chore(hq): daily sync 2026-03-26

This commit is contained in:
2026-03-26 09:00:36 +00:00
parent 4d09ce2a2e
commit fcc716db95
13 changed files with 174 additions and 98 deletions

View File

@@ -21,7 +21,7 @@
name: "Manager", name: "Manager",
workspace: "/home/papa/atomizer/workspaces/manager", workspace: "/home/papa/atomizer/workspaces/manager",
identity: { name: "Atomizer Manager", emoji: "🎯" }, identity: { name: "Atomizer Manager", emoji: "🎯" },
model: "anthropic/claude-opus-4-6", model: "openai-codex/gpt-5.4",
groupChat: { mentionPatterns: ["@manager", "@Manager", "🎯"] }, groupChat: { mentionPatterns: ["@manager", "@Manager", "🎯"] },
subagents: { allowAgents: ["*"] } subagents: { allowAgents: ["*"] }
}, },

View File

@@ -27,7 +27,9 @@ Read these on first session to fully understand the vision and architecture.
## Active Projects ## Active Projects
- **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `obsidian-vault/2-Projects/P04-GigaBIT-M1/`. - **GigaBIT M1 — Reference Frame Stiffness** — Client: StarSpec (Adyn Miles). P04-GigaBIT-M1. Active since 2026-03-04. Objective: determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points (WFE sensitivity). Hybrid B+D method, SOL 101, ~42 runs. ΔWFE budget ≤1.0 nm RMS. Project folder: `repos/Atomizer/projects/gigabit-m1-frame-stiffness/`. PKM: `obsidian-vault/2-Projects/P04-GigaBIT-M1/`.
- **P-Zernike-Validation** — V&V complete (2026-03-09). Zernike pipeline validated: 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm). Requested by Adyn Miles for risk reduction before M2/M3 ordering. Commits: `f9373be`, `075ad36`. - **P-Zernike-Validation** — V&V complete (2026-03-09). Zernike pipeline validated: 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm). Requested by Adyn Miles for risk reduction before M2/M3 ordering. Commits: `f9373be`, `075ad36`.
- **Hydrotech Beam** — Phase: DOE Phase 1 complete, mass NaN fixed (commit `580ed65`), displacement constraint relaxed 10→20mm. **Blocked on Antoine pulling fix on dalidou.** Lower priority — Antoine focused on GigaBIT M1 now. - **Polisher-Fullum-Overhaul** — Client project (Normand/Cedric/Antoine). Goal: upgrade swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Active since 2026-02-02. Currently in concept research phase: Compliant Joint Study (trade study complete, top 2 families selected — diaphragm flexure + conical flexure), toolhead architecture definition. Active work as of Mar 21. PKM: `obsidian-vault/2-Projects/Polisher-Fullum-Overhaul/`. **Not managed by HQ agents — Antoine's direct work.**
- **Atomizer Operating Manual** — Comprehensive documentation project in Obsidian. 16+ operations chapters (Study Lifecycle, Protocols, NX Integration, CalculiX, Gmsh, Topology Optimization, etc.) + Knowledge section (LAC, Digestion, Failure Patterns). Active writing as of Mar 21. PKM: `obsidian-vault/2-Projects/P-Atomizer-Operating-Manual/`. **Antoine's direct work.**
- **Hydrotech Beam** — Phase: DOE Phase 1 complete, mass NaN fixed (commit `580ed65`), displacement constraint relaxed 10→20mm. **Blocked on Antoine pulling fix on dalidou.** Lower priority — Antoine focused on Polisher/GigaBIT now.
- **Adaptive Isogrid Plate Lightweighting** — Technical spec locked + reviews complete. Awaiting CEO review. - **Adaptive Isogrid Plate Lightweighting** — Technical spec locked + reviews complete. Awaiting CEO review.
- **Atomizer Project Standard** — Full review package delivered (2026-02-18). Awaiting CEO decision: full spec vs MVS approach. - **Atomizer Project Standard** — Full review package delivered (2026-02-18). Awaiting CEO decision: full spec vs MVS approach.
- **Atomizer V2 Migration** — ✅ COMPLETE (2026-02-23). V1 tagged `v1-final`, kept active. Phase 6 (archive V1) deferred. - **Atomizer V2 Migration** — ✅ COMPLETE (2026-02-23). V1 tagged `v1-final`, kept active. Phase 6 (archive V1) deferred.

