chore(hq): daily sync 2026-02-20
This commit is contained in:
@@ -173,6 +173,7 @@ If you improve a skill, push changes back:
|
||||
| ⚡ Optimizer | optimizer | #all-atomizer-hq (mention) | Algorithm specialist, strategy design |
|
||||
| 🏗️ Study Builder | study-builder | #all-atomizer-hq (mention) | Study code engineer, implementation |
|
||||
| 🔍 Auditor | auditor | #all-atomizer-hq (mention) | Quality gatekeeper, reviews |
|
||||
| 🌐 Webster | webster | #all-atomizer-hq (mention) | Web research, data gathering |
|
||||
|
||||
### Shared Channel
|
||||
- **#all-atomizer-hq** — All agents respond here when @mentioned or emoji-tagged
|
||||
|
||||
@@ -25,8 +25,9 @@ All Atomizer HQ planning docs are in `context-docs/`:
|
||||
Read these on first session to fully understand the vision and architecture.
|
||||
|
||||
## Active Projects
|
||||
- **Hydrotech Beam** — Channel: `#project-hydrotech-beam` | Phase: DOE Phase 1 complete (39/51 solved, mass NaN fixed via commit 580ed65, displacement constraint relaxed 10→20mm). Next: pull fix on dalidou, rerun DOE.
|
||||
- **Atomizer Project Standard** — PKM: `2-Projects/P-Atomizer-Project-Standard/` | Phase: Specification complete (2026-02-18), awaiting CEO review. Deliverable: `00-SPECIFICATION.md` (~57KB). Defines standardized folder structure, KB architecture, study lifecycle, naming conventions. Key decisions: numbered folders, unified KB, `PROJECT.md` + `AGENT.md` entry points, append-only `DECISIONS.md`. Next: Antoine review → iterate → build template → pilot on Hydrotech.
|
||||
- **Hydrotech Beam** — Channel: `#project-hydrotech-beam` | Phase: DOE Phase 1 complete (39/51 solved, mass NaN fixed via commit 580ed65, displacement constraint relaxed 10→20mm). Next: pull fix on dalidou, rerun DOE. **Blocked on Antoine running updated code on dalidou.**
|
||||
- **Adaptive Isogrid Plate Lightweighting** — Channel: war-room-isogrid | Phase: Technical spec locked + reviews complete. Full spec (32KB) + optimizer/tech-lead/webster reviews in `shared/war-room-isogrid/`. Architecture: "Python Brain + NX Hands + Atomizer Manager". Next: CEO review → implementation planning.
|
||||
- **Atomizer Project Standard** — Phase: Full review package delivered (2026-02-18). Spec (~57KB), tech-lead review, auditor audit, secretary synthesis all complete. Files in `shared/standardization/`. **Auditor verdict: spec is over-engineered — recommends Minimum Viable Standard (MVS) based on Hydrotech Beam's existing structure.** Awaiting CEO decision: adopt full spec vs MVS approach. Next: Antoine review → decision → implementation.
|
||||
|
||||
## Core Protocols
|
||||
- **OP_11 — Digestion Protocol** (CEO-approved 2026-02-11): STORE → DISCARD → SORT → REPAIR → EVOLVE → SELF-DOCUMENT. Runs at phase completion, weekly heartbeat, and project close. Antoine's corrections are ground truth.
|
||||
@@ -39,3 +40,6 @@ Read these on first session to fully understand the vision and architecture.
