2026-02-23

Nightly Digestion — OP_11 (Incremental)

STORE

  • AOM V2 Migration is the dominant new workstream as of Feb 22. Massive session: AOM completed (48 docs, ~8,830 lines), tool-agnostic architecture approved (DEC-030), V2 repo created at 192.168.86.50:3000/Antoine/Atomizer-V2 (DEC-032), documentation-first approach confirmed (DEC-033).
  • Auditor delivered V2 migration audit (288 lines) identifying 11 findings including 13 missing V1 modules. Revised masterplan (V2) produced addressing all findings — 12-day realistic timeline.
  • Code review also delivered (shared/reviews/v2-migration-code-review.md, 255 lines).
  • 6 CEO decisions still pending for V2 migration: license type, GitHub name, sync strategy, HQ separation, projects/ exclusion, visibility, timing.
  • Sub-agent spawning broken ("gateway closed 1008: pairing required") — blocks delegation. Unresolved.

DISCARD

  • Memory files: oldest is Feb 8 (15 days) — within 30-day retention. No pruning needed.
  • No contradictions found in current memory.
  • No stale TODOs resolved since last cycle.

SORT

  • V2 Migration reviews correctly placed in shared/reviews/ (project-level artifacts).
  • AOM docs live in Obsidian vault (correct — CEO decision DEC-021).
  • No patterns to promote from session-level to domain-level.

REPAIR

  • PROJECT_STATUS.md needs update — doesn't reflect AOM/V2 Migration project or auditor's V2 audit deliverable. Updating now.
  • Auditor P-Adaptive-Isogrid block: still unresolved (since Feb 16, now 7 days). Tech Lead has not responded.
  • Webster web_search API key: still needs Mario (since Feb 19).
  • Sub-agent spawning: broken since Feb 22 at minimum. Infrastructure issue for Mario.

EVOLVE

  • Observation: The Feb 22 session was a solo mega-session (Manager did everything — AOM writing, architecture, migration planning) because sub-agent spawning is broken. This is unsustainable for complex work. Sub-agent infra fix is critical.
  • Observation: 4 projects now awaiting CEO input simultaneously (Hydrotech Beam, Project Standard, Adaptive Isogrid, V2 Migration decisions). Priority triage essential when Antoine returns.
  • Process note: Auditor review via spawned sub-agent DID work on Feb 22 (delivered the V2 audit) — so spawning may be intermittent, not fully broken. Worth retesting.

SELF-DOCUMENT

  • PROJECT_STATUS.md updated to include AOM/V2 Migration project.
  • No other doc changes needed.