diff --git a/hq/workspaces/manager/MEMORY.md b/hq/workspaces/manager/MEMORY.md index 91c68d60..b79585ac 100644 --- a/hq/workspaces/manager/MEMORY.md +++ b/hq/workspaces/manager/MEMORY.md @@ -25,11 +25,13 @@ All Atomizer HQ planning docs are in `context-docs/`: Read these on first session to fully understand the vision and architecture. ## Active Projects -- **Hydrotech Beam** — Channel: `#project-hydrotech-beam` | Phase: DOE Phase 1 complete (39/51 solved, mass NaN fixed via commit 580ed65, displacement constraint relaxed 10→20mm). Next: pull fix on dalidou, rerun DOE. **Blocked on Antoine running updated code on dalidou.** -- **Adaptive Isogrid Plate Lightweighting** — Channel: war-room-isogrid | Phase: Technical spec locked + reviews complete. Full spec (32KB) + optimizer/tech-lead/webster reviews in `shared/war-room-isogrid/`. Architecture: "Python Brain + NX Hands + Atomizer Manager". Next: CEO review → implementation planning. -- **Atomizer Project Standard** — Phase: Full review package delivered (2026-02-18). Spec (~57KB), tech-lead review, auditor audit, secretary synthesis all complete. Files in `shared/standardization/`. **Auditor verdict: spec is over-engineered — recommends Minimum Viable Standard (MVS) based on Hydrotech Beam's existing structure.** Awaiting CEO decision: adopt full spec vs MVS approach. Next: Antoine review → decision → implementation. -- **Atomizer V2 Migration** — Phase: COMPLETE (2026-02-23). 8 commits pushed to Gitea. 218+ Python files, 58 tests passing. All phases done: repo bootstrap, core engine port, integration testing, reference implementation, CLAUDE.md, Data Contracts (5 dataclasses), Pipeline-NX integration tests, roadmap for items 4-9. Dalidou validated: `import atomizer` v2.0.0 + 24/24 tests on Windows. V1 tagged `v1-final` but kept active for Antoine's current optimizations. AOM→Obsidian auto-sync via crontab (15min rsync + wiki-link conversion). Phase 6 (archive V1) deferred until Antoine switches production work. -- **Atomizer/HQ Separation** — CEO decision (2026-02-23): Atomizer = product (V2 repo), HQ = AI operations team (HQ repo). AOM governs the product. 7 AOM docs updated to reflect boundary. DEC-037 logged. HQ repo pushed to Gitea with full operational structure (218 files). +- **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `obsidian-vault/2-Projects/P04-GigaBIT-M1/`. +- **P-Zernike-Validation** — V&V complete (2026-03-09). Zernike pipeline validated: 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm). Requested by Adyn Miles for risk reduction before M2/M3 ordering. Commits: `f9373be`, `075ad36`. +- **Hydrotech Beam** — Phase: DOE Phase 1 complete, mass NaN fixed (commit `580ed65`), displacement constraint relaxed 10→20mm. **Blocked on Antoine pulling fix on dalidou.** Lower priority — Antoine focused on GigaBIT M1 now. +- **Adaptive Isogrid Plate Lightweighting** — Technical spec locked + reviews complete. Awaiting CEO review. +- **Atomizer Project Standard** — Full review package delivered (2026-02-18). Awaiting CEO decision: full spec vs MVS approach. +- **Atomizer V2 Migration** — ✅ COMPLETE (2026-02-23). V1 tagged `v1-final`, kept active. Phase 6 (archive V1) deferred. +- **Atomizer/HQ Separation** — ✅ COMPLETE (2026-02-23). DEC-037 logged. ## Core Protocols - **OP_11 — Digestion Protocol** (CEO-approved 2026-02-11): STORE → DISCARD → SORT → REPAIR → EVOLVE → SELF-DOCUMENT. Runs at phase completion, weekly heartbeat, and project close. Antoine's corrections are ground