Files
Atomizer/hq/workspaces/shared/PROJECT_STATUS.md

2.9 KiB

Project Status Dashboard

Updated: 2026-02-23 04:00 AM (Nightly Digestion OP_11)

Active Projects

📦 AOM / V2 Migration (NEW — Feb 22)

  • Phase: Documentation complete, migration plan reviewed
  • Status: 🟡 AWAITING CEO DECISIONS (6 items)
  • What happened: AOM completed (48 docs, ~8,830 lines, zero NX-only assumptions). Tool-agnostic architecture approved (DEC-030). V2 repo created at 192.168.86.50:3000/Antoine/Atomizer-V2 (DEC-032). Migration masterplan written + audited (11 findings addressed in V2 plan, 12-day timeline).
  • Deliverables ready: AOM (Obsidian), V2 Migration Masterplan V2, Auditor audit, code review
  • Location: Obsidian vault P-Atomizer-Operating-Manual/, shared/reviews/
  • Pending CEO decisions: License type, GitHub name, Obsidian sync strategy, HQ separation, projects/ exclusion, repo visibility, timing to start
  • Owner: Manager

🔩 Hydrotech Beam — Optimization

  • Phase: DOE Phase 1 complete, awaiting Phase 2 (TPE)
  • Status: ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
  • Key numbers: 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
  • Next: Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
  • Owner: Tech Lead + Study Builder

📐 Atomizer Project Standard

  • Phase: Review complete, awaiting CEO decision
  • Status: 🟡 AWAITING APPROVAL
  • Deliverables ready: Full spec, tech-lead review, auditor audit, secretary synthesis
  • Location: shared/standardization/
  • Key decision: Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
  • Owner: Manager

🔺 Adaptive Isogrid Plate Lightweighting

  • Phase: Technical spec locked, reviews complete
  • Status: 🟡 AWAITING CEO REVIEW
  • Deliverables ready: Full technical spec (32KB), optimizer review, tech-lead review, webster review
  • Location: shared/war-room-isogrid/
  • Architecture: Python Brain + NX Hands + Atomizer Manager (semi-automated isogrid optimization)
  • Next: CEO review → implementation planning
  • Owner: Manager / Tech Lead

🔬 Material Research (M2 Mirror Trade Study)

  • Phase: Research complete
  • Status: Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC)
  • Next: Awaiting project context to produce recommendation
  • Owner: Webster

Outstanding Blockers

  • Auditor blocked on P-Adaptive-Isogrid review since Feb 16 (needs Tech Lead response)
  • Webster web_search API key missing (needs Mario, since Feb 19)
  • Sub-agent spawning intermittently broken ("pairing required" error, Feb 22)
  • 4 projects simultaneously awaiting CEO input — triage needed

Recent Completions

  • 2026-02-22: AOM 100% complete (48 docs), tool-agnostic architecture, V2 migration plan + audit
  • 2026-02-18: Project standardization package assembled and reviewed
  • 2026-02-17: System test orchestration validated