Project Status Dashboard

Updated: 2026-03-20 04:00 AM (Nightly Digestion OP_11)

Active Projects

🔭 GigaBIT M1 — Reference Frame Stiffness Characterization

  • Phase: Active — Model Setup
  • Client: StarSpec (Adyn Miles)
  • Project ID: P04-GigaBIT-M1
  • Created: 2026-03-04
  • Objective: Determine minimum stiffness requirements for StarSpec's reference frame at 5 mirror support interface points. Quantify WFE sensitivity to frame compliance.
  • Method: Hybrid B+D (sensitivity + stiffness sweep), SOL 101, ~42 runs total
  • Key numbers: ΔWFE budget ≤1.0 nm RMS, system allocation ≤22 nm RMS (contract), mechanical target <14 nm RMS
  • Location: repos/Atomizer/projects/gigabit-m1-frame-stiffness/
  • PKM: obsidian-vault/2-Projects/P04-GigaBIT-M1/
  • Owner: Antoine (direct)

P-Zernike-Validation (GigaBIT M1 Risk Reduction)

  • Phase: COMPLETE (2026-03-09)
  • What: Zernike pipeline V&V — 18 test cases pass, cross-validated against prysm v0.21.1 to machine precision (<1e-13 nm)
  • Commits: f9373be (round-trip validation), 075ad36 (prysm cross-validation + report figures)
  • Requested by: Adyn Miles (StarSpec) for risk reduction before M2/M3 ordering
  • Owner: Antoine (direct)

🔩 Hydrotech Beam — Optimization

  • Phase: DOE Phase 1 complete, awaiting Phase 2 (TPE)
  • Status: ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
  • Key numbers: 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
  • Next: Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
  • Note: Lower priority — Antoine focused on GigaBIT M1 work
  • Owner: Tech Lead + Study Builder

📐 Atomizer Project Standard

  • Phase: Review complete, awaiting CEO decision
  • Status: 🟡 AWAITING APPROVAL
  • Deliverables ready: Full spec, tech-lead review, auditor audit, secretary synthesis
  • Location: shared/standardization/
  • Key decision: Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
  • Owner: Manager

🔺 Adaptive Isogrid Plate Lightweighting

  • Phase: Technical spec locked, reviews complete
  • Status: 🟡 AWAITING CEO REVIEW
  • Deliverables ready: Full technical spec (32KB), optimizer review, tech-lead review, webster review
  • Location: shared/war-room-isogrid/
  • Next: CEO review → implementation planning
  • Owner: Manager / Tech Lead

📦 Atomizer V2 Migration

  • Phase: COMPLETE (2026-02-23)
  • Post-migration: V1 tagged v1-final, kept active. AOM→Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work.
  • Remaining roadmap: Items 4-9 in ROADMAP-NEXT.md

🏢 Atomizer/HQ Separation

  • Phase: COMPLETE (2026-02-23)
  • Decision: DEC-037

Infrastructure Updates

  • Tier 2 dev workflow added (2026-03-07, commit b3162aa): Windows test runner (run_tests.bat), result sync via Syncthing, JSON result capture, --quick mode for NX-independent tests
  • Daily HQ syncs continue (automated commits through Mar 12)

Outstanding Blockers

  • 3 projects awaiting CEO input (Hydrotech, Project Standard, Isogrid) — deprioritized while Antoine focuses on GigaBIT M1
  • Webster web_search API key still missing (needs Mario, since Feb 19)

Mission Control — Stale Tasks

Several MC tasks have been in in_progress or review since mid-February with no updates:

  • ATZ-2f1634: P-Adaptive-Isogrid (in_progress)
  • ATZ-74f02a: Atomizer Overhaul (in_progress)
  • ATZ-839392: Project Standard — Introspection (in_progress)
  • ATZ-749aac, ATZ-d3fce9, ATZ-05c017, ATZ-21695d: all in review These should be resolved (completed or closed) when Antoine returns to HQ work.