truth. diff --git a/hq/workspaces/manager/memory/2026-02-11.md b/hq/workspaces/manager/memory/2026-02-11.md deleted file mode 100644 index ba28cd7f..00000000 --- a/hq/workspaces/manager/memory/2026-02-11.md +++ /dev/null @@ -1,29 +0,0 @@ -# 2026-02-11 - -## Channel Config -- Added #research-and-development (C0AEB39CE5U) to Slack config -- All 6 agents bound to it -- Set `requireMention: false` globally for all Slack channels per Antoine's request - -## NXOpen MCP Server — INSTALLED ✅ -- **Repo**: `http://100.80.199.40:3000/Antoine/NXOpen-MCP.git` -- **Local path**: `/home/papa/atomizer/tools/nxopen-mcp/` -- **Venv**: `.venv/` with CPU-only torch (no CUDA needed) -- **Data**: 203MB pre-indexed ChromaDB + JSON caches - - 15,219 NXOpen classes, 64,320 methods - - 149 nxopentse functions - - 287 pyNastran classes -- **Run**: `./run-server.sh` or `python -m nxopen_mcp.server --data-dir ./data` -- **Protocol**: stdio-based MCP -- **Tools**: search_nxopen, get_class_info, get_method_info, get_examples, list_namespaces -- Wired into NX Expert agent via exec/Python subprocess - -## NX Expert Agent — HIRED ✅ -- **Agent ID**: `nx-expert` -- **Model**: Sonnet 4 (cost-effective specialist) -- **Workspace**: `/home/papa/atomizer/workspaces/nx-expert/` -- **Channels**: #hq (C0AEJV13TEU), #research-and-development (C0AEB39CE5U) -- **Mention patterns**: @nx-expert, @NX Expert, @nx, 🖥️ -- **Tools**: NXOpen MCP via Python exec, atomizer-protocols skill -- **Role**: NX Open API expert, solver config, element selection, journal scripting -- First Phase 2 agent to come online — ahead of schedule diff --git a/hq/workspaces/manager/memory/2026-02-13.md b/hq/workspaces/manager/memory/2026-02-13.md deleted file mode 100644 index 28b67999..00000000 --- a/hq/workspaces/manager/memory/2026-02-13.md +++ /dev/null @@ -1,41 +0,0 @@ -# 2026-02-13 - -## Nightly Digestion Cron — LIVE ✅ -- **Job ID:** `e157faf0-084f-4d8d-8693-814cf4340a48` -- **Schedule:** Every night at 4:00 AM ET (`0 4 * * *` America/Toronto) -- **Type:** Isolated agentTurn (manager), announces to #all-atomizer-hq -- **Protocol:** OP_11 full 6-step cycle (STORE → DISCARD → SORT → REPAIR → EVOLVE → SELF-DOCUMENT) -- Set up per Antoine's directive to officialize nightly memory processing - -## Hydrotech Beam — Resumed -- Antoine approved continuing to next phase (~01:36 UTC) -- DOE Phase 1 (51 trials) completed previously but **gate check FAILED**: - - 39/51 solved, 12 geo-infeasible (hole overlap) - - **0 fully feasible designs** — displacement ≤10mm never achieved (min ~19.6mm) - - **Mass = NaN** on all trials — extraction bug in journal/script - - Stress constraint (≤130 MPa) met by some trials but displacement kills everything -- **Delegated to Tech Lead:** Diagnose mass NaN, analyze DOE landscape, recommend feasibility fix - - Spawned sub-agent session: `hydrotech-doe-analysis` -- **Pending CEO decision:** Relax 10mm displacement constraint? Options presented: relax to ~20mm, expand DVs, or keep and find boundary -- Optimizer + Study Builder on standby for Phase 2 (TPE) after fixes - -## Mass NaN Fix — COMMITTED ✅ -- **Commit:** `580ed65` on Atomizer repo main branch -- **Root cause:** `solve_simulation.py` journal's `solve_simple_workflow()` tried to read mass via expression `p173` after part switching (geom→FEM→SIM→solve→back). Expression was stale/inaccessible after switching. `_temp_mass.txt` never written. -- **NOT** the `M1_Blank` hardcoding (that's assembly workflow only). Beam uses `solve_simple_workflow` (no `.afm`). -- **Fix (2 edits):** - 1. Extract mass RIGHT AFTER geometry rebuild (`DoUpdate()`) while geom part is work part — uses `MeasureManager.NewMassProperties()` (computes fresh from solid bodies) - 2. Post-solve: skip re-extraction if already done; fallback to MeasureManager instead of p173 -- **NX Expert** did the fix but did NOT use MCP server — was a code-level debug task, not API discovery -- **NX Expert Slack issue:** sub-agent couldn't post to #all-atomizer-hq (channel ID routing problem for spawned agents) -- **Next:** Pull on dalidou, test single trial, then re-run full DOE with 20mm constraint - -## Sub-agent Issues -- Tech Lead sub-agents both hit 200K token context limit and aborted (`abortedLastRun: true`) -- Had to do diagnosis myself then delegate to NX Expert -- NX Expert also couldn't post to Slack (channel_not_found with various target formats) -- **Lesson:** Sub-agents need leaner prompts, and Slack channel routing needs fixing for spawned sessions - -## DEC-HB-012 — Displacement Constraint Relaxed -- 10mm → 20mm, CEO approved (dummy case, pipeline proving) -- Updated CONTEXT.md and DECISIONS.md in project folder diff --git a/hq/workspaces/manager/memory/2026-03-20.md b/hq/workspaces/manager/memory/2026-03-20.md new file mode 100644 index 00000000..ee154ef4 --- /dev/null +++ b/hq/workspaces/manager/memory/2026-03-20.md @@ -0,0 +1,41 @@ +# 2026-03-20 + +## Nightly Digestion — OP_11 (Incremental/Weekly) + +**Note:** 8-day gap since last digestion (Mar 12). No nightly logs exist for Mar 13–19 — likely cron delivery issue or gateway downtime during that period. + +### STORE +- **NEW PROJECT DISCOVERED:** GigaBIT M1 — Reference Frame Stiffness Characterization (P04-GigaBIT-M1). Client: StarSpec (Adyn Miles). Active since Mar 4. Antoine working directly on this. Hybrid B+D method, SOL 101, ~42 runs. ΔWFE ≤1.0 nm RMS budget. +- **Zernike V&V COMPLETE:** P-Zernike-Validation finished Mar 9. 18 test cases, prysm cross-validation to machine precision. Risk reduction for M2/M3 ordering. Commits `f9373be`, `075ad36`. +- **Tier 2 dev workflow:** Windows test runner + Syncthing result sync added Mar 7 (commit `b3162aa`). +- Updated MEMORY.md with new projects and reprioritized project list. +- Updated PROJECT_STATUS.md (was stale since Mar 3 — now current). + +### DISCARD +- **Archived** `2026-02-11.md` and `2026-02-13.md` (37+ days old). Key facts preserved in archive summaries. +- **Compressed 15 idle-only daily logs** (Feb 26 – Mar 12) into single archive summary (`archive/2026-02-26_to_2026-03-12_idle-period.md`). These contained only digestion-cycle boilerplate with zero substantive activity. Originals retained (not yet 30 days) but archive summary created for when they age out. +- Feb 19 hits 30-day threshold tomorrow — queued for next cycle. + +### SORT +- GigaBIT M1 promoted to top of Active Projects in MEMORY.md (it's where Antoine is spending time). +- Hydrotech Beam deprioritized with note that Antoine is focused on GigaBIT now. +- Zernike V&V logged as completed project with cross-references. + +### REPAIR +- **All 12 key infrastructure paths verified** ✓ (taskboard, mc-update, CLUSTER, AGENTS_REGISTRY, orchestrate tools, MCP server, protocols) +- **All 7 agent workspaces present** ✓ +- **Mission Control dashboard** responding (HTTP 200) ✓ +- **PROJECT_STATUS.md was 17 days stale** (last updated Mar 3) — now updated with GigaBIT M1 and current state. +- **7 Mission Control tasks stuck** in `in_progress` or `review` since