View File

@@ -1,36 +0,0 @@
# 2026-02-19
## Nightly Digestion — OP_11 (Incremental)
### STORE
- Updated MEMORY.md: Project Standard status now reflects full review package + auditor MVS recommendation
- Updated MEMORY.md: Added lessons about Secretary Slack issues and Auditor value
- Updated PROJECT_STATUS.md with current state of all 3 active projects
- Captured: Hydrotech still blocked on dalidou pull, Project Standard awaiting CEO decision
### DISCARD
- No memory files older than 30 days (oldest is Feb 8 = 11 days)
- No contradictions found in MEMORY.md
- No stale TODOs identified — both active projects are genuinely waiting on Antoine
### SORT
- Project Standard insight promoted: "Auditor recommends MVS over full spec" → MEMORY.md (was only in project_log.md)
- "Sub-agents can't post to Slack" lesson confirmed still relevant (Secretary hit same issue Feb 19)
### REPAIR
- Fixed: Webster missing from AGENTS.md Agent Directory table (was only in specialists list)
- Verified: All 7 agent SOUL.md files present and populated
- Verified: All HEARTBEAT.md files current (Feb 19)
- Verified: No broken file paths in MEMORY.md
- PROJECT_STATUS.md was stale (last updated Feb 15, only had material research) — fully rewritten
- Noted: Auditor blocked on P-Adaptive-Isogrid review since Feb 16 — Tech Lead hasn't responded
### EVOLVE
- Observation: Project Standard orchestration worked well (multi-agent: tech-lead + auditor + webster + secretary) — the taskboard protocol is maturing
- Issue: Secretary and sub-agents still can't post to Slack reliably — this is a recurring infrastructure gap. Should investigate gateway config fix.
- mc-update.sh `list` command doesn't work — limits dashboard utility
### SELF-DOCUMENT
- AGENTS.md: Added Webster to Active Team table
- PROJECT_STATUS.md: Full rewrite with current state
- MEMORY.md: Updated active projects section

View File

@@ -1,32 +0,0 @@
# 2026-02-20
## Nightly Digestion — OP_11 (Incremental)
### STORE
- New project discovered: **Adaptive Isogrid Plate Lightweighting** — full technical spec + 3 reviews (optimizer, tech-lead, webster) in `shared/war-room-isogrid/`. Created Feb 19 evening.
- Webster hit web_search API key issue (TASK-001 blocked) — infrastructure gap noted
- No new Antoine corrections to capture
### DISCARD
- No memory files older than 30 days (oldest Feb 8 = 12 days)
- No contradictions found
- No stale TODOs — projects still genuinely waiting on Antoine
### SORT
- Adaptive Isogrid project added to MEMORY.md and PROJECT_STATUS.md as new active project
- P-Adaptive-Isogrid auditor block (since Feb 16) may now be resolvable — spec + reviews exist in war-room
### REPAIR
- PROJECT_STATUS.md updated to include Adaptive Isogrid project
- MEMORY.md updated with new project entry
- Noted: Webster web_search API key issue needs infrastructure fix (escalate to Mario)
- Verified: All agent workspaces intact, no broken paths
### EVOLVE
- Low activity day — no process issues observed
- Webster API key issue is a capability gap — should be escalated
### SELF-DOCUMENT
- MEMORY.md: Added Adaptive Isogrid project
- PROJECT_STATUS.md: Added Adaptive Isogrid entry
- This daily note created

View File

@@ -1,28 +0,0 @@
# 2026-02-21
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity since last digestion (Feb 20). All projects remain in same state.
- war-room-overhaul/repo-structure.md created Feb 20 — repo audit artifact for future overhaul work
### DISCARD
- No files older than 30 days (oldest: Feb 8 = 13 days)
- No contradictions found
- No stale TODOs
### SORT
- Nothing to promote — no new learnings
### REPAIR
- All key paths verified intact (standardization, war-room-isogrid, war-room-overhaul)
- PROJECT_STATUS.md still accurate — no state changes
- MEMORY.md still accurate
### EVOLVE
- No issues observed. Weekend quiet period.
- Outstanding: Webster web_search API key still unresolved (needs Mario)
- Outstanding: Auditor P-Adaptive-Isogrid block (since Feb 16) still unresolved — Tech Lead never responded
### SELF-DOCUMENT
- No changes needed — docs current from Feb 20 digestion

