# Audit: Hydrotech Beam Project Health — 2026-02-14 **Verdict:** CONDITIONAL PASS **Posted to:** Discord #hydrotech-beam (channel 1472019487308910727) ## Key Findings - 🔴 Mass = NaN on ALL 39 solved trials (fix exists in 580ed65, not re-run) - 🔴 DOE not re-run since mass fix (3 days stale) - 🟡 Solve success rate 76.5% (below 80% gate, but all "failures" are geo-prefilter — actual NX solve rate is 100%) - 🟡 Phase 1 gate check failed (all criteria) - 🟡 doe_summary.json still says 10mm constraint (should be 20mm per DEC-HB-012) - 🟢 Documentation, code architecture, physics — all solid ## Blocker Pull 580ed65 on dalidou → re-run DOE → verify mass values ## Next Review After DOE re-run with clean mass data, review results before Phase 2 gate.