# Daily Log — 2026-02-08 ## Projects Active ### **Hydrotech Beam Structural Optimization** - **Channel:** #project-hydrotech-beam - **Status:** Intake complete, technical breakdown done by Tech Lead - **Objective:** - Reduce mass (~974 kg baseline) - Reduce tip displacement (~22mm → target <10mm) - Keep stress <130 MPa - **Design variables (4):** core thickness, face thickness, hole diameter, hole count - **Solver:** NX Nastran (static structural) - **Project folder:** `/home/papa/atomizer/projects/hydrotech-beam/` ### Key Technical Finding - **⚠️ Critical issue:** Baseline already violates displacement constraint (22mm > 10mm target) - **Risk:** Feasible region may be tight - **Blocker:** 9 gaps identified by Tech Lead that need Antoine's input before optimization can proceed ### Next Steps 1. **🔴 URGENT:** Gap resolution session with Antoine 2. Model validation 3. DoE (Design of Experiments) ## Communication - Antoine asked for updates on Hydrotech project (21:41 UTC) - Manager provided full briefing (21:43+ UTC) - Antoine mentioned posting details in #project-hydrotech-beam channel ## Notes - Antoine initially seemed surprised I didn't see #project-hydrotech-beam content - I don't have access to read that channel directly - All project coordination happening through Manager per protocols