|
||||
- Existing `optimization_engine` should be wrapped, not reinvented
|
||||
- Sub-agents hit 200K token limits easily — keep prompts lean, scope narrow
|
||||
- Spawned sub-agents can't post to Slack channels (channel routing issue) — do Slack posting from main agent
|
||||
- Secretary also hit Slack posting issues (missing bot token in spawned context) — always post final deliverables from main agent
|
||||
- Auditor produces high-value "reality check" reviews — always include in spec/design work
|
||||
- Taskboard CLI (`mc-update.sh`) works but only supports basic commands (status/comment/add/complete/start) — no `list` view
|
||||
|
||||
36
hq/workspaces/manager/memory/2026-02-19.md
Normal file
36
hq/workspaces/manager/memory/2026-02-19.md
Normal file
@@ -0,0 +1,36 @@
|
||||
# 2026-02-19
|
||||
|
||||
## Nightly Digestion — OP_11 (Incremental)
|
||||
|
||||
### STORE
|
||||
- Updated MEMORY.md: Project Standard status now reflects full review package + auditor MVS recommendation
|
||||
- Updated MEMORY.md: Added lessons about Secretary Slack issues and Auditor value
|
||||
- Updated PROJECT_STATUS.md with current state of all 3 active projects
|
||||
- Captured: Hydrotech still blocked on dalidou pull, Project Standard awaiting CEO decision
|
||||
|
||||
### DISCARD
|
||||
- No memory files older than 30 days (oldest is Feb 8 = 11 days)
|
||||
- No contradictions found in MEMORY.md
|
||||
- No stale TODOs identified — both active projects are genuinely waiting on Antoine
|
||||
|
||||
### SORT
|
||||
- Project Standard insight promoted: "Auditor recommends MVS over full spec" → MEMORY.md (was only in project_log.md)
|
||||
- "Sub-agents can't post to Slack" lesson confirmed still relevant (Secretary hit same issue Feb 19)
|
||||
|
||||
### REPAIR
|
||||
- Fixed: Webster missing from AGENTS.md Agent Directory table (was only in specialists list)
|
||||
- Verified: All 7 agent SOUL.md files present and populated
|
||||
- Verified: All HEARTBEAT.md files current (Feb 19)
|
||||
- Verified: No broken file paths in MEMORY.md
|
||||
- PROJECT_STATUS.md was stale (last updated Feb 15, only had material research) — fully rewritten
|
||||
- Noted: Auditor blocked on P-Adaptive-Isogrid review since Feb 16 — Tech Lead hasn't responded
|
||||
|
||||
### EVOLVE
|
||||
- Observation: Project Standard orchestration worked well (multi-agent: tech-lead + auditor + webster + secretary) — the taskboard protocol is maturing
|
||||
- Issue: Secretary and sub-agents still can't post to Slack reliably — this is a recurring infrastructure gap. Should investigate gateway config fix.
|
||||
- mc-update.sh `list` command doesn't work — limits dashboard utility
|
||||
|
||||
### SELF-DOCUMENT
|
||||
- AGENTS.md: Added Webster to Active Team table
|
||||
- PROJECT_STATUS.md: Full rewrite with current state
|
||||
- MEMORY.md: Updated active projects section
|
||||
32
hq/workspaces/manager/memory/2026-02-20.md
Normal file
32
hq/workspaces/manager/memory/2026-02-20.md
Normal file
@@ -0,0 +1,32 @@
|
||||
# 2026-02-20
|
||||
|
||||
## Nightly Digestion — OP_11 (Incremental)
|
||||
|
||||
### STORE
|
||||
- New project discovered: **Adaptive Isogrid Plate Lightweighting** — full technical spec + 3 reviews (optimizer, tech-lead, webster) in `shared/war-room-isogrid/`. Created Feb 19 evening.
|
||||
- Webster hit web_search API key issue (TASK-001 blocked) — infrastructure gap noted
|
||||
- No new Antoine corrections to capture
|
||||
|
||||
### DISCARD
|
||||
- No memory files older than 30 days (oldest Feb 8 = 12 days)
|
||||
- No contradictions found
|
||||
- No stale TODOs — projects still genuinely waiting on Antoine
|
||||
|
||||
### SORT
|
||||
- Adaptive Isogrid project added to MEMORY.md and PROJECT_STATUS.md as new active project
|
||||
- P-Adaptive-Isogrid auditor block (since Feb 16) may now be resolvable — spec + reviews exist in war-room
|
||||
|
||||
### REPAIR
|
||||
- PROJECT_STATUS.md updated to include Adaptive Isogrid project
|
||||
- MEMORY.md updated with new project entry
|
||||
- Noted: Webster web_search API key issue needs infrastructure fix (escalate to Mario)
|
||||
- Verified: All agent workspaces intact, no broken paths
|
||||
|
||||
### EVOLVE
|
||||
- Low activity day — no process issues observed
|
||||
- Webster API key issue is a capability gap — should be escalated
|
||||
|
||||
### SELF-DOCUMENT
|
||||
- MEMORY.md: Added Adaptive Isogrid project
|
||||
- PROJECT_STATUS.md: Added Adaptive Isogrid entry
|
||||
- This daily note created
|
||||
Reference in New Issue
Block a user