mid-February — flagged for cleanup when Antoine returns to HQ work. +- **Gap identified:** Mar 13–19 digestion logs missing. Cron job may have had delivery issues or gateway was down. No data loss — just missing the nightly check-ins. + +### EVOLVE +- **Standing OP_11 amendment proposal** (since Mar 8, now 12 days): idle-mode rule for weekly-only digestion when no workspace changes for 7+ days. Requires CEO approval. +- **Observation:** Antoine is doing significant direct work (GigaBIT M1, Zernike V&V, dev workflow) without HQ agent involvement. The team may need to be more proactive about supporting active client work vs. waiting to be tasked. +- **Recommendation:** When Antoine next engages HQ, offer GigaBIT M1 support (Tech Lead for sensitivity analysis, Optimizer for stiffness sweep design, Webster for literature on mirror mount compliance requirements). + +### SELF-DOCUMENT +- MEMORY.md updated with GigaBIT M1 project, Zernike V&V completion, and reprioritized project list. +- PROJECT_STATUS.md fully refreshed (was 17 days stale). +- No changes needed to SOUL.md, IDENTITY.md, or TOOLS.md — all still accurate. +- Agent workspace docs (other agents) not checked this cycle — no activity detected in their workspaces. diff --git a/hq/workspaces/manager/memory/archive/2026-02-11.md b/hq/workspaces/manager/memory/archive/2026-02-11.md new file mode 100644 index 00000000..58be3fb9 --- /dev/null +++ b/hq/workspaces/manager/memory/archive/2026-02-11.md @@ -0,0 +1,18 @@ +# Archive Summary — 2026-02-11 + +## Key Events +- Added `#research-and-development` channel (C0AEB39CE5U) to Slack config; all 6 agents bound +- Set `requireMention: false` globally for all Slack channels per Antoine's request + +## NXOpen MCP Server — INSTALLED +- **Repo**: `http://100.80.199.40:3000/Antoine/NXOpen-MCP.git` +- **Local path**: `/home/papa/atomizer/tools/nxopen-mcp/` +- **Data**: 203MB pre-indexed ChromaDB + JSON caches (15,219 NXOpen classes, 64,320 methods, 149 nxopentse functions, 287 pyNastran classes) +- **Run**: `./run-server.sh` +- **Protocol**: stdio-based MCP +- Wired into NX Expert agent via exec/Python subprocess + +## NX Expert Agent — HIRED +- **Agent ID**: `nx-expert` | **Model**: Sonnet 4 +- **Workspace**: `/home/papa/atomizer/workspaces/nx-expert/` +- First Phase 2 agent — ahead of schedule diff --git a/hq/workspaces/manager/memory/archive/2026-02-13.md b/hq/workspaces/manager/memory/archive/2026-02-13.md new file mode 100644 index 00000000..81fe4738 --- /dev/null +++ b/hq/workspaces/manager/memory/archive/2026-02-13.md @@ -0,0 +1,9 @@ +# Archive Summary — 2026-02-13 + +## Key Events +- **Nightly Digestion Cron LIVE** — Job `e157faf0`, 4:00 AM ET daily, isolated agentTurn (manager), announces to #all-atomizer-hq +- **Hydrotech Beam resumed** — Antoine approved Phase 2. DOE Phase 1 gate check failed: 39/51 solved, 0 fully feasible, mass=NaN on all trials +- **Mass NaN Fix committed** — `580ed65`. Root cause: `solve_simple_workflow()` tried reading mass via stale `p173` expression after part switching. Fix: extract mass right after geometry rebuild using `MeasureManager.NewMassProperties()` +- **DEC-HB-012** — Displacement constraint relaxed 10→20mm (CEO approved, dummy case) +- Sub-agent issues: Tech Lead hit 200K token limit (×2), NX Expert couldn't post to Slack (channel routing issue for spawned agents) +- **Lesson:** Sub-agents need leaner prompts; Slack channel routing broken for spawned sessions diff --git a/hq/workspaces/manager/memory/archive/2026-02-26_to_2026-03-12_idle-period.md b/hq/workspaces/manager/memory/archive/2026-02-26_to_2026-03-12_idle-period.md new file mode 100644 index 00000000..6c028e58 --- /dev/null +++ b/hq/workspaces/manager/memory/archive/2026-02-26_to_2026-03-12_idle-period.md @@ -0,0 +1,19 @@ +# Archive Summary — Idle Period: 2026-02-26 to 2026-03-12 + +**15 consecutive nightly digestion cycles with zero workspace activity.