Files
Atomizer/projects/hydrotech-beam/kb/dev/gen-001.md
Antoine 9541958eae Restructure Hydrotech Beam project — KB-integrated layout
New project structure with knowledge base integration:
- kb/ with components, materials, fea, dev generations
- models/ for reference NX files (golden copies)
- studies/ for self-contained optimization campaigns
- deliverables/ for final outputs
- DECISIONS.md decision log (6 decisions tracked)
- BREAKDOWN.md (moved from 1_breakdown/)
- Gen 001 created from intake + technical breakdown

KB extension file: atomizer/shared/skills/knowledge-base-atomizer-ext.md

Refs: DEC-HB-004, DEC-HB-005, DEC-HB-006
2026-02-09 02:18:29 +00:00

2.0 KiB
Raw Blame History

Gen 001 — Project Intake + Technical Breakdown

Date: 2026-02-09 Sources: CEO intake in #project-hydrotech-beam, Technical Lead analysis Author: Manager 🎯


What Happened

  1. Antoine submitted the Hydrotech beam optimization request via #project-hydrotech-beam
  2. Manager created project folder and CONTEXT.md from intake data
  3. Technical Lead produced a full technical breakdown (BREAKDOWN.md)
  4. Manager and CEO agreed on project structure (KB-integrated layout)

Key Findings

From Intake

  • Sandwich I-beam, steel, with lightening holes in web
  • 4 design variables (3 continuous + 1 integer)
  • Current design: ~974 kg, ~22 mm tip displacement
  • Targets: minimize mass, displacement ≤ 10 mm, stress ≤ 130 MPa

From Technical Breakdown

  • Critical: Baseline already violates displacement constraint (22 mm vs 10 mm)
  • Single-objective formulation recommended (minimize mass, constrain the rest)
  • Two-phase approach: DoE (4050 trials) then TPE (60100 trials)
  • Significant variable interactions expected (sandwich theory, hole interactions)
  • 9 gaps identified needing CEO input
  • Overall risk: MEDIUM-HIGH (feasible region may be tight or empty)

KB Entries Created

  • components/sandwich-beam.md — component file with specs, behavior, interactions
  • materials/steel-aisi.md — placeholder, needs NX model data
  • fea/models/sol101-static.md — solver setup, pending gap resolution

Decisions Made

  • DEC-HB-004: KB-integrated project structure (Approved)
  • DEC-HB-005: No Notion, Gitea + .md only (Approved)
  • DEC-HB-006: KB skill extension pattern, no fork (Approved)

Open Items

9 gaps pending CEO input (see _index.md):

  • G1G2: Geometry and loading (most critical)
  • G3G4: Result extraction specifics
  • G5: Geometric feasibility at extremes
  • G6G8: NX model details
  • G9: Stress allowable basis

Next Steps

  1. Resolve gaps G1G9 with Antoine
  2. Upload reference models to models/
  3. Begin NX model introspection
  4. Set up first study (DoE)