Files
Atomizer/projects/hydrotech-beam/dashboard/OPERATIONS_DASHBOARD.md
2026-02-15 08:00:21 +00:00

1.4 KiB

Hydrotech Beam — Operations Dashboard

Last updated (UTC): 2026-02-14T22:24:29

Pipeline status

  • Study folder sync: healthy (latest artifacts visible)
  • Conflict artifacts: archived under results/archive_conflicts_*
  • Clean rerun archive: results/archive_before_clean_rerun_*

Artifact integrity

Active result files present:

  • doe_results.csv
  • doe_summary.json
  • doe_run.log
  • history.csv
  • history.db
  • optuna_study.db

Process compliance

  • Backend clarity rule: must always run with explicit --backend
  • Documentation boundary rule: enforced
    • Project-specific docs → projects/...
    • Foundational standards → docs/...
  • New standards created:
    • projects/hydrotech-beam/dashboard/MASTER_PLAN.md
    • docs/guides/PKM_DASHBOARD_STANDARD.md
    • docs/guides/DOCUMENTATION_BOUNDARIES.md

Current blockers

  1. Phase gate blocked (insufficient feasible designs)
  2. Need CEO decision on constraint path for next DOE/TPE sequence

Next operational actions (owner)

  1. Manager: keep dashboards refreshed after every run
  2. Tech Lead: finalize recommended constraint staging
  3. Study Builder: prep reproducible command set for next run
  4. Optimizer: define TPE launch criteria + seed strategy
  5. Auditor: enforce gate criteria and data-contract checks

SLA targets (initial)

  • Dashboard freshness: ≤ 1h after major run
  • Run log compliance: ≥ 95%
  • Decision backlog age: ≤ 48h