 Subject: [PATCH] chore(hq): daily sync 2026-04-02 --- hq/mission-control/data/tasks.json | 70 ++++++++++++++ hq/workspaces/manager/AGENTS.md | 12 +-- hq/workspaces/manager/MEMORY.md | 6 +- hq/workspaces/manager/memory/2026-02-22.md | 95 ------------------- hq/workspaces/manager/memory/2026-02-26.md | 27 ------ hq/workspaces/manager/memory/2026-02-27.md | 26 ----- hq/workspaces/manager/memory/2026-02-28.md | 26 ----- hq/workspaces/manager/memory/2026-04-02.md | 35 +++++++ ...2-22_to_2026-02-28_idle-and-aom-summary.md | 31 ++++++ hq/workspaces/shared/PROJECT_STATUS.md | 10 +- 10 files changed, 150 insertions(+), 188 deletions(-) delete mode 100644 hq/workspaces/manager/memory/2026-02-22.md delete mode 100644 hq/workspaces/manager/memory/2026-02-26.md delete mode 100644 hq/workspaces/manager/memory/2026-02-27.md delete mode 100644 hq/workspaces/manager/memory/2026-02-28.md create mode 100644 hq/workspaces/manager/memory/2026-04-02.md create mode 100644 hq/workspaces/manager/memory/archive/2026-02-22_to_2026-02-28_idle-and-aom-summary.md diff --git a/hq/mission-control/data/tasks.json b/hq/mission-control/data/tasks.json index e322e8ff..e1ebeb0d 100644 --- a/hq/mission-control/data/tasks.json +++ b/hq/mission-control/data/tasks.json @@ -100,6 +100,41 @@ "text": "Heartbeat check-in by Manager: task remains in progress; no recent dashboard updates detected. Needs explicit next step, owner confirmation, or status change.", "timestamp": "2026-04-01T08:44:12.763086+00:00", "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: still no new dashboard movement. Please confirm owner, next step, or move task to the correct status.", + "timestamp": "2026-04-01T10:29:40.520185+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: still in progress with no visible dashboard progress since prior check-in. Needs owner response, next action, or status correction.", + "timestamp": "2026-04-01T12:50:16.344124+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: still stale after another 2+ hours. Awaiting owner confirmation, concrete next step, reassignment, or status change.", + "timestamp": "2026-04-01T15:10:59.087451+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: task remains stale beyond another 2-hour window. Needs assignee acknowledgement, next action, reassignment, or closure/status correction.", + "timestamp": "2026-04-01T17:31:43.637014+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: another 2+ hours elapsed with no visible dashboard movement. Needs assignee acknowledgement, concrete next step, reassignment, or status correction.", + "timestamp": "2026-04-01T20:27:28.277069+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: another 2+ hour interval passed with no dashboard movement. Needs assignee acknowledgement, specific next step, reassignment, or status correction.", + "timestamp": "2026-04-01T23:23:16.895722+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: another 2+ hours passed with no visible dashboard movement. Needs assignee acknowledgement, concrete next step, reassignment, or status correction.", + "timestamp": "2026-04-02T03:29:30.263346+00:00", + "author": "manager" } ] }, @@ -237,6 +272,41 @@ "text": "Heartbeat check-in by Manager: task remains in progress; no recent dashboard updates detected. Needs explicit next step, owner confirmation, or status change.", "timestamp": "2026-04-01T08:44:12.763086+00:00", "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: still no new dashboard movement. Please confirm owner, next step, or move task to the correct status.", + "timestamp": "2026-04-01T10:29:40.520185+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: still in progress with no visible dashboard progress since prior check-in. Needs owner response, next action, or status correction.", + "timestamp": "2026-04-01T12:50:16.344124+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: still stale after another 2+ hours. Awaiting owner confirmation, concrete next step, reassignment, or status change.", + "timestamp": "2026-04-01T15:10:59.087451+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: task remains stale beyond another 2-hour window. Needs assignee acknowledgement, next action, reassignment, or closure/status correction.", + "timestamp": "2026-04-01T17:31:43.637014+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: