# Project Status Dashboard Updated: 2026-03-01 04:00 AM (Nightly Digestion OP_11) ## Active Projects ### πŸ“¦ Atomizer V2 Migration - **Phase:** βœ… COMPLETE (2026-02-23) - **What happened:** 8 commits pushed to Gitea. 218+ Python files, 58 tests passing. All phases done: repo bootstrap, core engine port, integration testing, reference implementation, CLAUDE.md, Data Contracts (5 dataclasses), Pipeline-NX integration tests. Dalidou validated: `import atomizer` v2.0.0 + 24/24 tests on Windows. - **Post-migration:** Coherence audit delivered (conditional pass, 3 critical findings fixed in preflight). V1 tagged `v1-final`, kept active for current optimizations. AOMβ†’Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work. - **Remaining roadmap:** Items 4-9 in ROADMAP-NEXT.md (docs/dev/) - **Location:** `192.168.86.50:3000/Antoine/Atomizer-V2`, Obsidian vault `P-Atomizer-Operating-Manual/` - **Owner:** Manager ### 🏒 Atomizer/HQ Separation - **Phase:** βœ… COMPLETE (2026-02-23) - **Decision:** DEC-037 β€” Atomizer = product (V2 repo), HQ = AI operations team (HQ repo). AOM governs the product. 7 AOM docs updated. HQ repo pushed to Gitea (218 files). - **Owner:** Manager ### πŸ”© Hydrotech Beam β€” Optimization - **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE) - **Status:** ⏸️ BLOCKED β€” Mass NaN fix committed (580ed65), needs pull + test on dalidou - **Key numbers:** 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm - **Next:** Antoine pulls fix on dalidou β†’ test single trial β†’ rerun DOE β†’ Phase 2 TPE - **Owner:** Tech Lead + Study Builder ### πŸ“ Atomizer Project Standard - **Phase:** Review complete, awaiting CEO decision - **Status:** 🟑 AWAITING APPROVAL - **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis - **Location:** `shared/standardization/` - **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide. - **Owner:** Manager ### πŸ”Ί Adaptive Isogrid Plate Lightweighting - **Phase:** Technical spec locked, reviews complete - **Status:** 🟑 AWAITING CEO REVIEW - **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review - **Location:** `shared/war-room-isogrid/` - **Next:** CEO review β†’ implementation planning - **Owner:** Manager / Tech Lead ### πŸ”¬ Material Research (M2 Mirror Trade Study) - **Phase:** Research complete - **Status:** βœ… Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC) - **Next:** Awaiting project context to produce recommendation - **Owner:** Webster ## Outstanding Blockers - **Auditor** blocked on P-Adaptive-Isogrid review since Feb 16 (11 days β€” chronic, moot until CEO reviews Isogrid; closing next active session) - **Webster** web_search API key missing (needs Mario, since Feb 19 β€” 8 days) - **3 projects** simultaneously awaiting CEO input β€” triage needed when Antoine returns ## Recent Activity - 2026-02-24: **Arsenal Development Plan** β€” Tech Lead produced dev blueprint (multi-solver expansion, 6-sprint roadmap). Auditor delivered risk analysis + quality gates (flagged 5 simultaneous problem streams, recommended phased de-risking). Good team output. - 2026-02-23: V2 Migration COMPLETE (8 commits, 218+ files, 58 tests). HQ Separation COMPLETE (DEC-037). Coherence audit + preflight fixes delivered. - 2026-02-22: AOM 100% complete (48 docs), tool-agnostic architecture - 2026-02-18: Project standardization package assembled and reviewed