2.2 KiB
2.2 KiB
Archive Summary — 2026-02-10
Biggest single day of Hydrotech Beam work. Full details archived from daily log at 30-day threshold.
Key Events
- Received 3 KBS capture sessions from Antoine (NX/Simcenter walkthrough of Hydrotech Beam model)
- Tech Lead processed sessions → KB Gen 002 update (commit
b88657b) - Mass corrected to 1,133.01 kg (
p173) — Antoine correction, ground truth - Binary introspection of Beam.prt → full expression table extracted (commit
15a457d) - DV baselines confirmed NOT round: face_thickness=21.504, core_thickness=25.162
beam_lenghthas TYPO in NX (no 'h') — must use exact spelling- Gaps G12-G14 closed
Optimization Pipeline Built (Full Chain)
- Optimizer updated strategy with corrected baselines (commit
3e51804) - Auditor reviewed → APPROVED WITH CONDITIONS (hole spacing formula + web height constraint fixed, commit
94bff37) - Study Builder completed Phase 1 code: run_doe.py, sampling.py, geometric_checks.py, nx_interface.py (commit
017b90f) - Study Builder delivered NXOpenSolver wrapper around existing Atomizer engine (commit
33180d6) - Tech Lead refined NXOpenSolver v2 with auto-detection + fallbacks (commit
390ffed) - Antoine tested on dalidou → 2 bugs fixed (commit
135698d) - Full refactor of nx_interface.py → AtomizerNXSolver (commit
126f0bb)
Key Technical Facts (Preserved)
- Beam: 5,000mm length, cantilever (left fixed, right 10,000 kgf down)
- Hole span = 4,000mm (
p6), kept fixed (Manager decision) - Material: ANSI Steel 1005 (future: aluminum 6061, stainless ANSI 310)
- Mesh: CQUAD4 thin shells, mid-surface idealization, element size 67.4/2
- Conda env:
atomizeron Windows (dalidou), all deps pre-installed - Windows path:
C:\Users\antoi\Atomizer\projects\hydrotech-beam\ - Existing engine reused: NXSolver + NXParameterUpdater + pyNastran extractors
Infra Fixes
- Study Builder model corrected (
claude-sonnet-5→claude-sonnet-4-20250514) - API auth propagated to all agents from Manager's auth-profiles.json
CEO Requests Logged
- NX Simcenter 3D MCP server — Phase 2/3 roadmap item
Open at EOD
- Antoine to test
--backend nxopensmoke test on dalidou - Full 51-trial Phase 1 run pending
- Phase 2 TPE optimization pending