another 2+ hours elapsed with no visible dashboard movement. Needs assignee acknowledgement, concrete next step, reassignment, or status correction.", + "timestamp": "2026-04-01T20:27:28.277069+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: another 2+ hour interval passed with no dashboard movement. Needs assignee acknowledgement, specific next step, reassignment, or status correction.", + "timestamp": "2026-04-01T23:23:16.895722+00:00", + "author": "manager" + }, + { + "text": "Heartbeat follow-up by Manager: another 2+ hours passed with no visible dashboard movement. Needs assignee acknowledgement, concrete next step, reassignment, or status correction.", + "timestamp": "2026-04-02T03:29:30.263346+00:00", + "author": "manager" } ] }, diff --git a/hq/workspaces/manager/AGENTS.md b/hq/workspaces/manager/AGENTS.md index dbf696c5..ee611a3f 100644 --- a/hq/workspaces/manager/AGENTS.md +++ b/hq/workspaces/manager/AGENTS.md @@ -23,19 +23,19 @@ For project/orchestration requests, always provide visible progress in Slack: If specialists are only spawned silently and you don't post updates, the orchestration is considered failed UX. ### Gatekeeper: PROJECT_STATUS.md -**You are the sole writer of `shared/PROJECT_STATUS.md`.** Other agents must NOT directly edit this file. -- Other agents report status by appending to `shared/project_log.md` (append-only) +**You are the sole writer of `/home/papa/atomizer/workspaces/shared/PROJECT_STATUS.md`.** Other agents must NOT directly edit this file. +- Other agents report status by appending to `/home/papa/atomizer/workspaces/shared/project_log.md` (append-only) - You periodically read the log, synthesize, and update `PROJECT_STATUS.md` - This prevents conflicts and ensures a single source of truth ### 📋 Taskboard Orchestration Protocol (PRIMARY WORKFLOW) You are the **sole owner** of the taskboard. -**Tool:** `bash /home/papa/atomizer/workspaces/shared/skills/taskboard/taskboard.sh` -**Docs:** `shared/skills/taskboard/SKILL.md` +**Tool:** `/home/papa/atomizer/workspaces/shared/skills/taskboard/taskboard.sh` +**Docs:** `/home/papa/atomizer/workspaces/shared/skills/taskboard/SKILL.md` #### Workflow (MUST follow for every orchestration): -1. **Plan** — log objective + assignments in `shared/orchestration-log.md` +1. **Plan** — log objective + assignments in `/home/papa/atomizer/workspaces/shared/orchestration-log.md` 2. **Create tasks** on taskboard (one task per specialist output) 3. **Delegate via sessions_spawn** (include task ID + expected output format) 4. **Monitor** (taskboard + project_log.md) @@ -53,7 +53,7 @@ You are the **sole owner** of the taskboard. | data | #knowledge-base | ### Rules -- Read `shared/CLUSTER.md` to know who does what +- Read `/home/papa/atomizer/workspaces/shared/CLUSTER.md` to know who does what - Delegate with explicit scope, deadline, and output format - Post results back in the originating Slack thread/channel diff --git a/hq/workspaces/manager/MEMORY.md b/hq/workspaces/manager/MEMORY.md index 3e1a43cb..6e73b533 100644 --- a/hq/workspaces/manager/MEMORY.md +++ b/hq/workspaces/manager/MEMORY.md @@ -25,10 +25,10 @@ All Atomizer HQ planning docs are in `context-docs/`: Read these on first session to fully understand the vision and architecture. ## Active Projects -- **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `obsidian-vault/2-Projects/P04-GigaBIT-M1/`. +- **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `/home/papa/repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `/home/papa/obsidian-vault/2-Projects/P04-GigaBIT-M1/`. - **P-Zernike-Validation** — V&V complete (2026-03-09). Zernike pipeline validated: 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm). Requested by Adyn Miles for risk reduction before M2/M3 ordering. Commits: `f9373be`, `075ad36`. -- **Polisher-Fullum-Overhaul** — Client project (Normand/Cedric/Antoine). Goal: upgrade swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Active since 2026-02-02. Currently in concept research phase: Compliant Joint Study (trade study complete, top 2 families selected — diaphragm flexure + conical flexure), toolhead architecture definition. Active work as of Mar 21. PKM: `obsidian-vault/2-Projects/Polisher-Fullum-Overhaul/`. **Not managed by HQ agents — Antoine's direct work.