Archive Management: - Moved RALPH_LOOP, CANVAS, and dashboard implementation plans to archive/review/ for CEO review - Moved completed restructuring plan and protocol v1 to archive/historical/ - Moved old session summaries to archive/review/ New HQ Documentation (docs/hq/): - README.md: Overview of Atomizer-HQ multi-agent optimization team - PROJECT_STRUCTURE.md: Standard KB-integrated project layout with Hydrotech reference - KB_CONVENTIONS.md: Knowledge Base accumulation principles with generation tracking - AGENT_WORKFLOWS.md: Project lifecycle phases and agent handoffs (OP_09 integration) - STUDY_CONVENTIONS.md: Technical study execution standards and atomizer_spec.json format Index Update: - Reorganized docs/00_INDEX.md with HQ docs prominent - Updated structure to reflect new agent-focused organization - Maintained core documentation access for engineers No files deleted, only moved to appropriate archive locations.
15 KiB
Agent Workflows
Version: 1.0
Created: February 2026
Reference: OP_09 Communication Protocols
Project Lifecycle Overview
Every Atomizer-HQ project follows a structured workflow with clear phases and agent handoffs. Understanding who does what, when, and how ensures smooth project execution and quality deliverables.
Six-Phase Project Lifecycle
Intake → Breakdown → Introspection → Study → Results → Deliverables
↓ ↓ ↓ ↓ ↓ ↓
Secretary Manager Technical Lead Optimizer Post-Processor Reporter
Phase 1: Intake (Secretary)
Responsibility: Client interface, requirement capture, project initiation
Duration: 1-2 days
Deliverable: Project intake document
Secretary Tasks
-
Client Communication
- Receive and clarify project requirements
- Identify scope, timeline, budget constraints
- Gather technical specifications and constraints
- Establish client communication preferences
-
Initial Assessment
- Assess project complexity and feasibility
- Estimate required resources and timeline
- Identify potential technical challenges
- Flag any special requirements or risks
-
Project Initiation
- Create initial project folder structure
- Document client requirements in structured format
- Create
project_metadata.jsonwith basic info - Schedule handoff meeting with Manager
Secretary Deliverables
- Client Requirements Document — Structured requirements capture
- Project Metadata —
project_metadata.jsonwith client info - Initial Risk Assessment — Potential challenges identified
- Resource Estimate — Preliminary timeline and effort estimate
Handoff to Manager
Communication: Direct message with project summary
Artifacts: Requirements document, metadata file, risk assessment
Meeting: Handoff discussion to clarify any ambiguities
Phase 2: Breakdown (Manager)
Responsibility: Project structuring, team coordination, workflow planning
Duration: 1-2 days
Deliverable: Complete project structure and execution plan
Manager Tasks
-
Project Structure Setup
- Complete directory structure per
PROJECT_STRUCTURE.md - Initialize Knowledge Base framework
- Set up study planning structure
- Establish project documentation standards
- Complete directory structure per
-
Team Coordination
- Assign Technical Lead and other team members
- Define agent responsibilities and interfaces
- Establish communication channels and schedules
- Plan handoff points and review gates
-
Execution Planning
- Break down project into specific technical tasks
- Estimate timeline for each phase
- Identify dependencies and critical path
- Plan quality gates and review checkpoints
-
Risk Management
- Review and refine initial risk assessment
- Plan mitigation strategies
- Identify decision points and escalation paths
- Establish contingency plans
Manager Deliverables
- Complete Project Structure — Full directory hierarchy
- Execution Plan — Timeline, milestones, dependencies
- Team Assignments — Agent roles and responsibilities
- Communication Plan — Channels, schedules, reporting structure
Handoff to Technical Lead
Communication: Project kickoff meeting with full team
Artifacts: Complete project structure, execution plan, team assignments
Review: Executive summary of client requirements and constraints
Phase 3: Introspection (Technical Lead)
Responsibility: Technical analysis, model setup, optimization planning
Duration: 2-5 days
Deliverable: Technical foundation and study plan
Technical Lead Tasks
-
Technical Requirements Analysis
- Review client requirements from engineering perspective
- Identify technical constraints and design criteria
- Establish performance metrics and success criteria
- Define technical scope and boundaries
-
Model Setup and Validation
- Set up reference CAD and FEA models
- Validate baseline model performance
- Establish modeling conventions and assumptions
- Create model documentation and KB entries
-
Optimization Strategy Development
- Define design variables and constraints
- Select optimization objectives and metrics
- Plan study sequence and progression
- Estimate computational requirements
-
Knowledge Base Initialization
- Create initial component knowledge files
- Document material properties and constraints
- Establish FEA conventions and assumptions
- Initialize lessons learned framework
Technical Lead Deliverables
- Technical Requirements — Engineering interpretation of client needs
