Project Status Dashboard
Updated: 2026-02-25 04:00 AM (Nightly Digestion OP_11)
Active Projects
📦 Atomizer V2 Migration
- Phase: ✅ COMPLETE (2026-02-23)
- What happened: 8 commits pushed to Gitea. 218+ Python files, 58 tests passing. All phases done: repo bootstrap, core engine port, integration testing, reference implementation, CLAUDE.md, Data Contracts (5 dataclasses), Pipeline-NX integration tests. Dalidou validated:
import atomizerv2.0.0 + 24/24 tests on Windows. - Post-migration: Coherence audit delivered (conditional pass, 3 critical findings fixed in preflight). V1 tagged
v1-final, kept active for current optimizations. AOM→Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work. - Remaining roadmap: Items 4-9 in ROADMAP-NEXT.md (docs/dev/)
- Location:
192.168.86.50:3000/Antoine/Atomizer-V2, Obsidian vaultP-Atomizer-Operating-Manual/ - Owner: Manager
🏢 Atomizer/HQ Separation
- Phase: ✅ COMPLETE (2026-02-23)
- Decision: DEC-037 — Atomizer = product (V2 repo), HQ = AI operations team (HQ repo). AOM governs the product. 7 AOM docs updated. HQ repo pushed to Gitea (218 files).
- Owner: Manager
🔩 Hydrotech Beam — Optimization
- Phase: DOE Phase 1 complete, awaiting Phase 2 (TPE)
- Status: ⏸️ BLOCKED — Mass NaN fix committed (
580ed65), needs pull + test on dalidou - Key numbers: 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
- Next: Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
- Owner: Tech Lead + Study Builder
📐 Atomizer Project Standard
- Phase: Review complete, awaiting CEO decision
- Status: 🟡 AWAITING APPROVAL
- Deliverables ready: Full spec, tech-lead review, auditor audit, secretary synthesis
- Location:
shared/standardization/ - Key decision: Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
- Owner: Manager
🔺 Adaptive Isogrid Plate Lightweighting
- Phase: Technical spec locked, reviews complete
- Status: 🟡 AWAITING CEO REVIEW
- Deliverables ready: Full technical spec (32KB), optimizer review, tech-lead review, webster review
- Location:
shared/war-room-isogrid/ - Next: CEO review → implementation planning
- Owner: Manager / Tech Lead
🔬 Material Research (M2 Mirror Trade Study)
- Phase: Research complete
- Status: ✅ Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC)
- Next: Awaiting project context to produce recommendation
- Owner: Webster
Outstanding Blockers
- Auditor blocked on P-Adaptive-Isogrid review since Feb 16 (9 days — chronic, needs resolution)
- Webster web_search API key missing (needs Mario, since Feb 19 — 6 days)
- 3 projects simultaneously awaiting CEO input — triage needed when Antoine returns
Recent Activity
- 2026-02-24: Arsenal Development Plan — Tech Lead produced dev blueprint (multi-solver expansion, 6-sprint roadmap). Auditor delivered risk analysis + quality gates (flagged 5 simultaneous problem streams, recommended phased de-risking). Good team output.
- 2026-02-23: V2 Migration COMPLETE (8 commits, 218+ files, 58 tests). HQ Separation COMPLETE (DEC-037). Coherence audit + preflight fixes delivered.
- 2026-02-22: AOM 100% complete (48 docs), tool-agnostic architecture
- 2026-02-18: Project standardization package assembled and reviewed