# Gen 001 — Project Intake + Technical Breakdown **Date:** 2026-02-09 **Sources:** CEO intake in #project-hydrotech-beam, Technical Lead analysis **Author:** Manager 🎯 --- ## What Happened 1. Antoine submitted the Hydrotech beam optimization request via #project-hydrotech-beam 2. Manager created project folder and CONTEXT.md from intake data 3. Technical Lead produced a full technical breakdown (BREAKDOWN.md) 4. Manager and CEO agreed on project structure (KB-integrated layout) ## Key Findings ### From Intake - Sandwich I-beam, steel, with lightening holes in web - 4 design variables (3 continuous + 1 integer) - Current design: ~974 kg, ~22 mm tip displacement - Targets: minimize mass, displacement ≤ 10 mm, stress ≤ 130 MPa ### From Technical Breakdown - **Critical:** Baseline already violates displacement constraint (22 mm vs 10 mm) - Single-objective formulation recommended (minimize mass, constrain the rest) - Two-phase approach: DoE (40–50 trials) then TPE (60–100 trials) - Significant variable interactions expected (sandwich theory, hole interactions) - 9 gaps identified needing CEO input - Overall risk: MEDIUM-HIGH (feasible region may be tight or empty) ## KB Entries Created - `components/sandwich-beam.md` — component file with specs, behavior, interactions - `materials/steel-aisi.md` — placeholder, needs NX model data - `fea/models/sol101-static.md` — solver setup, pending gap resolution ## Decisions Made - DEC-HB-004: KB-integrated project structure (Approved) - DEC-HB-005: No Notion, Gitea + .md only (Approved) - DEC-HB-006: KB skill extension pattern, no fork (Approved) ## Open Items 9 gaps pending CEO input (see [_index.md](../_index.md)): - G1–G2: Geometry and loading (most critical) - G3–G4: Result extraction specifics - G5: Geometric feasibility at extremes - G6–G8: NX model details - G9: Stress allowable basis ## Next Steps 1. Resolve gaps G1–G9 with Antoine 2. Upload reference models to `models/` 3. Begin NX model introspection 4. Set up first study (DoE)