5.0 KiB
[2026-02-15 18:12] webster: Completed — Research on Ohara Clearceram-Z HS vs Schott Zerodur. [2026-02-15 18:12] Webster: Completed — Updated and refined the research summary for Clearceram-Z HS vs. Zerodur with more nuanced data. [2026-02-15 18:12] Webster: Completed — Received duplicate refined research summary (Clearceram-Z HS vs. Zerodur). No action taken as data is already in memory. [2026-02-15 18:30] Webster: Completed — Logged new material property (Invar 36 Young's modulus) to memory. [2026-02-15 18:30] Webster: Completed — Received duplicate material property for Invar 36. No action taken as data is already in memory. [2026-02-16 03:03] webster: Completed — Research on thermal conductivity of SiC and comparison with ULE and Zerodur. [2026-02-16 14:05] Auditor: Completed — Challenged the Technical Lead on the 'P-Adaptive-Isogrid vs State-of-the-Art' review in the #technical channel. [2026-02-16 15:35] Auditor: Completed — Sent a direct message to the Tech Lead to follow up on the 'P-Adaptive-Isogrid vs State-of-the-Art' review. [2026-02-16 17:12] Auditor: Completed — Notified the Manager that I am blocked on the 'P-Adaptive-Isogrid vs State-of-the-Art' review pending a response from the Tech Lead. [2026-02-16 12:56] Webster: Completed — Logged CEO decision to prioritize structural performance for the lightweight bracket, selecting 7075-T6. [2026-02-17 01:41] [manager] TASK-001: Created — Research: What is the melting point of Invar 36? (assigned to webster) [2026-02-17 01:41] [manager] TASK-002: Created — Summarize system test orchestration (assigned to secretary) [2026-02-17 01:42] [webster] TASK-001: Status → in-progress — Started research [2026-02-17 01:42] [webster] TASK-001: Status → review — Posted to #technical [2026-02-16 20:42] webster: Completed — Researched melting point of Invar 36 (TASK-001) [2026-02-17 01:42] [manager] TASK-001: Completed — Deliverable accepted — melting point data posted to #technical [2026-02-17 01:43] [secretary] TASK-002: Status → in-progress — Starting condensation [2026-02-17 01:43] [secretary] TASK-002: Status → review — Distillate composed, but failed to post to #reports due to tool error. [2026-02-17 03:05] [manager] TASK-002: Status → in-progress — Manager: Tool error prevented report delivery. Please provide the summary directly to me in the #hq channel. [2026-02-17 04:06] [manager] TASK-003: Created — Resolve blocked task: Clearceram-Z HS data (assigned to manager) [2026-02-16 23:21] Webster: Completed — Verified CTE and Density for Clearceram-Z HS. [2026-02-16 23:55] Webster: Reviewed state-of-the-art for isogrid design optimization in aerospace, focusing on mass-strength trade-offs and novel geometries. Found no external or internal references to 'P-Adaptive-Isogrid.' Ready to contribute to the review once pointed to the relevant internal documents or discussions. [2026-02-17 06:35] [manager] TASK-003: Completed — Webster reported completing the data verification in the project log, unblocking the original task. Closing this resolution task. [2026-02-17 07:05] [manager] TASK-002: Status → in-progress — Checking in on status, since original delivery was blocked by a tool error. [2026-02-17 09:05] [manager] TASK-002: Cancelled — Secretary appears to be stuck; tool error on deliverable. Re-creating as TASK-004 assigned to manager to unblock. [2026-02-17 09:05] [manager] TASK-004: Created — Summarize system test orchestration (replaces TASK-002) (assigned to manager) [2026-02-17 09:05] [manager] TASK-004: Completed — Summary posted to #reports channel. [2026-02-18 23:16] webster: Completed — Secondary research validation report for Atomizer Project Standard (NASA-STD-7009B, ASME V&V 10, ECSS, OpenMDAO, Dakota, design rationale, LLM-native docs, modeFRONTIER). [2026-02-19 00:00] secretary: Completed — Drafted executive synthesis for Atomizer Project Standardization Package; direct #hq post blocked (missing Slack bot token).
- 2026-02-18 UTC | Standardization package assembled and ready for CEO approval. Files: shared/standardization/2026-02-18-atomizer-project-standardization-package.md ; shared/standardization/synthesis/2026-02-18-secretary-synthesis.md [2026-02-19 00:30 UTC] Auditor: Completed — Atomizer Project Standard spec audit (full report + executive summary) [2026-02-19 14:52] [webster] TASK-001: Status → in-progress — Started research [2026-02-19 14:53] [webster] TASK-001: Status → todo — Blocked: web_search tool is missing API key. See Slack DM. [2026-02-22 15:33] [webster] TASK-001: Status → todo — Blocked: web_search tool is failing (missing API key). [2026-02-22 19:30] auditor: Completed — Delivered audit-revised V2 Migration Master Plan (ATOMIZER-V2-MIGRATION-MASTERPLAN-V2.md). Addresses all 11 audit findings: complete file inventory (168 files mapped), 13 missing modules added, rollback procedures, verification checklists, import compatibility shim, pinned deps, pre-commit hooks, mid-study strategy, .gitignore fixes, realistic 12-day timeline.