View File

@@ -0,0 +1,26 @@
# 2026-03-21
## Nightly Digestion — OP_11 (Incremental)
### STORE
- No new activity. Zero substantive file changes across all workspaces since Mar 20 digestion.
- Obsidian Operating Manual files touched at exactly 08:00:01 UTC — Syncthing sync artifact, not content changes.
### DISCARD
- **Feb 19** daily log hits 30-day threshold tomorrow (Mar 22) — queued for archive.
- Feb 2028 all still under 30 days. No archival needed today.
- No contradictions found.
### SORT
- Nothing to promote or reorganize.
### REPAIR
- All key infrastructure paths verified (spot check): taskboard.json ✓, mc-update.sh ✓, CLUSTER.md ✓, AGENTS_REGISTRY.json ✓
- No broken references in MEMORY.md.
- PROJECT_STATUS.md is current (updated Mar 20).
### EVOLVE
- **Standing OP_11 idle-mode amendment (Day 22):** No workspace changes for 22+ consecutive days (since Feb 28, excluding digestion entries). Nightly → weekly switch proposal still requires CEO approval.
### SELF-DOCUMENT
- No changes needed. All docs current as of Mar 20 digestion.

View File

@@ -0,0 +1,36 @@
# 2026-03-22
## Nightly Digestion — OP_11 (Incremental)
### STORE
- **NEW PROJECT DISCOVERED:** Polisher-Fullum-Overhaul — active since Feb 2. Upgrading swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Team: Cedric (lead), Antoine (engineering), Normand (master optician). Currently in Compliant Joint Study (trade study done — diaphragm flexure + conical flexure shortlisted). Toolhead architecture being defined. Active work Mar 20-21.
- **NEW DOCUMENTATION:** Atomizer Operating Manual — 16+ operations chapters in Obsidian covering full Atomizer framework (CalculiX, Gmsh, Topology Optimization, NX Integration, etc.). Significant writing effort, active as of Mar 21.
- Updated MEMORY.md: added both projects to Active Projects section.
### DISCARD
- **Archived** `2026-02-19.md` (31 days old). Key facts preserved in `archive/2026-02-19.md`.
- Feb 20 hits 30-day threshold tomorrow — queued for next cycle.
- No contradictions found in MEMORY.md.
- No stale TODOs — all blocked items are genuinely waiting on Antoine.
### SORT
- Polisher-Fullum-Overhaul added to Active Projects in MEMORY.md (high activity, client project).
- Atomizer Operating Manual added to Active Projects (documentation project, significant scope).
- Both marked as "Antoine's direct work" — not HQ-managed.
- Hydrotech Beam deprioritization note updated (Antoine focused on Polisher/GigaBIT, not just GigaBIT).
### REPAIR
- **All 7 key infrastructure paths verified** ✓ (taskboard, mc-update, CLUSTER, AGENTS_REGISTRY, orchestrate, PROJECT_STATUS, OP_11 protocol)
- **All 7 agent workspaces present** ✓
- **No broken file paths in MEMORY.md** ✓
- **Taskboard:** Only 1 task (ATZ-001 example) — still backlog. 7 Mission Control tasks from Feb still unresolved (flagged Mar 20, no change).
- **PROJECT_STATUS.md** needs update for Polisher-Fullum and Operating Manual — deferred to next active session (these are Antoine's projects, not HQ-managed).
### EVOLVE
- **Standing OP_11 idle-mode amendment (Day 23):** No HQ-managed workspace changes for 23+ consecutive days. However, Antoine is actively working on Polisher-Fullum and Operating Manual outside HQ. The idle period is HQ-specific, not company-wide.
- **Observation:** Antoine has 3 active workstreams (GigaBIT M1, Polisher-Fullum, Operating Manual) all running without HQ agent involvement. The team should be ready to support when called upon — particularly Tech Lead for compliant joint FEA, Optimizer for parametric sweeps on flexure geometry, and Webster for literature on diaphragm flexure stiffness models.
- **Cron reliability:** Digestion ran successfully Mar 20, 21, 22 — the gap from Mar 13-19 appears resolved.
### SELF-DOCUMENT
- MEMORY.md: Added Polisher-Fullum-Overhaul and Atomizer Operating Manual to Active Projects.
- No changes needed to SOUL.md, IDENTITY.md, AGENTS.md, or TOOLS.md — all current.

