# Hydrotech Beam — Executive Dashboard Last updated (UTC): 2026-02-14T22:24:29 Source: `studies/01_doe_landscape/results/doe_summary.json` + `doe_results.csv` ## CEO 60-second view - **Phase:** DOE Phase 1 (LHS) - **Gate status:** ❌ **BLOCKED** (Phase 1 → Phase 2) - **Total trials:** 51 - **Solved:** 39 (**76.5%**, below 80% gate) - **Geo-infeasible:** 12 - **Fully feasible designs:** 0 (gate requires ≥5) ## Top signals - ✅ Mass extraction now looks real (no NaN in solved rows) - ✅ Syncthing cleanup completed (active conflict files archived) - ⚠️ Displacement constraint is the blocker (0/39 displacement-feasible at 10 mm) - ⚠️ DOE→TPE gate cannot pass with current limits/bounds ## Decision hotlist (CEO) 1. **Approve next constraint strategy**: - Option A (recommended): exploratory rerun at **20 mm** displacement - Option B: keep 10 mm and tighten design bounds for stiffness 2. **Approve TPE entry rule** (with strict gate or conditional gate) ## Recommendation (current) Proceed with **Option A** for exploration (20 mm), then tighten toward 10 mm in staged optimization. ## KPI snapshot - Solve success rate: **76.5%** - Feasibility rate (full): **0.0%** - Best solved mass: **686.289 kg** (not fully feasible) - Best trial ID by mass: **26**