Files
Atomizer/hq/skills/atomizer-protocols/protocols/OP_10_PROJECT_INTAKE.md
Antoine 3289a76e19 feat: add Atomizer HQ multi-agent cluster infrastructure
- 8-agent OpenClaw cluster (Manager, Tech-Lead, Secretary, Auditor,
  Optimizer, Study-Builder, NX-Expert, Webster)
- Orchestration engine: orchestrate.py (sync delegation + handoffs)
- Workflow engine: YAML-defined multi-step pipelines
- Agent workspaces: SOUL.md, AGENTS.md, MEMORY.md per agent
- Shared skills: delegate, orchestrate, atomizer-protocols
- Capability registry (AGENTS_REGISTRY.json)
- Cluster management: cluster.sh, systemd template
- All secrets replaced with env var references
2026-02-15 21:18:18 +00:00

2.7 KiB

OP_10 — Project Intake Protocol

Purpose

Defines how new projects enter the Atomizer Engineering system.

Trigger

Antoine (CEO) posts a new project request, typically in #hq or directly to #secretary.

Steps

Step 1: Manager Acknowledges (< 5 min)

  • Manager acknowledges receipt in the originating channel
  • Creates a project channel: #<client>-<short-description>
  • Posts project kickoff message in new channel

Step 2: Technical Breakdown (< 4 hours)

Manager hands off to Technical Lead (per OP_09):

  • Input: Contract/requirements from Antoine
  • Output: Structured breakdown containing:
    • Geometry description
    • Design variables (parameters to optimize)
    • Objectives (what to minimize/maximize)
    • Constraints (limits that must be satisfied)
    • Solver requirements (SOL type, load cases)
    • Gap analysis (what's missing or unclear)

Step 3: Algorithm Recommendation (after Step 2)

Manager hands off to Optimizer:

  • Input: Technical Lead's breakdown
  • Output: Algorithm recommendation with:
    • Recommended algorithm and why
    • Population/trial budget
    • Expected convergence behavior
    • Alternatives considered

Step 4: Project Plan Compilation (Manager)

Manager compiles:

  • Technical breakdown
  • Algorithm recommendation
  • Timeline estimate
  • Risk assessment

Step 5: CEO Approval

Secretary presents the compiled plan to Antoine in #secretary:

📋 **New Project Plan — [Project Name]**

**Summary:** [1-2 sentences]
**Timeline:** [Estimated duration]
**Cost:** [Estimated API cost for this project]
**Risk:** [High/Medium/Low + key risk]

⚠️ **Needs CEO approval to proceed.**

[Full plan in thread ↓]

Step 6: Kickoff (after approval)

Manager posts in project channel:

  • Approved plan
  • Agent assignments
  • First task handoffs
  • Timeline milestones

Templates

Project Kickoff Message

🎯 **Project Kickoff: [Project Name]**

**Client:** [Client name]
**Objective:** [What we're optimizing]
**Timeline:** [Start → End]
**Team:** [List of agents involved]

**Status:** 🟢 Active

**Milestones:**
1. [ ] Technical breakdown
2. [ ] Algorithm selection
3. [ ] Study build
4. [ ] Execution
5. [ ] Analysis
6. [ ] Audit
7. [ ] Report
8. [ ] Delivery

CONTEXT.md Template

Create in knowledge_base/projects/<project>/CONTEXT.md:

# CONTEXT.md — [Project Name]

## Client
[Client name and context]

## Objective
[What we're optimizing and why]

## Key Parameters
| Parameter | Range | Units | Notes |
|-----------|-------|-------|-------|

## Constraints
- [List all constraints]

## Model
- NX assembly: [filename]
- FEM: [filename]
- Simulation: [filename]
- Solver: [SOL type]

## Decisions
- [Date]: [Decision made]

## Status
Phase: [Current phase]
Channel: [Slack channel]