# 2026-02-22 ## Nightly Digestion — OP_11 (Incremental) ### STORE - New artifact: `MIND_MAP_AUDIT.md` (16KB) created Feb 21 — comprehensive audit of Excalidraw master mind map vs actual codebase/docs. 385 text nodes reviewed. Identifies gaps between mind map and reality. - No new Antoine corrections. No new project activity. Weekend quiet period continues. ### DISCARD - Manager memory files: oldest is Feb 8 (14 days) — all within 30-day retention - **Flagged:** Tech Lead has 2 legacy files from 2025 (`2025-02-09.md`, `2025-07-17.md`) — pre-HQ era Hydrotech Beam logs. Contains useful domain knowledge (NXOpenSolver implementation, technical breakdown). Not deleting — but should be consolidated into Tech Lead's MEMORY.md or project KB during next deep digestion. - No contradictions found in current memory files - No stale TODOs — all 3 active projects genuinely awaiting CEO input ### SORT - MIND_MAP_AUDIT.md lives correctly at workspace root (one-off audit artifact, not a daily note) - No patterns to promote — quiet weekend ### REPAIR - PROJECT_STATUS.md still accurate — no state changes since Feb 20 - MEMORY.md still accurate - All key paths verified: `shared/standardization/`, `shared/war-room-isogrid/`, `shared/war-room-overhaul/` intact - Outstanding blockers unchanged: - Hydrotech Beam: blocked on Antoine (dalidou pull + test) - Project Standard: awaiting CEO decision (full spec vs MVS) - Adaptive Isogrid: awaiting CEO review - Auditor P-Adaptive-Isogrid block (since Feb 16): still unresolved - Webster web_search API key: still needs Mario ### EVOLVE - No process issues this cycle - Observation: 3 projects all blocked on CEO review simultaneously. When Antoine returns, priority triage will be needed to avoid bottleneck. - MIND_MAP_AUDIT provides roadmap for docs/mind-map alignment — useful for next active work phase ### SELF-DOCUMENT - No changes needed — docs current --- ## AOM Project — MASSIVE Session (afternoon) ### What Happened Antoine came in and asked about AOM project status. Resulted in a multi-hour session covering: 1. **AOM Phase 3 completed** — wrote 6 remaining docs (Decision Log, Evolution Principles, Failure Patterns, Digestion Protocol, Context Engineering, Project KB Template). AOM went from ~85% → 100% content (30 docs, ~7,600 lines). 2. **Phase 4 (LLM Layer) completed** — 3 docs: CLAUDE.md v2 (150 lines replacing 871-line v1), Context-Loading Strategy (4-layer system), AOM Skill Module. 3. **Phase 5 (Living Protocol) completed** — maintenance rules, update triggers, health checks, ownership model. 4. **Tool-Agnostic Architecture Plan** — Antoine asked for a plan to make Atomizer solver-agnostic. Researched the Arsenal doc (800+ lines), wrote `ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB) with: 3 abstraction layers (contracts → processors → orchestrator), AtomizerSpec v3.0 with ToolchainConfig, 7-sprint implementation roadmap, V2 repo structure. 5. **AOM V2 Integration** — Antoine said "document first, code later." Audited all 30 AOM docs for NX-hardcoding, created 5-phase integration plan. Executed ALL phases: - Phase A: 4 new foundation docs (Tool-Agnostic Architecture, Data Contracts Reference, Processor Dev Guide, Arsenal Reference) - Phase B: 5 core rewrites (System Architecture, Component Map, Codebase Architecture, Extension Points, Multi-Solver Roadmap) - Phase C: 19 surgical updates across all pillars - Phase D: 5 new solver guides (CalculiX, Gmsh, OpenFOAM, Multi-Physics, MCP Server Dev) - Phase E: MAP + final updates **Result: AOM grew from 37 → 48 docs, ~8,830 lines. Zero NX-only assumptions remain.** 6. **V2 Migration Master Plan** — Antoine confirmed new repo at `http://192.168.86.50:3000/Antoine/Atomizer-V2` (Gitea, currently empty). Wrote comprehensive migration plan (28KB): complete V2 repo structure, what migrates vs doesn't, 6-phase execution (8 days), .gitignore, pyproject.toml, README.md draft, Obsidian sync strategy. ### Key Decisions Made (by Antoine) - DEC-030: Tool-agnostic architecture approved - DEC-032: New repo (V2) instead of cleaning V1 - DEC-033: Documentation-first — AOM before code - DEC-021: AOM stays in Obsidian until migration - V2 Gitea repo created at `192.168.86.50:3000/Antoine/Atomizer-V2` ### CEO Decisions Still Pending (for migration) 1. License type (Apache 2.0 / MIT) 2. GitHub repo name 3. Obsidian ↔ repo sync strategy 4. HQ separation (in V2 or separate?) 5. Confirm projects/ stays off git 6. GitHub visibility (public/private) 7. Timing to start ### Files Created/Modified Today - `P-Atomizer-Operating-Manual/` — 11 new docs, 5 rewrites, 19 updates - `Atomizer-AtomasteAI/Development/ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md` (28KB) - `Atomizer-AtomasteAI/Development/ATOMIZER-V2-MIGRATION-MASTERPLAN.md` (28KB) - Integration plan archived to `P-Atomizer-Operating-Manual/Archive/` ### Blocker: Sub-agent Spawning - `sessions_spawn` fails with "gateway closed (1008): pairing required" — both with `agentId=auditor` and without - This blocks delegating work to Auditor (or any sub-agent) - Asked Antoine for preference: self-review on Opus or wait for infra fix - No response yet as of 7pm ### Next Steps - Awaiting Antoine's decision on auditor review approach (self vs wait for infra) - Antoine reviewing migration master plan - After CEO approval → execute Phase 0 (repo bootstrap + AOM deployment)