{ "study_name": "hydrotech_beam_doe_phase1_real", "phase": "Phase 1 \u2014 LHS DoE", "project": "Hydrotech Beam Structural Optimization", "timestamp": "2026-02-14T22:24:29.123157+00:00", "configuration": { "n_lhs_samples": 50, "seed": 42, "baseline_included": true, "algorithm": "Latin Hypercube Sampling (scipy.stats.qmc)", "constraint_handling": "Deb's feasibility rules", "displacement_limit_mm": 10.0, "stress_limit_MPa": 130.0 }, "design_variables": [ { "name": "beam_half_core_thickness", "nx_expression": "beam_half_core_thickness", "lower": 10.0, "upper": 40.0, "baseline": 25.162, "type": "continuous" }, { "name": "beam_face_thickness", "nx_expression": "beam_face_thickness", "lower": 10.0, "upper": 40.0, "baseline": 21.504, "type": "continuous" }, { "name": "holes_diameter", "nx_expression": "holes_diameter", "lower": 150.0, "upper": 450.0, "baseline": 300.0, "type": "continuous" }, { "name": "hole_count", "nx_expression": "hole_count", "lower": 5.0, "upper": 15.0, "baseline": 10.0, "type": "integer" } ], "results": { "total_trials": 51, "solved": 39, "geo_infeasible": 12, "solve_failed": 0, "fully_feasible": 0, "solve_success_rate": 76.5, "feasibility_rate": 0.0 }, "best_feasible": null, "phase1_gate_check": { "min_feasible_5": false, "solve_success_80pct": false, "gate_passed": false } }