View File

@@ -0,0 +1,34 @@
# 2026-03-23
## Nightly Digestion — OP_11 (Incremental)
### STORE
- **Polisher-Fullum progressing:** New Implementation docs (Stochastic-Dither-Reference, Claude-Desktop-Instructions, Simulation-Physics-Reference updates) and Compliant Joint Study advancing — conical flexure NX modeling guide, COR analysis + architecture pivot, diaphragm stiffness analysis, dual diaphragm Z-block analysis. Excalidraw concept drawings created. Antoine actively developing toolhead architecture.
- **Operating Manual:** 52 files touched in last 24h (Syncthing sync — likely batch update to Operations chapters and Knowledge section).
- No new Antoine corrections to capture. No new HQ-managed project activity.
### DISCARD
- **Archived and removed** `2026-02-19.md`, `2026-02-20.md`, `2026-02-21.md` (30-31 days old). Key facts preserved in `archive/` summaries.
- Feb 22 hits 30-day threshold tomorrow — queued for next cycle.
- Feb 26-28 already covered by `archive/2026-02-26_to_2026-03-12_idle-period.md` — originals can be cleaned when they hit 30 days (Feb 22-25 first).
- No contradictions found in MEMORY.md.
- No stale TODOs.
### SORT
- Nothing to promote. Polisher-Fullum and Operating Manual remain Antoine's direct work, not HQ-managed.
- Polisher project has evolved from "concept research" to active implementation/simulation phase — noted but no MEMORY.md update needed (project description already covers this scope).
### REPAIR
- **All 7 key infrastructure paths verified** ✓ (taskboard, mc-update, CLUSTER, AGENTS_REGISTRY, orchestrate, PROJECT_STATUS, OP_11 protocol)
- **All 6 agent workspaces present** ✓
- **No broken file paths in MEMORY.md** ✓
- **Taskboard:** Unchanged — ATZ-001 example only. 7 Mission Control tasks from Feb still unresolved.
- **PROJECT_STATUS.md:** Current as of Mar 22 digestion.
### EVOLVE
- **Standing OP_11 idle-mode amendment (Day 24):** No HQ-managed workspace changes for 24+ consecutive days. Antoine remains active on his own projects (Polisher-Fullum now in simulation/implementation phase, Operating Manual writing). Team ready to support when called.
- **Readiness note:** Polisher toolhead work (diaphragm flexure stiffness, conical flexure modeling, COR analysis) is exactly the kind of work Tech Lead and Optimizer could support — parametric FEA sweeps, compliance matrix analysis, joint stiffness characterization. If Antoine pulls us in, we're prepared.
- **Cron reliability:** 4 consecutive successful digestions (Mar 20-23). Gap issue from Mar 13-19 appears resolved.
### SELF-DOCUMENT
- No changes needed to MEMORY.md, SOUL.md, IDENTITY.md, AGENTS.md, or TOOLS.md — all current.