- Reference Models — Validated baseline CAD and FEA models
- Study Plan — Optimization strategy and study sequence
- Initial KB — Component, material, and FEA knowledge foundation
Handoff to Optimizer
Communication: Technical handoff meeting
Artifacts: Study plan, reference models, technical requirements
Training: Model setup, conventions, and optimization strategy
Phase 4: Study Execution (Optimizer)
Responsibility: FEA optimization execution, results generation
Duration: 3-10 days (depends on complexity)
Deliverable: Optimization results and raw data
Optimizer Tasks
-
Study Setup
- Create study directories per
STUDY_CONVENTIONS.md - Copy reference models to study workspace
- Configure optimization parameters and settings
- Validate model functionality and convergence
- Create study directories per
-
Optimization Execution
- Execute optimization studies per study plan
- Monitor progress and convergence
- Troubleshoot any model or solver issues
- Adjust parameters as needed for convergence
-
Results Collection
- Extract optimization results and performance data
- Document any issues or unexpected behaviors
- Create result summaries and best trial identification
- Archive study data and intermediate results
-
Knowledge Contribution
- Document optimization insights and findings
- Update component behavior knowledge
- Note any modeling issues or improvements
- Record algorithmic performance observations
Optimizer Deliverables
- Study Results — Complete optimization output data
- Best Designs — Optimized model files and parameters
- Execution Log — Study progression and issue documentation
- KB Contributions — Optimization insights and lessons learned
Handoff to Post-Processor
Communication: Results review meeting
Artifacts: Study results, best designs, execution documentation
Context: Any issues encountered, unexpected behaviors, recommendations
Phase 5: Results Analysis (Post-Processor)
Responsibility: Results analysis, validation, insight generation
Duration: 2-4 days
Deliverable: Analyzed results and engineering insights
Post-Processor Tasks
-
Results Validation
- Verify optimization results for engineering reasonableness
- Validate best designs against technical requirements
- Check constraint satisfaction and safety margins
- Perform sensitivity analysis on key parameters
-
Performance Analysis
- Quantify performance improvements achieved
- Analyze trade-offs between competing objectives
- Identify design trends and behavioral patterns
- Compare results to baseline and requirements
-
Insight Generation
- Extract engineering insights and design principles
- Identify key parameters and sensitivities
- Document unexpected findings and behaviors
- Generate recommendations for future work
-
Visualization and Documentation
- Create plots, charts, and visual summaries
- Generate technical analysis documentation
- Prepare result summaries for stakeholder review
- Update Knowledge Base with analysis insights
Post-Processor Deliverables
- Results Analysis — Comprehensive technical analysis
- Performance Summary — Quantified improvements and metrics
- Engineering Insights — Design principles and recommendations
- Visual Documentation — Plots, charts, and graphical summaries
Handoff to Reporter
Communication: Analysis review meeting
Artifacts: Analysis results, performance summary, visual documentation
Focus: Key findings, recommendations, and client-relevant insights
Phase 6: Deliverables (Reporter)
Responsibility: Client-facing documentation, final report generation
Duration: 2-3 days
Deliverable: Complete client deliverable package
Reporter Tasks
-
Technical Report Generation
- Synthesize all project work into cohesive technical report
- Translate engineering insights into client-relevant language
- Structure report for client technical and management audiences
- Include methodology, results, and recommendations
-
Deliverable Package Assembly
- Organize optimized models and supporting data
- Create executive summary for management audience
- Prepare technical appendices and detailed data
- Package files for client delivery
-
Quality Review and Finalization
- Review all deliverables for completeness and quality
- Ensure consistency across all documentation
- Validate technical accuracy and clarity
- Prepare final delivery package
-
Client Communication Support
- Prepare presentation materials if requested
- Support client Q&A and follow-up discussions
- Document any post-delivery support requirements
- Plan potential follow-on work identification
Reporter Deliverables
- Technical Report — Comprehensive project documentation
- Executive Summary — Management-focused summary
- Optimized Models — Final design files and supporting data
- Delivery Package — Complete client deliverable set
Final Handoff to CEO
Communication: Project completion review
Artifacts: Complete deliverable package, project summary
Review: Quality gate before CEO approval and client delivery
Communication Protocols
Standard Communication Channels
Primary Coordination: #hq channel
Agent-to-Agent: Direct messages via sessions_send
Complex Tasks: sessions_spawn for sub-agent delegation
CEO Interface: Secretary handles all CEO coordination
OP_09 Communication Standards
All agent communications follow OP_09 protocols for clarity and traceability.