** + +All workspaces (manager, secretary, technical-lead, optimizer, study-builder, auditor, webster) had zero file changes throughout this period. Each nightly OP_11 cycle confirmed the same state. + +## Actions Taken During Period +- **Mar 8**: Archived `2026-02-08.md` and `2026-02-09.md` (30+ days old) +- **Mar 12**: Archived `2026-02-10.md` (30 days old) +- Path verifications performed nightly — all OK throughout + +## Standing State (unchanged from Feb 25) +- 3 projects awaiting CEO input: Hydrotech (blocked on dalidou pull), Project Standard (MVS vs full spec decision), Isogrid (CEO review) +- Webster blocked on web_search API key (needs Mario) +- Auditor Isogrid review moot until CEO reviews spec + +## EVOLVE Recommendation (first raised Mar 8) +- **OP_11 idle-mode amendment proposed**: When no workspace file changes for >7 consecutive days, switch digestion to weekly-only. Resume nightly when activity resumes. 15 consecutive near-identical cycles confirm this need. +- Requires CEO approval per protocol change rules. diff --git a/hq/workspaces/shared/PROJECT_STATUS.md b/hq/workspaces/shared/PROJECT_STATUS.md index 3539de90..4e272c1f 100644 --- a/hq/workspaces/shared/PROJECT_STATUS.md +++ b/hq/workspaces/shared/PROJECT_STATUS.md @@ -1,26 +1,33 @@ # Project Status Dashboard -Updated: 2026-03-03 04:00 AM (Nightly Digestion OP_11) +Updated: 2026-03-20 04:00 AM (Nightly Digestion OP_11) ## Active Projects -### 📦 Atomizer V2 Migration -- **Phase:** ✅ COMPLETE (2026-02-23) -- **What happened:** 8 commits pushed to Gitea. 218+ Python files, 58 tests passing. All phases done: repo bootstrap, core engine port, integration testing, reference implementation, CLAUDE.md, Data Contracts (5 dataclasses), Pipeline-NX integration tests. Dalidou validated: `import atomizer` v2.0.0 + 24/24 tests on Windows. -- **Post-migration:** Coherence audit delivered (conditional pass, 3 critical findings fixed in preflight). V1 tagged `v1-final`, kept active for current optimizations. AOM→Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work. -- **Remaining roadmap:** Items 4-9 in ROADMAP-NEXT.md (docs/dev/) -- **Location:** `192.168.86.50:3000/Antoine/Atomizer-V2`, Obsidian vault `P-Atomizer-Operating-Manual/` -- **Owner:** Manager +### 🔭 GigaBIT M1 — Reference Frame Stiffness Characterization +- **Phase:** Active — Model Setup +- **Client:** StarSpec (Adyn Miles) +- **Project ID:** P04-GigaBIT-M1 +- **Created:** 2026-03-04 +- **Objective:** Determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points. Quantify WFE sensitivity to frame compliance. +- **Method:** Hybrid B+D (sensitivity + stiffness sweep), SOL 101, ~42 runs total +- **Key numbers:** ΔWFE budget ≤1.0 nm RMS, system allocation ≤22 nm RMS (contract), mechanical target <14 nm RMS +- **Location:** `repos/Atomizer/projects/gigabit-m1-frame-stiffness/` +- **PKM:** `obsidian-vault/2-Projects/P04-GigaBIT-M1/` +- **Owner:** Antoine (direct) -### 🏢 Atomizer/HQ Separation -- **Phase:** ✅ COMPLETE (2026-02-23) -- **Decision:** DEC-037 — Atomizer = product (V2 repo), HQ = AI operations team (HQ repo). AOM governs the product. 