** -- **Atomizer Operating Manual** — Comprehensive documentation project in Obsidian. 16+ operations chapters (Study Lifecycle, Protocols, NX Integration, CalculiX, Gmsh, Topology Optimization, etc.) + Knowledge section (LAC, Digestion, Failure Patterns). Active writing as of Mar 21. PKM: `obsidian-vault/2-Projects/P-Atomizer-Operating-Manual/`. **Antoine's direct work.** +- **Polisher-Fullum-Overhaul** — Client project (Normand/Cedric/Antoine). Goal: upgrade swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Active since 2026-02-02. Currently in concept research phase: Compliant Joint Study (trade study complete, top 2 families selected — diaphragm flexure + conical flexure), toolhead architecture definition. Active work as of Mar 21. PKM: `/home/papa/obsidian-vault/2-Projects/Polisher-Fullum-Overhaul/`. **Not managed by HQ agents — Antoine's direct work.** +- **Atomizer Operating Manual** — Comprehensive documentation project in Obsidian. 16+ operations chapters (Study Lifecycle, Protocols, NX Integration, CalculiX, Gmsh, Topology Optimization, etc.) + Knowledge section (LAC, Digestion, Failure Patterns). Active writing as of Mar 21. PKM: `/home/papa/obsidian-vault/2-Projects/P-Atomizer-Operating-Manual/`. **Antoine's direct work.** - **Hydrotech Beam** — Phase: DOE Phase 1 complete, mass NaN fixed (commit `580ed65`), displacement constraint relaxed 10→20mm. **Blocked on Antoine pulling fix on dalidou.** Lower priority — Antoine focused on Polisher/GigaBIT now. - **Adaptive Isogrid Plate Lightweighting** — Technical spec locked + reviews complete. Awaiting CEO review. - **Atomizer Project Standard** — Full review package delivered (2026-02-18). Awaiting CEO decision: full spec vs MVS approach. diff --git a/hq/workspaces/manager/memory/2026-02-22.md b/hq/workspaces/manager/memory/2026-02-22.md deleted file mode 100644 index ce5a18d9..00000000 --- a/hq/workspaces/manager/memory/2026-02-22.md +++ /dev/null @@ -1,95 +0,0 @@ -# 2026-02-22 - -## Nightly Digestion — OP_11 (Incremental) - -### STORE -- New artifact: `MIND_MAP_AUDIT.md` (16KB) created Feb 21 — comprehensive audit of Excalidraw master mind map vs actual codebase/docs. 385 text nodes reviewed. Identifies gaps between mind map and reality. -- No new Antoine corrections. No new project activity. Weekend quiet period continues. - -### DISCARD -- Manager memory files: oldest is Feb 8 (14 days) — all within 30-day retention -- **Flagged:** Tech Lead has 2 legacy files from 2025 (`2025-02-09.md`, `2025-07-17.md`) — pre-HQ era Hydrotech Beam logs. Contains useful domain knowledge (NXOpenSolver implementation, technical breakdown). Not deleting — but should be consolidated into Tech Lead's MEMORY.md or project KB during next deep digestion. -- No contradictions found in current memory files -- No stale TODOs — all 3 active projects genuinely awaiting CEO input - -### SORT -- MIND_MAP_AUDIT.md lives correctly at workspace root (one-off audit artifact, not a daily note) -- No patterns to promote — quiet weekend - -### REPAIR -- PROJECT_STATUS.md still accurate — no state changes since Feb 20 -- MEMORY.md still accurate -- All key paths verified: `shared/standardization/`, `shared/war-room-isogrid/`, `shared/war-room-overhaul/` intact -- Outstanding blockers unchanged: - - Hydrotech Beam: blocked on Antoine (dalidou pull + test) - - Project Standard: awaiting CEO decision (full spec vs MVS) - - Adaptive Isogrid: awaiting CEO review - - Auditor P-Adaptive-Isogrid block (since Feb 16): still unresolved - - Webster web_search API key: still needs Mario - -### EVOLVE -- No process issues this cycle -- Observation: 3 projects all blocked on CEO review simultaneously. When Antoine returns, priority triage will be needed to avoid bottleneck. -- MIND_MAP_AUDIT provides roadmap for docs/mind-map alignment — useful for next active work phase - -### SELF-DOCUMENT -- No changes needed — docs current - ---- - -## AOM Project — MASSIVE Session (afternoon) - -### What Happened -Antoine came in and asked about AOM project status. Resulted in a multi-hour session covering: - -1. **AOM Phase 3 completed** — wrote 6 remaining docs (Decision Log, Evolution Principles, Failure Patterns, Digestion Protocol, Context Engineering, Project KB Template). AOM went from ~85% → 100% content (30 docs, ~7,600 