Files
Atomizer/hq/workspaces/manager/memory/2026-02-22.md

5.3 KiB

2026-02-22

Nightly Digestion — OP_11 (Incremental)

STORE

  • New artifact: MIND_MAP_AUDIT.md (16KB) created Feb 21 — comprehensive audit of Excalidraw master mind map vs actual codebase/docs. 385 text nodes reviewed. Identifies gaps between mind map and reality.
  • No new Antoine corrections. No new project activity. Weekend quiet period continues.

DISCARD

  • Manager memory files: oldest is Feb 8 (14 days) — all within 30-day retention
  • Flagged: Tech Lead has 2 legacy files from 2025 (2025-02-09.md, 2025-07-17.md) — pre-HQ era Hydrotech Beam logs. Contains useful domain knowledge (NXOpenSolver implementation, technical breakdown). Not deleting — but should be consolidated into Tech Lead's MEMORY.md or project KB during next deep digestion.
  • No contradictions found in current memory files
  • No stale TODOs — all 3 active projects genuinely awaiting CEO input

SORT

  • MIND_MAP_AUDIT.md lives correctly at workspace root (one-off audit artifact, not a daily note)
  • No patterns to promote — quiet weekend

REPAIR

  • PROJECT_STATUS.md still accurate — no state changes since Feb 20
  • MEMORY.md still accurate
  • All key paths verified: shared/standardization/, shared/war-room-isogrid/, shared/war-room-overhaul/ intact
  • Outstanding blockers unchanged:
    • Hydrotech Beam: blocked on Antoine (dalidou pull + test)
    • Project Standard: awaiting CEO decision (full spec vs MVS)
    • Adaptive Isogrid: awaiting CEO review
    • Auditor P-Adaptive-Isogrid block (since Feb 16): still unresolved
    • Webster web_search API key: still needs Mario

EVOLVE

  • No process issues this cycle
  • Observation: 3 projects all blocked on CEO review simultaneously. When Antoine returns, priority triage will be needed to avoid bottleneck.
  • MIND_MAP_AUDIT provides roadmap for docs/mind-map alignment — useful for next active work phase

SELF-DOCUMENT

  • No changes needed — docs current

AOM Project — MASSIVE Session (afternoon)

What Happened

Antoine came in and asked about AOM project status. Resulted in a multi-hour session covering:

  1. AOM Phase 3 completed — wrote 6 remaining docs (Decision Log, Evolution Principles, Failure Patterns, Digestion Protocol, Context Engineering, Project KB Template). AOM went from ~85% → 100% content (30 docs, ~7,600 lines).

  2. Phase 4 (LLM Layer) completed — 3 docs: CLAUDE.md v2 (150 lines replacing 871-line v1), Context-Loading Strategy (4-layer system), AOM Skill Module.

  3. Phase 5 (Living Protocol) completed — maintenance rules, update triggers, health checks, ownership model.

  4. Tool-Agnostic Architecture Plan — Antoine asked for a plan to make Atomizer solver-agnostic. Researched the Arsenal doc (800+ lines), wrote ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md (28KB) with: 3 abstraction layers (contracts → processors → orchestrator), AtomizerSpec v3.0 with ToolchainConfig, 7-sprint implementation roadmap, V2 repo structure.

  5. AOM V2 Integration — Antoine said "document first, code later." Audited all 30 AOM docs for NX-hardcoding, created 5-phase integration plan. Executed ALL phases:

    • Phase A: 4 new foundation docs (Tool-Agnostic Architecture, Data Contracts Reference, Processor Dev Guide, Arsenal Reference)
    • Phase B: 5 core rewrites (System Architecture, Component Map, Codebase Architecture, Extension Points, Multi-Solver Roadmap)
    • Phase C: 19 surgical updates across all pillars
    • Phase D: 5 new solver guides (CalculiX, Gmsh, OpenFOAM, Multi-Physics, MCP Server Dev)
    • Phase E: MAP + final updates

    Result: AOM grew from 37 → 48 docs, ~8,830 lines. Zero NX-only assumptions remain.

  6. V2 Migration Master Plan — Antoine confirmed new repo at http://192.168.86.50:3000/Antoine/Atomizer-V2 (Gitea, currently empty). Wrote comprehensive migration plan (28KB): complete V2 repo structure, what migrates vs doesn't, 6-phase execution (8 days), .gitignore, pyproject.toml, README.md draft, Obsidian sync strategy.

Key Decisions Made (by Antoine)

  • DEC-030: Tool-agnostic architecture approved
  • DEC-032: New repo (V2) instead of cleaning V1
  • DEC-033: Documentation-first — AOM before code
  • DEC-021: AOM stays in Obsidian until migration
  • V2 Gitea repo created at 192.168.86.50:3000/Antoine/Atomizer-V2

CEO Decisions Still Pending (for migration)

  1. License type (Apache 2.0 / MIT)
  2. GitHub repo name
  3. Obsidian ↔ repo sync strategy
  4. HQ separation (in V2 or separate?)
  5. Confirm projects/ stays off git
  6. GitHub visibility (public/private)
  7. Timing to start

Files Created/Modified Today

  • P-Atomizer-Operating-Manual/ — 11 new docs, 5 rewrites, 19 updates
  • Atomizer-AtomasteAI/Development/ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md (28KB)
  • Atomizer-AtomasteAI/Development/ATOMIZER-V2-MIGRATION-MASTERPLAN.md (28KB)
  • Integration plan archived to P-Atomizer-Operating-Manual/Archive/

Blocker: Sub-agent Spawning

  • sessions_spawn fails with "gateway closed (1008): pairing required" — both with agentId=auditor and without
  • This blocks delegating work to Auditor (or any sub-agent)
  • Asked Antoine for preference: self-review on Opus or wait for infra fix
  • No response yet as of 7pm

Next Steps

  • Awaiting Antoine's decision on auditor review approach (self vs wait for infra)
  • Antoine reviewing migration master plan
  • After CEO approval → execute Phase 0 (repo bootstrap + AOM deployment)