feat: add Atomizer HQ multi-agent cluster infrastructure
- 8-agent OpenClaw cluster (Manager, Tech-Lead, Secretary, Auditor,
Optimizer, Study-Builder, NX-Expert, Webster)
- Orchestration engine: orchestrate.py (sync delegation + handoffs)
- Workflow engine: YAML-defined multi-step pipelines
- Agent workspaces: SOUL.md, AGENTS.md, MEMORY.md per agent
- Shared skills: delegate, orchestrate, atomizer-protocols
- Capability registry (AGENTS_REGISTRY.json)
- Cluster management: cluster.sh, systemd template
- All secrets replaced with env var references
2026-02-15 21:18:18 +00:00
# Project Status Dashboard
2026-02-28 10:00:23 +00:00
Updated: 2026-02-28 04:00 AM (Nightly Digestion OP_11)
2026-02-20 10:00:13 +00:00
## Active Projects
2026-02-24 10:00:18 +00:00
### 📦 Atomizer V2 Migration
- **Phase:** ✅ COMPLETE (2026-02-23)
- **What happened:** 8 commits pushed to Gitea. 218+ Python files, 58 tests passing. All phases done: repo bootstrap, core engine port, integration testing, reference implementation, CLAUDE.md, Data Contracts (5 dataclasses), Pipeline-NX integration tests. Dalidou validated: `import atomizer` v2.0.0 + 24/24 tests on Windows.
- **Post-migration:** Coherence audit delivered (conditional pass, 3 critical findings fixed in preflight). V1 tagged `v1-final` , kept active for current optimizations. AOM→Obsidian auto-sync via crontab. Phase 6 (archive V1) deferred until Antoine switches production work.
- **Remaining roadmap:** Items 4-9 in ROADMAP-NEXT.md (docs/dev/)
- **Location:** `192.168.86.50:3000/Antoine/Atomizer-V2` , Obsidian vault `P-Atomizer-Operating-Manual/`
- **Owner:** Manager
### 🏢 Atomizer/HQ Separation
- **Phase:** ✅ COMPLETE (2026-02-23)
- **Decision:** DEC-037 — Atomizer = product (V2 repo), HQ = AI operations team (HQ repo). AOM governs the product. 7 AOM docs updated. HQ repo pushed to Gitea (218 files).
2026-02-23 10:00:17 +00:00
- **Owner:** Manager
2026-02-20 10:00:13 +00:00
### 🔩 Hydrotech Beam — Optimization
- **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE)
- **Status:** ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
- **Key numbers:** 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
- **Next:** Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
- **Owner:** Tech Lead + Study Builder
### 📐 Atomizer Project Standard
- **Phase:** Review complete, awaiting CEO decision
- **Status:** 🟡 AWAITING APPROVAL
- **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis
- **Location:** `shared/standardization/`
- **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
- **Owner:** Manager
### 🔺 Adaptive Isogrid Plate Lightweighting
- **Phase:** Technical spec locked, reviews complete
- **Status:** 🟡 AWAITING CEO REVIEW
- **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review
- **Location:** `shared/war-room-isogrid/`
- **Next:** CEO review → implementation planning
- **Owner:** Manager / Tech Lead
### 🔬 Material Research (M2 Mirror Trade Study)
- **Phase:** Research complete
- **Status:** ✅ Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC)
- **Next:** Awaiting project context to produce recommendation
- **Owner:** Webster
2026-02-23 10:00:17 +00:00
## Outstanding Blockers
2026-02-27 10:00:23 +00:00
- **Auditor** blocked on P-Adaptive-Isogrid review since Feb 16 (11 days — chronic, moot until CEO reviews Isogrid; closing next active session)
- **Webster** web_search API key missing (needs Mario, since Feb 19 — 8 days)
2026-02-24 10:00:18 +00:00
- **3 projects** simultaneously awaiting CEO input — triage needed when Antoine returns
2026-02-20 10:00:13 +00:00
2026-02-25 10:00:23 +00:00
## Recent Activity
- 2026-02-24: **Arsenal Development Plan ** — Tech Lead produced dev blueprint (multi-solver expansion, 6-sprint roadmap). Auditor delivered risk analysis + quality gates (flagged 5 simultaneous problem streams, recommended phased de-risking). Good team output.
2026-02-24 10:00:18 +00:00
- 2026-02-23: V2 Migration COMPLETE (8 commits, 218+ files, 58 tests). HQ Separation COMPLETE (DEC-037). Coherence audit + preflight fixes delivered.
- 2026-02-22: AOM 100% complete (48 docs), tool-agnostic architecture
2026-02-20 10:00:13 +00:00
- 2026-02-18: Project standardization package assembled and reviewed