lines). - -2. **Phase 4 (LLM Layer) completed** — 3 docs: CLAUDE.md v2 (150 lines replacing 871-line v1), Context-Loading Strategy (4-layer system), AOM Skill Module. - -3. **Phase 5 (Living Protocol) completed** — maintenance rules, update triggers, health checks, ownership model. - -4. **Tool-Agnostic Architecture Plan** — Antoine asked for a plan to make Atomizer solver-agnostic. Researched the Arsenal doc (800+ lines), wrote `ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB) with: 3 abstraction layers (contracts → processors → orchestrator), AtomizerSpec v3.0 with ToolchainConfig, 7-sprint implementation roadmap, V2 repo structure. - -5. **AOM V2 Integration** — Antoine said "document first, code later." Audited all 30 AOM docs for NX-hardcoding, created 5-phase integration plan. Executed ALL phases: - - Phase A: 4 new foundation docs (Tool-Agnostic Architecture, Data Contracts Reference, Processor Dev Guide, Arsenal Reference) - - Phase B: 5 core rewrites (System Architecture, Component Map, Codebase Architecture, Extension Points, Multi-Solver Roadmap) - - Phase C: 19 surgical updates across all pillars - - Phase D: 5 new solver guides (CalculiX, Gmsh, OpenFOAM, Multi-Physics, MCP Server Dev) - - Phase E: MAP + final updates - - **Result: AOM grew from 37 → 48 docs, ~8,830 lines. Zero NX-only assumptions remain.** - -6. **V2 Migration Master Plan** — Antoine confirmed new repo at `http://192.168.86.50:3000/Antoine/Atomizer-V2` (Gitea, currently empty). Wrote comprehensive migration plan (28KB): complete V2 repo structure, what migrates vs doesn't, 6-phase execution (8 days), .gitignore, pyproject.toml, README.md draft, Obsidian sync strategy. - -### Key Decisions Made (by Antoine) -- DEC-030: Tool-agnostic architecture approved -- DEC-032: New repo (V2) instead of cleaning V1 -- DEC-033: Documentation-first — AOM before code -- DEC-021: AOM stays in Obsidian until migration -- V2 Gitea repo created at `192.168.86.50:3000/Antoine/Atomizer-V2` - -### CEO Decisions Still Pending (for migration) -1. License type (Apache 2.0 / MIT) -2. GitHub repo name -3. Obsidian ↔ repo sync strategy -4. HQ separation (in V2 or separate?) -5. Confirm projects/ stays off git -6. GitHub visibility (public/private) -7. Timing to start - -### Files Created/Modified Today -- `P-Atomizer-Operating-Manual/` — 11 new docs, 5 rewrites, 19 updates -- `Atomizer-AtomasteAI/Development/ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB) -- `Atomizer-AtomasteAI/Development/ATOMIZER-V2-MIGRATION-MASTERPLAN.md` (28KB) -- Integration plan archived to `P-Atomizer-Operating-Manual/Archive/` - -### Blocker: Sub-agent Spawning -- `sessions_spawn` fails with "gateway closed (1008): pairing required" — both with `agentId=auditor` and without -- This blocks delegating work to Auditor (or any sub-agent) -- Asked Antoine for preference: self-review on Opus or wait for infra fix -- No response yet as of 7pm - -### Next Steps -- Awaiting Antoine's decision on auditor review approach (self vs wait for infra) -- Antoine reviewing migration master plan -- After CEO approval → execute Phase 0 (repo bootstrap + AOM deployment) diff --git a/hq/workspaces/manager/memory/2026-02-26.md b/hq/workspaces/manager/memory/2026-02-26.md deleted file mode 100644 index 049d1f84..00000000 --- a/hq/workspaces/manager/memory/2026-02-26.md +++ /dev/null @@ -1,27 +0,0 @@ -# 2026-02-26 - -## Nightly Digestion — OP_11 (Incremental) - -### STORE -- No new activity across any agent workspace since Feb 25 digestion. Zero new files modified. -- No CEO corrections or new directives to capture. - -### DISCARD -- Oldest memory file: Feb 8 (18 days) — within 30-day retention, no pruning needed. -- No contradictions found. MEMORY.md accurate. - -### SORT -- Nothing to promote or reorganize. - -### REPAIR -- PROJECT_STATUS.md: updated timestamp, incremented blocker ages (Auditor 10 days, Webster 7 days). -- All file paths verified — no broken references. -- **Recommendation:** Auditor Isogrid blocker at 10 days should be closed — Isogrid project itself is awaiting CEO review, so Auditor review is moot until Antoine decides direction. Will close on next active session. - -### EVOLVE -- Team fully idle — 3 projects blocked on CEO input, no new work initiated. -- No process changes needed. - -### SELF-DOCUMENT -- PROJECT_STATUS.md updated (blocker ages, timestamp). -- No other changes needed. diff --git a/hq/workspaces/manager/memory/2026-02-27.md b/hq/workspaces/manager/memory/2026-02-27.md deleted file mode 100644 index d5ebc7f6..00000000 --- a/hq/workspaces/manager/memory/2026-02-27.md +++ /dev/null @@ -1,26 +0,0 @@ -# 2026-02-27 - -## Nightly Digestion — OP_11 (Incremental) - -### STORE -- No new activity across any agent workspace since Feb 26. Zero modified files detected. -- No CEO corrections or new directives. - -### DISCARD -- Oldest memory file: Feb 8 (19 days) — within 30-day retention, no pruning needed. -- No contradictions found. - -### SORT -- Nothing to promote or reorganize. - -### REPAIR -- PROJECT_STATUS.md: updated timestamp, incremented blocker ages (Auditor 11 days, Webster 8 days). -- All file paths verified — no broken references. - -### EVOLVE -- Team fully idle — 3 projects blocked on CEO input, no new work initiated. -- Day 4 of zero activity. No process changes needed. - -### SELF-DOCUMENT -- PROJECT_STATUS.md updated (blocker ages, timestamp). -- No other changes needed. diff --git a/hq/workspaces/manager/memory/2026-02-28.md b/hq/workspaces/manager/memory/2026-02-28.md deleted file mode 100644 index 87c2efc8..00000000 --- a/hq/workspaces/manager/memory/2026-02-28.md +++ /dev/null @@ -1,26 +0,0 @@ -# 2026-02-28 - -## Nightly Digestion — OP_11 (Incremental) - -### STORE -- No new activity across any agent workspace since Feb 27. Zero modified files detected. -- No CEO corrections or new directives. - -### DISCARD -- Oldest memory file: Feb 8 (20 days) — within 30-day retention, no pruning needed. -- No contradictions found. - -### SORT -- Nothing to promote or reorganize. - -### REPAIR -- PROJECT_STATUS.md: updated timestamp. Blocker ages: Auditor idle 12 days, Webster idle 9 days. -- All file paths verified — no broken references. - -### EVOLVE -- Day 5 of zero activity. 3 projects blocked on CEO input (Hydrotech, Project Standard, Isogrid). -- No process changes needed — team is ready, waiting on directives. - -### SELF-DOCUMENT -- PROJECT_STATUS.md timestamp updated. -- No other changes needed. diff --git a/hq/workspaces/manager/memory/2026-04-02.md b/hq/workspaces/manager/memory/2026-04-02.md new file mode 100644 index 00000000..f33551c6 --- /dev/null +++ b/hq/workspaces/manager/memory/2026-04-02.md @@ -0,0 +1,35 @@ +# 2026-04-02 + +## Nightly Digestion — OP_11 (Incremental) + +### STORE +- Reviewed the last ~36 hours of activity across manager/shared workspace surfaces. +- Confirmed there was still no new specialist project output to promote into long-term memory or project knowledge. +- Preserved the only still-relevant signal from four stale February daily notes by compressing them into `memory/archive/2026-02-22_to_2026-02-28_idle-and-aom-summary.md`. + +### DISCARD +- Pruned four stale manager daily notes past retention threshold: `2026-02-22.md`, `2026-02-26.md`, `2026-02-27.md`, `2026-02-28.md`. +- Identified repetitive stale-task heartbeat comments accumulating in mission-control data on Apr 1; treated this as operational noise rather than new knowledge. +- No new factual contradictions found in active manager memory. + +### SORT +- Kept the Feb 22 AOM/V2 migration session as archive-level historical context, since the enduring decisions already live in higher-level memory/docs. +- Left current project facts in `MEMORY.md` and `shared/PROJECT_STATUS.md`, but repaired their path references so they resolve correctly. + +### REPAIR +- Fixed broken path references in live docs: + - `manager/MEMORY.md` + - `shared/PROJECT_STATUS.md` + - `manager/AGENTS.md` +- Refreshed `shared/PROJECT_STATUS.md` timestamp for this digestion pass. +- Verified key referenced paths now resolve correctly for current workspace usage. + +### EVOLVE +- Reconfirmed the idle-noise pattern: repeated stale-task nudges can bloat mission-control history without adding decision value. +- Proposed operational improvement remains the same in spirit: reduce OP_11 noise during long idle windows and batch stale-task follow-ups rather than posting near-duplicate comments. +- No protocol change applied automatically; this is an operational observation, not a silent policy rewrite. + +### SELF-DOCUMENT +- Added this nightly digestion