chore(hq): daily sync 2026-02-20
This commit is contained in:
@@ -25,8 +25,9 @@ All Atomizer HQ planning docs are in `context-docs/`:
|
||||
Read these on first session to fully understand the vision and architecture.
|
||||
|
||||
## Active Projects
|
||||
- **Hydrotech Beam** — Channel: `#project-hydrotech-beam` | Phase: DOE Phase 1 complete (39/51 solved, mass NaN fixed via commit 580ed65, displacement constraint relaxed 10→20mm). Next: pull fix on dalidou, rerun DOE.
|
||||
- **Atomizer Project Standard** — PKM: `2-Projects/P-Atomizer-Project-Standard/` | Phase: Specification complete (2026-02-18), awaiting CEO review. Deliverable: `00-SPECIFICATION.md` (~57KB). Defines standardized folder structure, KB architecture, study lifecycle, naming conventions. Key decisions: numbered folders, unified KB, `PROJECT.md` + `AGENT.md` entry points, append-only `DECISIONS.md`. Next: Antoine review → iterate → build template → pilot on Hydrotech.
|
||||
- **Hydrotech Beam** — Channel: `#project-hydrotech-beam` | Phase: DOE Phase 1 complete (39/51 solved, mass NaN fixed via commit 580ed65, displacement constraint relaxed 10→20mm). Next: pull fix on dalidou, rerun DOE. **Blocked on Antoine running updated code on dalidou.**
|
||||
- **Adaptive Isogrid Plate Lightweighting** — Channel: war-room-isogrid | Phase: Technical spec locked + reviews complete. Full spec (32KB) + optimizer/tech-lead/webster reviews in `shared/war-room-isogrid/`. Architecture: "Python Brain + NX Hands + Atomizer Manager". Next: CEO review → implementation planning.
|
||||
- **Atomizer Project Standard** — Phase: Full review package delivered (2026-02-18). Spec (~57KB), tech-lead review, auditor audit, secretary synthesis all complete. Files in `shared/standardization/`. **Auditor verdict: spec is over-engineered — recommends Minimum Viable Standard (MVS) based on Hydrotech Beam's existing structure.** Awaiting CEO decision: adopt full spec vs MVS approach. Next: Antoine review → decision → implementation.
|
||||
|
||||
## Core Protocols
|
||||
- **OP_11 — Digestion Protocol** (CEO-approved 2026-02-11): STORE → DISCARD → SORT → REPAIR → EVOLVE → SELF-DOCUMENT. Runs at phase completion, weekly heartbeat, and project close. Antoine's corrections are ground truth.
|
||||
@@ -39,3 +40,6 @@ Read these on first session to fully understand the vision and architecture.
|
||||
- Existing `optimization_engine` should be wrapped, not reinvented
|
||||
- Sub-agents hit 200K token limits easily — keep prompts lean, scope narrow
|
||||
- Spawned sub-agents can't post to Slack channels (channel routing issue) — do Slack posting from main agent
|
||||
- Secretary also hit Slack posting issues (missing bot token in spawned context) — always post final deliverables from main agent
|
||||
- Auditor produces high-value "reality check" reviews — always include in spec/design work
|
||||
- Taskboard CLI (`mc-update.sh`) works but only supports basic commands (status/comment/add/complete/start) — no `list` view
|
||||
|
||||
Reference in New Issue
Block a user