Message Format:
TO: [Agent Name]
FROM: [Agent Name]
RE: [Project Name] - [Phase] - [Specific Topic]
PRIORITY: [High/Medium/Low]
CONTEXT:
[Brief context of the communication]
REQUEST/INFORMATION:
[Specific request or information being communicated]
DELIVERABLES:
[Expected deliverables and timeline]
HANDOFF ARTIFACTS:
[Specific files, data, or documentation being transferred]
Handoff Protocols
Every Phase Transition:
- Handoff Meeting — Direct agent-to-agent discussion
- Artifact Transfer — All relevant files and documentation
- Context Summary — Key points, issues, decisions made
- Success Criteria — Clear definition of phase completion
- Next Phase Kickoff — Introduction and orientation for receiving agent
Decision Logging
Project Decision Log
Every project maintains a decision log tracking key decisions, rationale, and implications.
Decision Entry Format:
## Decision [ID]: [Title] ([Date])
**Phase**: [Project Phase]
**Decision Maker**: [Agent Name]
**Participants**: [Other agents involved]
### Context
[Situation requiring decision]
### Options Considered
[Alternative approaches evaluated]
### Decision
[What was decided]
### Rationale
[Why this decision was made]
### Implications
[Impact on project timeline, scope, approach]
### Approval
[Who approved this decision]
Decision Categories
- Technical Approach — Modeling, analysis methods
- Scope Changes — Requirement modifications
- Resource Allocation — Timeline, effort adjustments
- Quality Standards — Acceptance criteria, review gates
- Client Interface — Communication, expectation management
Quality Gates and Reviews
Phase Review Gates
Each phase includes a quality gate before handoff to the next agent.
Standard Review Criteria:
- Deliverable Completeness — All required outputs produced
- Quality Standards — Meet technical and documentation standards
- Success Criteria — Phase objectives achieved
- Knowledge Capture — Insights documented in KB
- Handoff Readiness — Clear artifacts and communication for next phase
CEO Approval Gates
Certain milestones require CEO (Antoine) approval before proceeding:
Required CEO Approvals:
- Project scope changes exceeding 20% effort increase
- Technical approach changes affecting timeline or deliverables
- Client communication regarding scope, timeline, or budget
- Final deliverable package before client delivery
- Project closure and lessons learned summary
Agent Coordination Patterns
Daily Standups (When Active)
Format: Brief status in #hq channel
Frequency: Daily during active project phases
Content: Yesterday's progress, today's plan, any blockers
Weekly Coordination
Format: Project status meeting
Participants: Active project agents + Manager
Agenda: Progress review, issue resolution, next week planning
Cross-Project Learning
Format: Lessons learned sharing
Frequency: Project completion + monthly review
Purpose: Share insights across projects, improve processes
Escalation Procedures
Technical Issues
- Agent-to-Agent — Direct problem-solving collaboration
- Technical Lead — Complex technical decisions
- Manager — Resource or timeline impacts
- CEO — Client impact or scope changes
Process Issues
- Manager — Workflow or coordination problems
- Team Discussion — Process improvement needs
- CEO — Systematic issues requiring policy changes
Client Issues
- Secretary — All client communication coordination
- Manager — Scope or expectation management
- CEO — Contract or relationship issues
Continuous Improvement
Process Refinement
- Document lessons learned in project KB
- Identify workflow bottlenecks and inefficiencies
- Propose process improvements based on experience
- Update workflows based on successful patterns
Knowledge Sharing
- Cross-pollinate insights between projects
- Share successful techniques and approaches
- Document common problems and solutions
- Build institutional memory through KB accumulation
Team Development
- Identify skill development opportunities
- Share expertise across agents
- Improve collaboration effectiveness
- Enhance communication protocols
Last updated: February 2026