5.3 KiB
2026-02-22
Nightly Digestion — OP_11 (Incremental)
STORE
- New artifact:
MIND_MAP_AUDIT.md(16KB) created Feb 21 — comprehensive audit of Excalidraw master mind map vs actual codebase/docs. 385 text nodes reviewed. Identifies gaps between mind map and reality. - No new Antoine corrections. No new project activity. Weekend quiet period continues.
DISCARD
- Manager memory files: oldest is Feb 8 (14 days) — all within 30-day retention
- Flagged: Tech Lead has 2 legacy files from 2025 (
2025-02-09.md,2025-07-17.md) — pre-HQ era Hydrotech Beam logs. Contains useful domain knowledge (NXOpenSolver implementation, technical breakdown). Not deleting — but should be consolidated into Tech Lead's MEMORY.md or project KB during next deep digestion. - No contradictions found in current memory files
- No stale TODOs — all 3 active projects genuinely awaiting CEO input
SORT
- MIND_MAP_AUDIT.md lives correctly at workspace root (one-off audit artifact, not a daily note)
- No patterns to promote — quiet weekend
REPAIR
- PROJECT_STATUS.md still accurate — no state changes since Feb 20
- MEMORY.md still accurate
- All key paths verified:
shared/standardization/,shared/war-room-isogrid/,shared/war-room-overhaul/intact - Outstanding blockers unchanged:
- Hydrotech Beam: blocked on Antoine (dalidou pull + test)
- Project Standard: awaiting CEO decision (full spec vs MVS)
- Adaptive Isogrid: awaiting CEO review
- Auditor P-Adaptive-Isogrid block (since Feb 16): still unresolved
- Webster web_search API key: still needs Mario
EVOLVE
- No process issues this cycle
- Observation: 3 projects all blocked on CEO review simultaneously. When Antoine returns, priority triage will be needed to avoid bottleneck.
- MIND_MAP_AUDIT provides roadmap for docs/mind-map alignment — useful for next active work phase
SELF-DOCUMENT
- No changes needed — docs current
AOM Project — MASSIVE Session (afternoon)
What Happened
Antoine came in and asked about AOM project status. Resulted in a multi-hour session covering:
-
AOM Phase 3 completed — wrote 6 remaining docs (Decision Log, Evolution Principles, Failure Patterns, Digestion Protocol, Context Engineering, Project KB Template). AOM went from ~85% → 100% content (30 docs, ~7,600 lines).
-
Phase 4 (LLM Layer) completed — 3 docs: CLAUDE.md v2 (150 lines replacing 871-line v1), Context-Loading Strategy (4-layer system), AOM Skill Module.
-
Phase 5 (Living Protocol) completed — maintenance rules, update triggers, health checks, ownership model.
-
Tool-Agnostic Architecture Plan — Antoine asked for a plan to make Atomizer solver-agnostic. Researched the Arsenal doc (800+ lines), wrote
ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md(28KB) with: 3 abstraction layers (contracts → processors → orchestrator), AtomizerSpec v3.0 with ToolchainConfig, 7-sprint implementation roadmap, V2 repo structure. -
AOM V2 Integration — Antoine said "document first, code later." Audited all 30 AOM docs for NX-hardcoding, created 5-phase integration plan. Executed ALL phases:
- Phase A: 4 new foundation docs (Tool-Agnostic Architecture, Data Contracts Reference, Processor Dev Guide, Arsenal Reference)
- Phase B: 5 core rewrites (System Architecture, Component Map, Codebase Architecture, Extension Points, Multi-Solver Roadmap)
- Phase C: 19 surgical updates across all pillars
- Phase D: 5 new solver guides (CalculiX, Gmsh, OpenFOAM, Multi-Physics, MCP Server Dev)
- Phase E: MAP + final updates
Result: AOM grew from 37 → 48 docs, ~8,830 lines. Zero NX-only assumptions remain.
-
V2 Migration Master Plan — Antoine confirmed new repo at
http://192.168.86.50:3000/Antoine/Atomizer-V2(Gitea, currently empty). Wrote comprehensive migration plan (28KB): complete V2 repo structure, what migrates vs doesn't, 6-phase execution (8 days), .gitignore, pyproject.toml, README.md draft, Obsidian sync strategy.
Key Decisions Made (by Antoine)
- DEC-030: Tool-agnostic architecture approved
- DEC-032: New repo (V2) instead of cleaning V1
- DEC-033: Documentation-first — AOM before code
- DEC-021: AOM stays in Obsidian until migration
- V2 Gitea repo created at
192.168.86.50:3000/Antoine/Atomizer-V2
CEO Decisions Still Pending (for migration)
- License type (Apache 2.0 / MIT)
- GitHub repo name
- Obsidian ↔ repo sync strategy
- HQ separation (in V2 or separate?)
- Confirm projects/ stays off git
- GitHub visibility (public/private)
- Timing to start
Files Created/Modified Today
P-Atomizer-Operating-Manual/— 11 new docs, 5 rewrites, 19 updatesAtomizer-AtomasteAI/Development/ATOMIZER-TOOL-AGNOSTIC-ARCHITECTURE.md(28KB)Atomizer-AtomasteAI/Development/ATOMIZER-V2-MIGRATION-MASTERPLAN.md(28KB)- Integration plan archived to
P-Atomizer-Operating-Manual/Archive/
Blocker: Sub-agent Spawning
sessions_spawnfails with "gateway closed (1008): pairing required" — both withagentId=auditorand without- This blocks delegating work to Auditor (or any sub-agent)
- Asked Antoine for preference: self-review on Opus or wait for infra fix
- No response yet as of 7pm
Next Steps
- Awaiting Antoine's decision on auditor review approach (self vs wait for infra)
- Antoine reviewing migration master plan
- After CEO approval → execute Phase 0 (repo bootstrap + AOM deployment)