# Hydrotech Beam — Technical Dashboard Last updated (UTC): 2026-02-14T22:24:29 Source: `studies/01_doe_landscape/results/doe_results.csv` ## Study health - Trials: 51 - Solved: 39 - Geo-infeasible: 12 - Solve failures: 0 - Full-feasible: 0 ## Constraint status - Displacement limit: **10.0 mm** - Stress limit: **130.0 MPa** Observed solved ranges: - Tip displacement: **11.7788 → 39.4912 mm** - Max von Mises stress: **75.0116 → 398.4295 MPa** Feasibility counts: - Displacement feasible: **0** - Stress feasible: **23** - Fully feasible: **0** ## Performance / runtime - Solve time range (solved): **12.42 s → 59.59 s** - Pattern indicates real NX execution (non-stub timing) ## Data quality checks - Mass NaN (solved): **0** ✅ - Penalty mass (99999): **12** (geo infeasible trials) ✅ expected - Mixed appended run state: **cleared** (current clean 51-trial set) ## Technical interpretation - Current geometry space + 10 mm displacement limit appears too restrictive. - Stress limit is partially satisfiable (23/39), so the primary bottleneck is stiffness/displacement. ## Recommended technical next actions 1. Run a controlled DOE with displacement limit = 20 mm (exploration mode) 2. Identify near-feasible stiff regions 3. Launch TPE with penalty + staged tightening toward 10 mm 4. Re-run gate check with updated feasible counts