- 8-agent OpenClaw cluster (Manager, Tech-Lead, Secretary, Auditor, Optimizer, Study-Builder, NX-Expert, Webster) - Orchestration engine: orchestrate.py (sync delegation + handoffs) - Workflow engine: YAML-defined multi-step pipelines - Agent workspaces: SOUL.md, AGENTS.md, MEMORY.md per agent - Shared skills: delegate, orchestrate, atomizer-protocols - Capability registry (AGENTS_REGISTRY.json) - Cluster management: cluster.sh, systemd template - All secrets replaced with env var references
780 B
780 B
Audit: Hydrotech Beam Project Health — 2026-02-14
Verdict: CONDITIONAL PASS Posted to: Discord #hydrotech-beam (channel 1472019487308910727)
Key Findings
- 🔴 Mass = NaN on ALL 39 solved trials (fix exists in
580ed65, not re-run) - 🔴 DOE not re-run since mass fix (3 days stale)
- 🟡 Solve success rate 76.5% (below 80% gate, but all "failures" are geo-prefilter — actual NX solve rate is 100%)
- 🟡 Phase 1 gate check failed (all criteria)
- 🟡 doe_summary.json still says 10mm constraint (should be 20mm per DEC-HB-012)
- 🟢 Documentation, code architecture, physics — all solid
Blocker
Pull 580ed65 on dalidou → re-run DOE → verify mass values
Next Review
After DOE re-run with clean mass data, review results before Phase 2 gate.