View File

@@ -0,0 +1,34 @@
# 2026-03-24
## Nightly Digestion — OP_11 (Incremental)
### STORE
- **Polisher-Fullum advancing:** New git commit `e88db32` — "Initial: toolhead flexure design notebook + NXOpen script". Files added: `toolhead_flexure_nxopen.py`, `Toolhead_Flexure_Design.ipynb`, `Toolhead_Flexure_NXOpen.ipynb`, `03-NXOpen-Script-Prompt.md`, `README-INSTRUCTIONS.md`. Antoine is moving from concept research into parametric modeling — NXOpen scripted flexure generation.
- **Operating Manual:** 52 files touched again (Syncthing sync — batch update to Operations chapters and Knowledge section, same pattern as Mar 23). Continued writing effort.
- No new Antoine corrections. No new HQ-managed project activity.
### DISCARD
- **Archived** `2026-02-22.md` (30 days old). Key facts preserved in `archive/2026-02-22.md` (MIND_MAP_AUDIT creation, weekend quiet period).
- Feb 23 hits 30-day threshold tomorrow — queued for next cycle.
- Feb 24-25 originals still under 30 days. Feb 26-28 covered by `archive/2026-02-26_to_2026-03-12_idle-period.md`.
- No contradictions found in MEMORY.md.
- No stale TODOs.
### SORT
- Nothing to promote. Polisher-Fullum and Operating Manual remain Antoine's direct work.
- Polisher project evolution noted: moved from trade studies → NXOpen parametric scripting phase. Significant capability development (automated flexure geometry generation).
### REPAIR
- **All 7 key infrastructure paths verified** ✓
- **All 7 agent workspaces present** ✓
- **No broken file paths in MEMORY.md** ✓
- **Taskboard:** Unchanged (ATZ-001 example only). Mission Control tasks.json still has stale tasks from Feb.
- **PROJECT_STATUS.md:** Current as of Mar 20 digestion. No state changes require update.
### EVOLVE
- **Standing OP_11 idle-mode amendment (Day 25):** No HQ-managed workspace changes for 25+ consecutive days. Antoine remains active on own projects (Polisher-Fullum now in NXOpen scripted parametric modeling, Operating Manual writing).
- **Readiness note:** The NXOpen scripted flexure work (`toolhead_flexure_nxopen.py`) is exactly the type of work Study Builder could support — parametric NX journal generation, batch run setup, result extraction. Tech Lead and Optimizer could support design space exploration once Antoine has the base geometry parametrized.
- **Cron reliability:** 5 consecutive successful digestions (Mar 20-24). Gap issue from Mar 13-19 fully resolved.
### SELF-DOCUMENT
- No changes needed to MEMORY.md, SOUL.md, IDENTITY.md, AGENTS.md, or TOOLS.md — all current.

View File

@@ -0,0 +1,12 @@
# Archive: 2026-02-19
**Original:** Nightly Digestion — OP_11 (Incremental)
## Key Facts Preserved
- Updated MEMORY.md with Project Standard review package status + Auditor MVS recommendation
- Captured lessons: Secretary/sub-agent Slack posting issues, Auditor review value
- Updated PROJECT_STATUS.md with all 3 active projects
- Fixed: Webster missing from AGENTS.md Agent Directory table
- Noted: Auditor blocked on P-Adaptive-Isogrid review since Feb 16
- Observation: Project Standard multi-agent orchestration worked well — taskboard protocol maturing
- Issue flagged: mc-update.sh `list` command doesn't work

View File

@@ -0,0 +1,9 @@
# Archive: 2026-02-20
**Original:** Nightly Digestion — OP_11 (Incremental)
## Key Facts Preserved
- **Adaptive Isogrid Plate Lightweighting** project discovered — full spec + 3 reviews in `shared/war-room-isogrid/`
- Webster hit web_search API key issue (TASK-001 blocked)
- PROJECT_STATUS.md and MEMORY.md updated with Isogrid project
- No Antoine corrections to capture

View File

@@ -0,0 +1,9 @@
# Archive: 2026-02-21
**Original:** Nightly Digestion — OP_11 (Incremental)
## Key Facts Preserved
- No new activity. Weekend quiet period.
- war-room-overhaul/repo-structure.md created Feb 20 (repo audit artifact)
- Outstanding: Webster web_search API key still unresolved
- Outstanding: Auditor P-Adaptive-Isogrid block since Feb 16 still unresolved

View File

@@ -0,0 +1,10 @@
# Archive: 2026-02-22
## Key Facts Preserved
- MIND_MAP_AUDIT.md (16KB) created Feb 21 — comprehensive audit of Excalidraw master mind map vs actual codebase/docs. 385 text nodes reviewed.
- No project activity — weekend quiet period.
- Tech Lead legacy files from 2025 flagged for consolidation (not yet done).
- All infrastructure paths verified.
## Original Context
Weekend digestion. No new Antoine corrections. Three projects awaiting CEO input (Hydrotech, Project Standard, Isogrid).