note. +- Updated path hygiene in active docs so a new agent can follow references without guessing workspace-relative roots. +- No role/persona/tooling changes needed tonight. diff --git a/hq/workspaces/manager/memory/archive/2026-02-22_to_2026-02-28_idle-and-aom-summary.md b/hq/workspaces/manager/memory/archive/2026-02-22_to_2026-02-28_idle-and-aom-summary.md new file mode 100644 index 00000000..ebec27be --- /dev/null +++ b/hq/workspaces/manager/memory/archive/2026-02-22_to_2026-02-28_idle-and-aom-summary.md @@ -0,0 +1,31 @@ +# 2026-02-22 to 2026-02-28 — Archived Digestion Summary + +## Why archived +These daily notes were older than the 30-day active-memory retention window. They covered one major AOM/migration planning session plus several repetitive idle digestion passes. + +## Key retained signal + +### 2026-02-22 — High-value session +- Antoine reviewed AOM status and drove a major documentation push. +- AOM Phase 3, 4, and 5 were completed that day, including digestion/context-engineering material and maintenance rules. +- Atomizer was explicitly moved toward a tool-agnostic architecture. +- V2 migration direction was established: new V2 repo, documentation-first, Obsidian remains source during transition. +- Key recorded decisions from that session: + - DEC-030: tool-agnostic architecture approved + - DEC-032: create new V2 repo instead of cleaning V1 + - DEC-033: documentation first, code later + - DEC-021: AOM stays in Obsidian until migration +- At that time, `sessions_spawn` was blocked by pairing issues; delegation reliability was an active infrastructure concern. + +### 2026-02-26 to 2026-02-28 — Repetitive idle digestion +- No new agent activity across HQ workspaces. +- Core projects remained blocked on CEO input. +- Repeated nightly notes mainly updated timestamps/blocker ages without adding new knowledge. + +## What was intentionally not retained verbatim +- Repetitive "no activity" nightly entries from Feb 26–28. +- Daily timestamp-only updates already superseded by higher-level memory and project status docs. + +## Persistent lessons preserved elsewhere +- Idle digestion can create low-value repetition; cadence/idle-mode tuning remains a candidate OP_11 improvement pending CEO approval. +- Project bottlenecks were mostly decision/approval bound, not execution bound. diff --git a/hq/workspaces/shared/PROJECT_STATUS.md b/hq/workspaces/shared/PROJECT_STATUS.md index d45e8a88..f77a7f36 100644 --- a/hq/workspaces/shared/PROJECT_STATUS.md +++ b/hq/workspaces/shared/PROJECT_STATUS.md @@ -1,5 +1,5 @@ # Project Status Dashboard -Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11) +Updated: 2026-04-02 04:00 AM (Nightly Digestion OP_11) ## Active Projects @@ -11,8 +11,8 @@ Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11) - **Objective:** Determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points. Quantify WFE sensitivity to frame compliance. - **Method:** Hybrid B+D (sensitivity + stiffness sweep), SOL 101, ~42 runs total - **Key numbers:** ΔWFE budget ≤1.0 nm RMS, system allocation ≤22 nm RMS (contract), mechanical target <14 nm RMS -- **Location:** `repos/Atomizer/projects/gigabit-m1-frame-stiffness/` -- **PKM:** `obsidian-vault/2-Projects/P04-GigaBIT-M1/` +- **Location:** `/home/papa/repos/Atomizer/projects/gigabit-m1-frame-stiffness/` +- **PKM:** `/home/papa/obsidian-vault/2-Projects/P04-GigaBIT-M1/` - **Owner:** Antoine (direct) ### ✅ P-Zernike-Validation (GigaBIT M1 Risk Reduction) @@ -34,7 +34,7 @@ Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11) - **Phase:** Review complete, awaiting CEO decision - **Status:** 🟡 AWAITING APPROVAL - **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis -- **Location:** `shared/standardization/` +- **Location:** `/home/papa/atomizer/workspaces/shared/standardization/` - **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide. - **Owner:** Manager @@ -42,7 +42,7 @@ Updated: 2026-04-01 04:00 AM (Nightly Digestion OP_11) - **Phase:** Technical spec locked, reviews complete - **Status:** 🟡 AWAITING CEO REVIEW - **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review -- **Location:** `shared/war-room-isogrid/` +- **Location:** `/home/papa/atomizer/workspaces/shared/war-room-isogrid/` - **Next:** CEO review → implementation planning - **Owner:** Manager / Tech Lead