auto: daily sync

This commit is contained in:
2026-02-15 08:00:21 +00:00
parent 6218355dbf
commit d6a1d6eee1
376 changed files with 12864 additions and 5377 deletions

View File

@@ -1,22 +1,22 @@
# Knowledge Base History — Hydrotech Beam
All modifications tracked by generation.
---
## Gen 001 — 2026-02-09 — Initial KB
**Source:** Project intake (CONTEXT.md) + Technical Lead breakdown (BREAKDOWN.md)
**Author:** Manager 🎯
**Created:**
- `components/sandwich-beam.md` — initial component file from intake data
- `materials/steel-aisi.md` — material placeholder
- `fea/models/sol101-static.md` — FEA model placeholder from breakdown
- `dev/gen-001.md` — generation document
**Key findings from breakdown:**
- Baseline FAILS displacement constraint (22 mm vs 10 mm limit)
- Feasible region may be narrow — stiffness and mass compete
- Sandwich effect (core thickness) is the primary stiffness lever
- 9 gaps identified requiring CEO input before proceeding
# Knowledge Base History — Hydrotech Beam
All modifications tracked by generation.
---
## Gen 001 — 2026-02-09 — Initial KB
**Source:** Project intake (CONTEXT.md) + Technical Lead breakdown (BREAKDOWN.md)
**Author:** Manager 🎯
**Created:**
- `components/sandwich-beam.md` — initial component file from intake data
- `materials/steel-aisi.md` — material placeholder
- `fea/models/sol101-static.md` — FEA model placeholder from breakdown
- `dev/gen-001.md` — generation document
**Key findings from breakdown:**
- Baseline FAILS displacement constraint (22 mm vs 10 mm limit)
- Feasible region may be narrow — stiffness and mass compete
- Sandwich effect (core thickness) is the primary stiffness lever
- 9 gaps identified requiring CEO input before proceeding