1.4 KiB
1.4 KiB
Pending Items — Needs Antoine's Attention
P-Adaptive-Isogrid SOTA Review — CRITICAL RISK IDENTIFIED
- Summary: The SOTA review for the P-Adaptive-Isogrid tool is complete. It identified a critical risk: the tool is completely blind to buckling, a primary failure mode.
- Plan: A prioritized list of 5 improvements has been established, with an analytical buckling check as the highest priority.
- Deliverable:
/home/papa/atomizer/hq/condensations/2026-02-16-isogrid-sota-review.md - Action: Inform Antoine as soon as Discord communication is restored.
Thermal Analysis Report
- Summary: A thermal analysis report has been summarized and is ready for review.
- Action: Post to #reports channel once Discord communication is restored.
Delegation Task
- Summary: A delegation task has completed but could not post its report.
- Action: Post to relevant channel once Discord communication is restored.
Hydrotech Beam Project — Status
- Technical gaps resolved, displacement constraint relaxed 10mm → 20mm (DEC-HB-012, CEO approved)
- Mass NaN bug fixed (commit
580ed65) - Next: Pull fix on dalidou, test single trial, re-run full DOE with 20mm constraint
- Updated: 2026-02-14 (digestion cycle)
System Alert: Discord Communication Failure
- The
messagetool is consistently failing. This is preventing automated reports and manual messages from being sent. Needs investigation.