New project structure with knowledge base integration: - kb/ with components, materials, fea, dev generations - models/ for reference NX files (golden copies) - studies/ for self-contained optimization campaigns - deliverables/ for final outputs - DECISIONS.md decision log (6 decisions tracked) - BREAKDOWN.md (moved from 1_breakdown/) - Gen 001 created from intake + technical breakdown KB extension file: atomizer/shared/skills/knowledge-base-atomizer-ext.md Refs: DEC-HB-004, DEC-HB-005, DEC-HB-006
2.0 KiB
2.0 KiB
Gen 001 — Project Intake + Technical Breakdown
Date: 2026-02-09 Sources: CEO intake in #project-hydrotech-beam, Technical Lead analysis Author: Manager 🎯
What Happened
- Antoine submitted the Hydrotech beam optimization request via #project-hydrotech-beam
- Manager created project folder and CONTEXT.md from intake data
- Technical Lead produced a full technical breakdown (BREAKDOWN.md)
- Manager and CEO agreed on project structure (KB-integrated layout)
Key Findings
From Intake
- Sandwich I-beam, steel, with lightening holes in web
- 4 design variables (3 continuous + 1 integer)
- Current design: ~974 kg, ~22 mm tip displacement
- Targets: minimize mass, displacement ≤ 10 mm, stress ≤ 130 MPa
From Technical Breakdown
- Critical: Baseline already violates displacement constraint (22 mm vs 10 mm)
- Single-objective formulation recommended (minimize mass, constrain the rest)
- Two-phase approach: DoE (40–50 trials) then TPE (60–100 trials)
- Significant variable interactions expected (sandwich theory, hole interactions)
- 9 gaps identified needing CEO input
- Overall risk: MEDIUM-HIGH (feasible region may be tight or empty)
KB Entries Created
components/sandwich-beam.md— component file with specs, behavior, interactionsmaterials/steel-aisi.md— placeholder, needs NX model datafea/models/sol101-static.md— solver setup, pending gap resolution
Decisions Made
- DEC-HB-004: KB-integrated project structure (Approved)
- DEC-HB-005: No Notion, Gitea + .md only (Approved)
- DEC-HB-006: KB skill extension pattern, no fork (Approved)
Open Items
9 gaps pending CEO input (see _index.md):
- G1–G2: Geometry and loading (most critical)
- G3–G4: Result extraction specifics
- G5: Geometric feasibility at extremes
- G6–G8: NX model details
- G9: Stress allowable basis
Next Steps
- Resolve gaps G1–G9 with Antoine
- Upload reference models to
models/ - Begin NX model introspection
- Set up first study (DoE)