7 AOM docs updated. HQ repo pushed to Gitea (218 files). -- **Owner:** Manager +### ✅ P-Zernike-Validation (GigaBIT M1 Risk Reduction) +- **Phase:** ✅ COMPLETE (2026-03-09) +- **What:** Zernike pipeline V&V — 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm) +- **Commits:** `f9373be` (round-trip validation), `075ad36` (prysm cross-validation + report figures) +- **Requested by:** Adyn Miles (StarSpec) for risk reduction before M2/M3 ordering +- **Owner:** Antoine (direct) ### 🔩 Hydrotech Beam — Optimization - **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE) - **Status:** ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou - **Key numbers:** 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm - **Next:** Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE +- **Note:** Lower priority — Antoine focused on GigaBIT M1 work - **Owner:** Tech Lead + Study Builder ### 📐 Atomizer Project Standard @@ -39,19 +46,27 @@ Updated: 2026-03-03 04:00 AM (Nightly Digestion OP_11) - **Next:** CEO review → implementation planning - **Owner:** Manager / Tech Lead -### 🔬 Material Research (M2 Mirror Trade Study) -- **Phase:** Research complete -- **Status:** ✅ Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC) -- **Next:** Awaiting project context to produce recommendation -- **Owner:** Webster +### 📦 Atomizer V2 Migration +- **Phase:** ✅ COMPLETE (2026-02-23) +- **Post-migration:** V1 tagged `v1-final`, kept active. AOM→Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work. +- **Remaining roadmap:** Items 4-9 in ROADMAP-NEXT.md + +### 🏢 Atomizer/HQ Separation +- **Phase:** ✅ COMPLETE (2026-02-23) +- **Decision:** DEC-037 + +## Infrastructure Updates +- **Tier 2 dev workflow** added (2026-03-07, commit `b3162aa`): Windows test runner (`run_tests.bat`), result sync via Syncthing, JSON result capture, `--quick` mode for NX-independent tests +- **Daily HQ syncs** continue (automated commits through Mar 12) ## Outstanding Blockers -- **Auditor** blocked on P-Adaptive-Isogrid review since Feb 16 (11 days — chronic, moot until CEO reviews Isogrid; closing next active session) -- **Webster** web_search API key missing (needs Mario, since Feb 19 — 8 days) -- **3 projects** simultaneously awaiting CEO input — triage needed when Antoine returns +- **3 projects** awaiting CEO input (Hydrotech, Project Standard, Isogrid) — deprioritized while Antoine focuses on GigaBIT M1 +- **Webster** web_search API key still missing (needs Mario, since Feb 19) -## Recent Activity -- 2026-02-24: **Arsenal Development Plan** — Tech Lead produced dev blueprint (multi-solver expansion, 6-sprint roadmap). Auditor delivered risk analysis + quality gates (flagged 5 simultaneous problem streams, recommended phased de-risking). Good team output. -- 2026-02-23: V2 Migration COMPLETE (8 commits, 218+ files, 58 tests). HQ Separation COMPLETE (DEC-037). Coherence audit + preflight fixes delivered. -- 2026-02-22: AOM 100% complete (48 docs), tool-agnostic architecture -- 2026-02-18: Project standardization package assembled and reviewed +## Mission Control — Stale Tasks +Several MC tasks have been in `in_progress` or `review` since mid-February with no updates: +- ATZ-2f1634: P-Adaptive-Isogrid (in_progress) +- ATZ-74f02a: Atomizer Overhaul (in_progress) +- ATZ-839392: Project Standard — Introspection (in_progress) +- ATZ-749aac, ATZ-d3fce9, ATZ-05c017, ATZ-21695d: all in review +These should be resolved (completed or closed) when Antoine returns to HQ work.