Hydrotech Beam — Executive Dashboard

Last updated (UTC): 2026-02-14T22:24:29 Source: studies/01_doe_landscape/results/doe_summary.json + doe_results.csv

CEO 60-second view

  • Phase: DOE Phase 1 (LHS)
  • Gate status: BLOCKED (Phase 1 → Phase 2)
  • Total trials: 51
  • Solved: 39 (76.5%, below 80% gate)
  • Geo-infeasible: 12
  • Fully feasible designs: 0 (gate requires ≥5)

Top signals

  • Mass extraction now looks real (no NaN in solved rows)
  • Syncthing cleanup completed (active conflict files archived)
  • ⚠️ Displacement constraint is the blocker (0/39 displacement-feasible at 10 mm)
  • ⚠️ DOE→TPE gate cannot pass with current limits/bounds

Decision hotlist (CEO)

  1. Approve next constraint strategy:
    • Option A (recommended): exploratory rerun at 20 mm displacement
    • Option B: keep 10 mm and tighten design bounds for stiffness
  2. Approve TPE entry rule (with strict gate or conditional gate)

Recommendation (current)

Proceed with Option A for exploration (20 mm), then tighten toward 10 mm in staged optimization.

KPI snapshot

  • Solve success rate: 76.5%
  • Feasibility rate (full): 0.0%
  • Best solved mass: 686.289 kg (not fully feasible)
  • Best trial ID by mass: 26