auto: daily sync
This commit is contained in:
@@ -143,19 +143,27 @@ Minimize beam mass while meeting displacement and stress constraints. Single-obj
|
|||||||
- 2026-02-11: NX version fixed (DesigncenterNX 2512), path resolution bugs fixed, iteration architecture finalized (backup/restore in-place), history DB added. First real solve results.
|
- 2026-02-11: NX version fixed (DesigncenterNX 2512), path resolution bugs fixed, iteration architecture finalized (backup/restore in-place), history DB added. First real solve results.
|
||||||
|
|
||||||
## Status
|
## Status
|
||||||
Phase: **DOE execution** — solver pipeline operational, first results obtained
|
Phase: **DOE re-run** — mass bug fixed, constraint relaxed, ready for clean DOE
|
||||||
Generation: 003
|
Generation: 004
|
||||||
Channel: #project-hydrotech-beam
|
Channel: #project-hydrotech-beam
|
||||||
Last update: 2026-02-11
|
Last update: 2026-02-13
|
||||||
|
|
||||||
### Solver Pipeline Status
|
### Solver Pipeline Status
|
||||||
- ✅ NX journal solve working (DesigncenterNX 2512)
|
- ✅ NX journal solve working (DesigncenterNX 2512)
|
||||||
- ✅ Mass extraction via `p173` expression
|
- ✅ Mass extraction fixed — commit `580ed65` (MeasureManager after geometry rebuild, no more stale p173)
|
||||||
- ✅ Displacement & stress extraction via pyNastran OP2 parsing
|
- ✅ Displacement & stress extraction via pyNastran OP2 parsing
|
||||||
- ✅ Iteration archival (params, results, OP2, F06)
|
- ✅ Iteration archival (params, results, OP2, F06)
|
||||||
- ✅ History DB (SQLite + CSV, append-only, survives --clean)
|
- ✅ History DB (SQLite + CSV, append-only, survives --clean)
|
||||||
- ✅ Geometric pre-checks (hole overlap, web clearance)
|
- ✅ Geometric pre-checks (hole overlap, web clearance)
|
||||||
- 🔄 Full 51-trial DOE run pending
|
- ✅ Displacement constraint relaxed: 10mm → 20mm (DEC-HB-012)
|
||||||
|
- 🔄 Pull fix on dalidou → test single trial → re-run full DOE
|
||||||
|
|
||||||
|
### DOE Phase 1 Results (pre-fix, 51 trials)
|
||||||
|
- 39/51 solved, 12 geo-infeasible (hole overlap)
|
||||||
|
- **0 fully feasible** at 10mm constraint (min displacement ~19.6mm)
|
||||||
|
- **Mass = NaN on all trials** — extraction bug (now fixed)
|
||||||
|
- Stress constraint met by several trials
|
||||||
|
- With 20mm relaxation, many trials should now be feasible
|
||||||
|
|
||||||
### Development Workflow
|
### Development Workflow
|
||||||
- **Git only** for development (git push/pull between server and dalidou)
|
- **Git only** for development (git push/pull between server and dalidou)
|
||||||
|
|||||||
Reference in New Issue
Block a user