# Project Status Dashboard
2026-02-20 10:00:13 +00:00
Updated: 2026-02-20 04:00 AM (Nightly Digestion OP_11)
## Active Projects
### 🔩 Hydrotech Beam — Optimization
- **Phase:** DOE Phase 1 complete, awaiting Phase 2 (TPE)
- **Status:** ⏸️ BLOCKED — Mass NaN fix committed (580ed65), needs pull + test on dalidou
- **Key numbers:** 39/51 trials solved, 0 fully feasible (displacement), constraint relaxed to 20mm
- **Next:** Antoine pulls fix on dalidou → test single trial → rerun DOE → Phase 2 TPE
- **Owner:** Tech Lead + Study Builder
### 📐 Atomizer Project Standard
- **Phase:** Review complete, awaiting CEO decision
- **Status:** 🟡 AWAITING APPROVAL
- **Deliverables ready:** Full spec, tech-lead review, auditor audit, secretary synthesis
- **Location:** `shared/standardization/`
- **Key decision:** Auditor recommends MVS (minimal viable standard) over full spec. Antoine to decide.
- **Owner:** Manager
### 🔺 Adaptive Isogrid Plate Lightweighting
- **Phase:** Technical spec locked, reviews complete
- **Status:** 🟡 AWAITING CEO REVIEW
- **Deliverables ready:** Full technical spec (32KB), optimizer review, tech-lead review, webster review
- **Location:** `shared/war-room-isogrid/`
- **Architecture:** Python Brain + NX Hands + Atomizer Manager (semi-automated isogrid optimization)
- **Next:** CEO review → implementation planning
- **Owner:** Manager / Tech Lead
### 🔬 Material Research (M2 Mirror Trade Study)
- **Phase:** Research complete
- **Status:** ✅ Data collected (Zerodur, Clearceram-Z HS, Invar 36, SiC)
- **Next:** Awaiting project context to produce recommendation
- **Owner:** Webster
## Pending Items
- Auditor blocked on P-Adaptive-Isogrid review (needs Tech Lead response since Feb 16)
- Secretary TASK-002 delivery failed (Slack token issue) — resolved via TASK-004
## Recent Completions (last 7 days)
- 2026-02-18: Project standardization package assembled and reviewed
- 2026-02-19: Auditor spec audit completed
- 2026-02-17: System test orchestration validated (TASK-001 through TASK-004)