Nightly Digestion — OP_11 (Incremental)
STORE
- Arsenal Development Plan: Tech Lead produced multi-solver expansion blueprint (6-sprint roadmap, CalculiX first, then CFD/thermal). Lives at
workspaces/technical-lead/docs/DEV/ARSENAL-DEVELOPMENT-PLAN.md. - Arsenal Risk Analysis: Auditor delivered quality gates + risk analysis. Key finding: plan tries to solve 5 problems simultaneously — recommends aggressive phasing. Lives at
workspaces/auditor/Arsenal-Risk-Analysis-Quality-Gates.md. - No new CEO corrections to process. No new Antoine activity.
DISCARD
- Memory files: oldest is Feb 8 (17 days) — within 30-day retention, no pruning needed.
- No contradictions found. MEMORY.md Active Projects section is current.
- No stale TODOs resolved.
SORT
- Arsenal docs correctly placed in respective agent workspaces (project-level artifacts).
- No session-level patterns to promote to domain/company level.
REPAIR
- PROJECT_STATUS.md updated: added Arsenal activity to Recent Activity, updated blocker ages (Auditor 9 days, Webster 6 days), updated timestamp.
- Auditor P-Adaptive-Isogrid block: 9 days. This is chronic. Recommend closing this blocker — the Isogrid project is awaiting CEO review anyway, so the Auditor review can happen after CEO decides direction. No point blocking on it.
- Webster web_search: 6 days. Still needs Mario.
- All file paths in docs verified — no broken references.
EVOLVE
- Observation: Team is self-organizing on Arsenal work (Tech Lead + Auditor collaborating without Manager orchestration). Good sign for autonomy.
- Observation: 3 projects still blocked on CEO input (Hydrotech ~12 days, Project Standard ~7 days, Isogrid ~7 days). No change possible without Antoine.
- No process changes needed.
SELF-DOCUMENT
- PROJECT_STATUS.md updated (Arsenal activity, blocker ages, timestamp).
- No other doc changes needed — MEMORY.md and workspace docs current.