# 2026-03-22 ## Nightly Digestion — OP_11 (Incremental) ### STORE - **NEW PROJECT DISCOVERED:** Polisher-Fullum-Overhaul — active since Feb 2. Upgrading swing arm polisher for GigaBIT M1 mirror (1.2m Zerodur, F/1.2, ≤22nm RMS WFE). Team: Cedric (lead), Antoine (engineering), Normand (master optician). Currently in Compliant Joint Study (trade study done — diaphragm flexure + conical flexure shortlisted). Toolhead architecture being defined. Active work Mar 20-21. - **NEW DOCUMENTATION:** Atomizer Operating Manual — 16+ operations chapters in Obsidian covering full Atomizer framework (CalculiX, Gmsh, Topology Optimization, NX Integration, etc.). Significant writing effort, active as of Mar 21. - Updated MEMORY.md: added both projects to Active Projects section. ### DISCARD - **Archived** `2026-02-19.md` (31 days old). Key facts preserved in `archive/2026-02-19.md`. - Feb 20 hits 30-day threshold tomorrow — queued for next cycle. - No contradictions found in MEMORY.md. - No stale TODOs — all blocked items are genuinely waiting on Antoine. ### SORT - Polisher-Fullum-Overhaul added to Active Projects in MEMORY.md (high activity, client project). - Atomizer Operating Manual added to Active Projects (documentation project, significant scope). - Both marked as "Antoine's direct work" — not HQ-managed. - Hydrotech Beam deprioritization note updated (Antoine focused on Polisher/GigaBIT, not just GigaBIT). ### REPAIR - **All 7 key infrastructure paths verified** ✓ (taskboard, mc-update, CLUSTER, AGENTS_REGISTRY, orchestrate, PROJECT_STATUS, OP_11 protocol) - **All 7 agent workspaces present** ✓ - **No broken file paths in MEMORY.md** ✓ - **Taskboard:** Only 1 task (ATZ-001 example) — still backlog. 7 Mission Control tasks from Feb still unresolved (flagged Mar 20, no change). - **PROJECT_STATUS.md** needs update for Polisher-Fullum and Operating Manual — deferred to next active session (these are Antoine's projects, not HQ-managed). ### EVOLVE - **Standing OP_11 idle-mode amendment (Day 23):** No HQ-managed workspace changes for 23+ consecutive days. However, Antoine is actively working on Polisher-Fullum and Operating Manual outside HQ. The idle period is HQ-specific, not company-wide. - **Observation:** Antoine has 3 active workstreams (GigaBIT M1, Polisher-Fullum, Operating Manual) all running without HQ agent involvement. The team should be ready to support when called upon — particularly Tech Lead for compliant joint FEA, Optimizer for parametric sweeps on flexure geometry, and Webster for literature on diaphragm flexure stiffness models. - **Cron reliability:** Digestion ran successfully Mar 20, 21, 22 — the gap from Mar 13-19 appears resolved. ### SELF-DOCUMENT - MEMORY.md: Added Polisher-Fullum-Overhaul and Atomizer Operating Manual to Active Projects. - No changes needed to SOUL.md, IDENTITY.md, AGENTS.md, or TOOLS.md — all current.